| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57.4 LAccepted-AOC | ₹57.4 L | 1 | Accepted-AOC Work awarded to L1 bidder w.e.f 16.10.2022 for two years duration |
| 2 | 2₹59.5 L+₹2.1 L (3.66%)Rejected-Finance 37 1A MOMINPORE ROAD KOLKATA 700 023 | KOLKATA | MURSHIDABAD | WEST BENGAL | 700023 | ₹59.5 L+₹2.1 L (3.66%) | 2 | Rejected-Finance NOT L1 BIDDER |
| 3 | 3₹62.0 L+₹4.6 L (8.06%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | ₹62.0 L+₹4.6 L (8.06%) | 3 | Rejected-Finance NOT L1 BIDDER |
| 4 | 4₹62.8 L+₹5.4 L (9.48%)Rejected-Finance | ₹62.8 L+₹5.4 L (9.48%) | 4 | Rejected-Finance NOT L1 BIDDER |
| 5 | 5₹63.0 L+₹5.6 L (9.76%)Rejected-Finance 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | ₹63.0 L+₹5.6 L (9.76%) | 5 | Rejected-Finance NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | COOL STAR L7 | AIRTECH ENGINEERS L4 | SNOWMEX ENGINEERS LIMITED L3 | Gnosi Tech Services L1 | M/s AGFA L2 | ROSHAN REFRIGERATION AND ELECTRICALS L6 | M K ENTERPRISES L5 | HRJ REFRIGERATION PVT LTD L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2.00Sub Head-I: Annual Operation of Split AC, VRF AC, Package AC and AHUs at AAI occupied area, KIA & Siddlaghatta. | |||||||||||
| 3.00 | Round the clock operation of following Air-Conditioning Units including Recording of parameters reading on hourly basis and regular cleaning including providing documents to maintain the parameters readings for continues operation for all days including Sundays and Holidays as required as per the special conditions and scope of work detailed there in etc.as required.
a) 59TR (13X2+11X3) Package AC plant at Radar Building.
b) AHU's- 7 Nos at Alpha1 Building and ATC tower.
c) 54HP (18x3) VRF AC at Alpha-1 Building as and when required.
d) Ductable and Casstte AC at ATC Tower.
(e) Split Ac's at KIA & Siddlaghatta | 24 | MONTH | 2,22,000 ₹53,28,000 | 2,28,136 ₹54,75,264 | 2,35,000 ₹56,40,000 | 2,01,300 ₹48,31,200 | 2,19,500 ₹52,68,000 | 2,23,373.59 ₹53,60,966.16 | 2,00,000 ₹48,00,000 | 1,90,000 ₹45,60,000 Lowest |
| 4.00Sub Head-II: Annual Comprehensive Maintenance of Following AC units | |||||||||||
| 5.00Annual Comprehensive maintenance (periodical / preventive and break down as per OEM standard and Special condition of contract ) of following Air Conditioners along with all accessories & ancilliaries viz : compressor , cooling coil (Indoor Unit), blower , condenser , thermostat and electronic & electrical part upto socket out let etc. installed at ATC Tower BIAL, CNS Installations and DVOR at Sidhalagatta, inclusive of all spare parts, consumables, gas charging, overhauling, rewinding, insulating, repairing/replacement of electrical / electronics components of control panels, painting, cutting , fixing, plumbing, transportation, loading and unloading etc. complete as required. | |||||||||||
| 6.00 | a) 02 Nos of 5 TR Ductable (Inverter Type) type AC unit. | 24 | MONTH | 6,000 ₹1,44,000 | 1,500 ₹36,000 | 1,500 ₹36,000 | 2,400 ₹57,600 | 500 ₹12,000 Lowest | 1,833.33 ₹43,999.92 | 3,000 ₹72,000 | 6,000 ₹1,44,000 |
| 7.00 | b) 08 Nos of 4 TR Casstte (Inverter Type) type AC unit | 24 | MONTH | 5,000 ₹1,20,000 | 2,100 ₹50,400 | 2,000 ₹48,000 | 3,000 ₹72,000 | 1,600 ₹38,400 Lowest | 3,000 ₹72,000 | 5,333 ₹1,27,992 | 24,000 ₹5,76,000 |
| 8.00 | c) 07 Nos of 2 TR Split AC unit /2 TR Casette Type AC | 24 | MONTH | 2,500 ₹60,000 | 2,500 ₹60,000 | 1,550 ₹37,200 | 3,150 ₹75,600 | 700 ₹16,800 Lowest | 2,333.33 ₹55,999.92 | 2,600 ₹62,400 | 14,000 ₹3,36,000 |
| 9.00 | d) 11 Nos of 2 TR Split AC unit (Inverter Type) | 24 | MONTH | 2,800 ₹67,200 | 2,500 ₹60,000 | 2,800 ₹67,200 | 4,950 ₹1,18,800 | 1,100 ₹26,400 Lowest | 4,125 ₹99,000 | 4,200 ₹1,00,800 | 16,500 ₹3,96,000 |
| 10.00 | e) 31 Nos of 1.5 TR Split AC unit (Inverter Type) | 24 | MONTH | 2,500 ₹60,000 | 7,500 ₹1,80,000 | 4,600 ₹1,10,400 | 12,400 ₹2,97,600 | 2,325 ₹55,800 Lowest | 6,666.67 ₹1,60,000.08 | 10,000 ₹2,40,000 | 46,500 ₹11,16,000 |
| 11.00Sub Head-III: Annual Comprehensive Maintenance of Following AHU units | |||||||||||
Tender Value
₹69.9 L
Closing Date
3 Jan 2022, 6:00 pmClosed
AGM(E-E)
AGM(E-E),ATS Complex, AAI, KIA, Bangalore-560300
Annual Operation and comprehensive Maintenance (2021-23) of AHUs, Split AC units at AAI Occupied area at KIA and DVOR-II Sidlaghatta at Bangalore Airport, Bangalore
2021_AAI_99312_1
AAI /KIA/ENGG-E/CMC/AC/2021-22
Open Tender
Electrical Works
Item Rate
730 days
AAI, KIA, Bangalore
As per NIT
4 documents required · 4 mandatory
₹1,120
Exempted
30 Oct 2025
23 Dec 2021
5 Jan 2022
23 Dec 2021
3 Jan 2022
23 Dec 2021
23 Dec 2021 - 31 Dec 2021
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .