| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC KOHRAUL P O YOGICHOURA DISTT SONEBHADRA U P 231222 | SONEBHADRA | SONEBHADRA | UTTAR PRADESH | 231222 | ₹2.9 L | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER |
| 2 | L2₹3.5 LRejected-Finance SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | ₹3.5 L | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L3₹3.7 LRejected-Finance SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | ₹3.7 L | L3 | Rejected-Finance NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | Kohli Engineering Company L2 | SHASHI ENGINEERING WORKS L1 | SUNSHINE ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1. Cleaning of the working area of the shovel. 2. Dismantling of the Hoist machinery of the Prakash shovel: - i-Removal of upper cover of complete hoist assy. ii- removal of PTO. iii- Removal of hoist Int. shaft. iv- Removal of bull gear. v- Removal of hoist drum and both side lower cover. 3. Assembling of old dismantled hoist machinery (Vikash shovel): - i- fitment of upper cover of complete hoist assy. ii Fitment of PTO. iii- Fitment of hoist Int. shaft. iv- Fitment of bull gear. v- Fitment of hoist drum and both sides lower cover. 4. Alignment of hoist machinery and final testing. Note: The maximum deployment of manpower for the above job will be 1. Skilled Fitter for 114 nos. manshifts, 2. 03 Skilled Welder for 38 nos. manshifts, 3. 03 Semi-skilled for 190 nos. manshifts & 03 Un-skilled for 16 nos. manshifts | ||||||
| 1.10 | Labour charges for cleaning of working area including contractor's profit. | 1 | Job | 10,000 ₹10,000 | 15,000 ₹15,000 | 40,000 ₹40,000 |
| 1.20 | Labour charges for Dismantling of Hoist machinery of Prakash shovel including contractor's profit. | 1 | Job | 1,10,000 ₹1.1 L | 98,460 ₹98,460 | 1,30,000 ₹1.3 L |
| 1.30 | Labour charges for Hoist machinery fitting ,alignment and final testing in Prakash shovel including contractor's profit. | 1 | Job | 1,40,000 ₹1.4 L | 98,460 ₹98,460 | 1,07,000 ₹1.1 L |
| 2.00Hiring Charges | ||||||
| 2.10 | Welding M/c, 01 no. per day | 19 | No. | 100 ₹1,900 | 120 ₹2,280 | 100 ₹1,900 |
| 2.20 | Grinder, 2 nos. per day | 38 | No. | 100 ₹3,800 | 100 ₹3,800 | 60 ₹2,280 |
| 2.30 | Gas Cutting set, 01 no. per day | 19 | No. | 100 ₹1,900 | 100 ₹1,900 | 40 ₹760 |
| 2.40 | Hyd Jack 200T, 2 nos. per day | 6 | days | 500 ₹3,000 | 500 ₹3,000 | 1,000 ₹6,000 |
| 3.00 | Charges for Special tools for alingment of hoist machinery | 1 | LS | 12,000 ₹12,000 | 10,000 ₹10,000 | 12,500 ₹12,500 |
Updated dates
Tender Value
₹3.7 L
EMD Value
₹4,700
Closing Date
24 Jan 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. -231222
Replacement of Hoist Machinery of BE-195B Prakash shovel of Khadia Project.
2026_NCL_350763_1
KHD/G.M. (Excv)/E-Tender/25-26/1098
Open Tender
Excavation Department Work
21 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,700
26 Mar 2026
7 Jan 2026
26 Jan 2026
7 Jan 2026
24 Jan 2026
8 Jan 2026
7 Jan 2026 - 15 Jan 2026
Scope of Work/Technical Specifications etc. 1. Cleaning of the working area of the shovel. 2. Dismantling of the Hoist machinery of the Prakash shovel: - i-Removal of upper cover of complete hoist assy. ii- removal of PTO. iii- Removal of hoist Int. shaft. iv- Removal of bull gear. v- Removal of hoist drum and both side lower cover. 3. Assembling of old dismantled hoist machinery (Vikash shovel): - i- fitment of upper cover of complete hoist assy. ii Fitment of PTO. iii- Fitment of hoist Int. shaft. iv- Fitment of bull gear. v- Fitment of hoist drum and both sides lower cover. 4. Alignment of hoist machinery and final testing. Note: The maximum deployment of manpower for the above job will be 1. Skilled Fitter for 114 nos. manshifts, 2. 03 Skilled Welder for 38 nos. manshifts, 3. 03 Semi-skilled for 190 nos. manshifts & 03 Un-skilled for 16 nos. manshifts
Labour charges for cleaning of working area including contractor's profit.
Labour charges for Dismantling of Hoist machinery of Prakash shovel including contractor's profit.
Labour charges for Hoist machinery fitting ,alignment and final testing in Prakash shovel including contractor's profit.
Hiring Charges
Welding M/c, 01 no. per day
Grinder, 2 nos. per day
Gas Cutting set, 01 no. per day
Hyd Jack 200T, 2 nos. per day
Charges for Special tools for alingment of hoist machinery
Charges for Misc. tools & tackles like spanners , hammers , crow bar, heavy duty socket , extension, torque wrench etc.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_363516.xls
BOQ • 0.27 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
Annexures.pdf
Tender Documents • 0.83 MB
ITB.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid