| 1 | L1₹3.8 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹4.7 L+₹90,529 (23.8%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹4.9 L+₹1.1 L (29.2%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹3.8 L
EMD Value
₹4,000
Closing Date
26 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
ATTENDING OF OIL LEAKAGE OF 40MVA T/F-I INSTALLED AT 132KV S/S MUSAFIRKHANA UNDER ETD, SULTANPUR
2023_UPTCL_868612_1
T.No. 45/ETCS/2023-24
Open Tender
Electrical Works
Item Rate
15 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹472
SE ETC Sultanpur
₹4,000
Yes
12 Jan 2024
7 Dec 2023
27 Dec 2023
7 Dec 2023
26 Dec 2023
7 Dec 2023
Amount
Following works to be carried out for attending oil leakage of 40MVA T/F-I, BHEL make (SL. No. 2000900 Mfg: 1996 ) installed at 132/33KV S/S, Musafirkhana-Amethi, with all cost of Men, Misc. Consumables, Crane/Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for satisfactory Completion of the job, as per Technical Specifications & Direction of Supervising Engineer, as per details below:
Removal of jumpers of HV & LV side Bushings of the Transformer. The scope of work involves opening of Bolts & Nuts and removal of Jumpers, Bushing Clamps etc
Draining out of complete transformer oil from the 40MVA T/F-I in empty oil tanker/Drum and stacking them at proper place.
Complete Dismantling of 40 MVA Transformer-I HV/LV/Neutral bushing from transformer main tank, radiators, conservator tank, explosion vent pipe, oil pipe lines, Buchholtz relay, oil pipe line, cooling fans, opening of electrical connection and stacking of all the Dismantled parts at proper place in the switchyard including proper blanking of open space for replacement of gaskets between conservator to main tank and OLTC etc.
Complete replacement of old and damaged gasket of 40MVA Transformer-I. The scope of work involves Removal of old/damaged Rim Gasket of Transformer's Top cover and old/damaged gaskets of different Parts of the Transformer by cleaning of surfaces, Providing and fabrication of Gaskets out of good Quality rubberized cork sheet Gaskets of new KONIKA/TROBORZE/Nu-Cork make having high temprature bearing capacity around 380 C and fixing the Gaskets with Adhesive at Rim & other surfaces of Transformer-I.
Cleaning of Transformer's Core & Winding by Hot Transformer Oil and removing the complete sludge from Bottom by Flushing with Centrifuging Machine.
Complete erection of 40MVA T/F-I by Erection of HV/LV/Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion vent pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original place. Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50C or better in Vaccuum upto Pressure of0.25Kg/cm2 and the again Evacuating the Transformer Tank after Required time interval(approx. 12Hrs) using Centrifuging Machine. The scope of work involves Measuring Due point values of N2 after every cycle till the required values achieved.
Centrifuging of T/F oil in 20KL oil tanker, Un-interrupted till the desired BDV value of the oil achieved and fill up of T/F oil into main tank and radiators from oil tanker, then centrifuging & circulation of the oil in Transformer, Un-interrupted till the desired BDV Values of the oil & IR values are achieved including recording of all the parameters such as Temprature, vaccuum, Insulation Resistance etc every 2Hrs. Centrifuging Machine, its operator, all associated T&Ps etc. shall be arranged by the Contractor at his own cost. 40MVA T/F-I
Overhauling of Diverter Switch after Draining of Oil from OLTC Chamber, Flushing with Hot T/F Oil in OLTC Chamber and finally, Filling the fresh centrifuged Transformer oil.
Jumpering of HV & LV side bushings of the Transformer. The scope of work involves Fixing & Tightening of Bushing Clamps with appropriate size Bolts-Nuts-Washers including Replacement of Clamps, Jumpers etc as required.
Outside complete Spray painting of above 40MVA T/F-I including its Main Tank, Main/OLTC Conservator Tanks, Radiators, Headers, associated Pipe Lines, Support Structures, Marshalling Box etc. with one coat of red oxide primer and then applying two coats of standard make Asian/Burger/Nerolac smoke gray synthetic enamel paint of Ist quality at the gap of 48Hrs. Interval each after proper cleaning of rust, dirt & oily surface with rinsing chemical, scratching with wire brush including cost of material,labours and T&Ps as per tech. specification.
Loading , unloading and shifting of 20KL empty oil tanker with the help of Hydra and Trailor from 400 KV S/S Sultanpur to 132 KV S/S Musafirkhana safely.
Loading , unloading and back shifting of 20KL empty oil tanker with the help of Hydra and Trailor from132 KV S/S Musafirkhana to 400 KV S/S Sultanpur safely.
Meena Elect & Engg. Works
Gupta Elect and Engg Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .