| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC | ₹49.8 L | L1 | Accepted-AOC BEING L1 BIDDER |
| 2 | L2₹59.9 LRejected-Finance KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | ₹59.9 L | L2 | Rejected-Finance BEING OTHER THAN L1 BIDDER |
| 3 | L3₹65.7 LRejected-Finance | ₹65.7 L | L3 | Rejected-Finance BEING OTHER THAN L1 BIDDER |
| 4 | L4₹81.0 LRejected-Finance | ₹81.0 L | L4 | Rejected-Finance BEING OTHER THAN L1 BIDDER |
| 5 | L5₹87.5 LRejected-Finance | ₹87.5 L | L5 | Rejected-Finance BEING OTHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | M/S Sky Engineers L4 | K S BUILDERS L6 | M/S Rather and Sons L3 | M/S GURU DEV BUILDERS L9 | M/S RATHER CONSTRUCTION CO L2 | VISHWA MITTAR PACHYALA L8 | MODI CONSTRCUTION COMPANY L7 | M/S LATIF AHMED MIR L1 | M/S HAJI ZAHOOR HUSSAIN GANIE L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing not exceeding 30 cm deep and averaging 15 cm getting out in soft/loose soil,including use of excavated soil prepare to required camber sides of runway / PTT and rolling by roller 8 to 12 ton ( 1850 sqm per 8 hours ) ,after that removing of extra soil to a distance of not exceeding 1.50 km complete all as specified and directed. | 76,500 | Sqm | 19 ₹14.5 L | 15 ₹11.5 L | 8 ₹6.1 L | 20 ₹15.3 L | 5 ₹3.8 L | 19 ₹14.5 L | 17 ₹13.0 L | 2 ₹1.5 L | 34 ₹26.0 L |
| 2.00 | Demolition of old PQC / concrete of any description and in any position not other wise specifically provided for and demolished material thrown out of premises complete all as specified and directed by Engineer-in-Charge. | 405 | Cum | 1,000 ₹4.0 L | 945 ₹3.8 L | 900 ₹3.6 L | 950 ₹3.8 L | 800 ₹3.2 L | 949 ₹3.8 L | 947 ₹3.8 L | 100 ₹40,500 | 500 ₹2.0 L |
| 3.00 | M&L 100 mm thick plain cement concrete 1:3:6 (Nominal mix), Type C-2 (using 40mm graded brick aggregate) as in sub base filling all as specified and directed. Note:- Unit rate quoted shall be deemed to be included all necessary formwork . | 1,350 | Sqm | 300 ₹4.0 L | 305 ₹4.1 L | 200 ₹2.7 L | 312 ₹4.2 L | 180 ₹2.4 L | 310 ₹4.2 L | 307 ₹4.1 L | 350 ₹4.7 L | 350 ₹4.7 L |
| 4.00 | M&L forHDPE Polythene film, 50 micron thick, laid on a coat of bitumen primer, @ 0.30 to 0.50 kg per sq. m all as specified and directed. | 350 | Sqm | 60 ₹21,000 | 50 ₹17,500 | 50 ₹17,500 | 57 ₹19,950 | 40 ₹14,000 | 55 ₹19,250 | 53 ₹18,550 | 30 ₹10,500 | 40 ₹14,000 |
| 5.00 | M&L sand cusionIng under polythene film complete all as specified and directed. | 17.5 | CUM | 500 ₹8,750 | 500 ₹8,750 | 500 ₹8,750 | 507 ₹8,872.50 | 400 ₹7,000 | 505 ₹8,837.50 | 503 ₹8,802.50 | 550 ₹9,625 | 650 ₹11,375 |
| 6.00 | M&L for Pavement quality concrete (PQC) of minimum 28 days field flexual strength of 45 kg/sqcm or 4.5 Mpa , aggregate gradation as per table 3 of IRC15-2017,coarse aggrgate of clean ,hardstrong ,dense, non porous and durable pieces of crrushed stone or gravel , fine aggregate of clean natural sand or crushed stone sand or combination of both using minimum 360 kg/cum of cement with non circular virgin synthetic fibre of 12 mm to 18 mm length, specific gravity 1.34 to 1.39, UV Stable alkali resistant , with equivalent dia of 15 to 40 micron minimum melting temperature as 240 degree celsius and minimum tensile strength of 300 Mpa and at the rate as specified by the manufacture . PQC laid and spread and compacted with slip form paver of minimum 7.5 m width including curing and tanning by texturing cum curing machine complete all as specified and directed. required surface texturing to be done as specified in clause 10.1.14 and table 9 of IRC 15-2017 including necessary steel formwork complete all as specified and as directed. | 70 | Cum | 9,000 ₹6.3 L | 900 ₹63,000 | 9,000 ₹6.3 L | 907 ₹63,490 | 8,500 ₹6.0 L | 905 ₹63,350 | 903 ₹63,210 | 9,500 ₹6.7 L | 7,500 ₹5.3 L |
| 7.00 | M&L forming 25mm width expansion joints in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joints shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris The Joint then filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, cross linked polythene form backup rod of 30mm dia over filler board and filled with polyurethane joint sealant complying with BS 5212, BS 4254 and EN 141875-2003 with minimum movement accommodation factor (MAF) of +/-30% having minimum 10-year performance guarantee, applying masked tape on the edge of joints and removing the masking tape after filling of sealant as per the method specified by manufacturers complete as specified and directed. | 11.4 | 10 RM | 5,300 ₹60,420 | 6,000 ₹68,400 | 4,000 ₹45,600 | 6,009 ₹68,502.60 | 5,000 ₹57,000 | 6,007 ₹68,479.80 | 6,005 ₹68,457 | 2,500 ₹28,500 | 3,000 ₹34,200 |
| 8.00 | M&L cutting of construction joints 25mm deep and 10 mm wide by early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joints shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, cross linked polythene form backup rod of 12mm dia, application of bond breaker tape on top of back up rod for complete width of joint and filled with polyurethane joint sealant complying with BS 5212, BS 4254 and EN 141875-2003 with minimum movement accommodation factor (MAF) of +/-30% having minimum 10-year performance guarantee, applying masked tape on the edge of joints and removing the masking tape after filling of sealant as per the method specified by manufacturers complete as specified and directed. | 11.4 | 10 RM | 4,500 ₹51,300 | 4,000 ₹45,600 | 4,000 ₹45,600 | 4,007 ₹45,679.80 | 3,500 ₹39,900 | 4,005 ₹45,657 | 4,003 ₹45,634.20 | 2,600 ₹29,640 | 3,000 ₹34,200 |
| 9.00 | M&L for Plain quality concrete work in pavement/ hard standing of flexural strength 40 kg/ per square centimetre in field using 400 kg of cement per cubic metre or as per design mix whichever is higher using non circular synthetic polyster triangular fibre @ 0.25% by weight of cement, thickness of concrete 20 cms or less, include demolition of existing concrete of any type complete all as specified.
Note:- (i) Unit rate quoted shall be inclussive of steel formwork required. | 200 | Cum | 9,000 ₹18 L | 9,000 ₹18 L | 8,000 ₹16 L | 9,007 ₹18.0 L | 8,000 ₹16 L | 9,005 ₹18.0 L | 9,003 ₹18.0 L | 9,000 ₹18 L | 6,800 ₹13.6 L |
| 10.00 | Forming 12mm thick expansion joints filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing compound, Grade ‘A’, thickness of slab 15 cms, complete all as specified and directed. | 28.6 | 10 RM | 1,200 ₹34,320 | 1,200 ₹34,320 | 800 ₹22,880 | 1,207 ₹34,520.20 | 1,000 ₹28,600 | 1,205 ₹34,463 | 1,203 ₹34,405.80 | 2,500 ₹71,500 | 1,000 ₹28,600 |
Tender Value
₹90 L
EMD Value
₹1.6 L
Closing Date
22 Dec 2025, 6:00 pmClosed
CWE AF SRINAGAR
SRINAGAR
REPAIR REPLACEMENT OF HARDSTANDING AT ARFF VEHICLE SAFETY BAY BITUMEN ROAD AT BP 12 AND 13 GRASS CUTTING SHOULDER LEVELING NEAR PTT AND PQC WORK AT LINK E AND C DISPERSAL UNDER AOR OF GE AF SRINAGAR
2025_MES_741244_1
CWE(AF)SGR/SGR-562025-26
Open Tender
Civil Works
180 days
GE(P) AF srinagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
₹1.6 L
Yes
20 Feb 2026
24 Nov 2025
27 Dec 2025
24 Nov 2025
22 Dec 2025
16 Dec 2025
Surface dressing not exceeding 30 cm deep and averaging 15 cm getting out in soft/loose soil,including use of excavated soil prepare to required camber sides of runway / PTT and rolling by roller 8 to 12 ton ( 1850 sqm per 8 hours ) ,after that removing of extra soil to a distance of not exceeding 1.50 km complete all as specified and directed.
Demolition of old PQC / concrete of any description and in any position not other wise specifically provided for and demolished material thrown out of premises complete all as specified and directed by Engineer-in-Charge.
M&L 100 mm thick plain cement concrete 1:3:6 (Nominal mix), Type C-2 (using 40mm graded brick aggregate) as in sub base filling all as specified and directed. Note:- Unit rate quoted shall be deemed to be included all necessary formwork .
M&L forHDPE Polythene film, 50 micron thick, laid on a coat of bitumen primer, @ 0.30 to 0.50 kg per sq. m all as specified and directed.
M&L sand cusionIng under polythene film complete all as specified and directed.
M&L forming 25mm width expansion joints in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joints shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris The Joint then filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, cross linked polythene form backup rod of 30mm dia over filler board and filled with polyurethane joint sealant complying with BS 5212, BS 4254 and EN 141875-2003 with minimum movement accommodation factor (MAF) of +/-30% having minimum 10-year performance guarantee, applying masked tape on the edge of joints and removing the masking tape after filling of sealant as per the method specified by manufacturers complete as specified and directed.
M&L cutting of construction joints 25mm deep and 10 mm wide by early entry saw and subsequent cutting by using diamond bit cutter of appropriate size, straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joints shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, cross linked polythene form backup rod of 12mm dia, application of bond breaker tape on top of back up rod for complete width of joint and filled with polyurethane joint sealant complying with BS 5212, BS 4254 and EN 141875-2003 with minimum movement accommodation factor (MAF) of +/-30% having minimum 10-year performance guarantee, applying masked tape on the edge of joints and removing the masking tape after filling of sealant as per the method specified by manufacturers complete as specified and directed.
M&L for Plain quality concrete work in pavement/ hard standing of flexural strength 40 kg/ per square centimetre in field using 400 kg of cement per cubic metre or as per design mix whichever is higher using non circular synthetic polyster triangular fibre @ 0.25% by weight of cement, thickness of concrete 20 cms or less, include demolition of existing concrete of any type complete all as specified. Note:- (i) Unit rate quoted shall be inclussive of steel formwork required.
Forming 12mm thick expansion joints filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing compound, Grade ‘A’, thickness of slab 15 cms, complete all as specified and directed.
Forming contraction (Dummy) joint 65mm deep x 10mm wide as the work proceeds in alternative ways and filled with sealing compound grade 'A' after priming with primer for grade 'A' sealing compound , complete all as specified and directed.
Preparing existing black top surface by brushing with wire brushes for removing cake mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc, complete all as specified and directed.
M&L for applying evenly a priming/tack coat with VG-10 @ 10Kgs/X sqm, complete all as specified and as directed.
M&L for bituminous premixed semi dense asphaltic concrete 40 mm consolidated thickness with 5.5% binder content using paving bitumen VG-30 by weight by total mix to be laid with self propelling mechanical paver, rolled and compacted to required camber and gradient with initial rolling using 8 to 12 tonne power roller followed by an intermediate smooth wheel pneumatic roller of 15 to 30 tonne having type pressure of 7 kg/sqm and the surface finished by final rolling with 8 to 10 tonne tandem roller, complete all as specified and directed.
M&L for repair to patches of flexural portion of runway,depth n.exc 80 mm,including sweeping free from dust and mud or water withwire or jute brush scooring sunken surface in runway pavement, cutting arround edge to atlest full depth of carpet layer making proper rectangular or squre shape patch and making good by applying tack coat with bitumenous primer (catonic emulsion RS) and filling the pacth with ready made bitumeonus mix of using cutback bitumen rooled and compacted to required camber and gradient with hand roller complete and clean the surface by brooming and making FOD free surface to runway complete all as specified and directed.
M&L for applying evenly a priming/tack coat with VG-10 @ 5Kgs/X sqm, complete all as specified and as directed.
M&L for preparation of old painted surface of concrete / bituminous pavement by brushing and applying one coat painting with water based road marking paint (any Colour) in pattern of lines / arrows / letters etc. on road or pavements exc 10cm width or girth, complete all as specified and directed . Make: APCOTRAK manufactured by Asian Paints or equivalent of make Jenson & Nicholson paints Pvt Ltd / Nerolac.
Deployment of T&P and labour for cutting and removing the grasses / vegetation growth / saplings etc. from the surrounding area of runway, taxi track and dispersals by using tractor equipped with jungle Jim and disposing off all the rubbish out of runway boundary complete all as specified and directed by . Note : Minimum 2 Jungle Jim with tractor to be deployed by the Contractor on daily basis as on daily basic per user requirement. if contracto unable to deploy 2 jungle jim with tractor per day 2500 /- recovery will be carried out by contractor.
Deployment of T&P and labour for grass cutting by manually or mechanically (Bush Cutter) on the both side of runway / PTT as per requirement basis and timing as feasible by the users, complete including taking out all necessary grass shurbs saplings wild bushes and any type of vegetation and removing out of runway boundary complete all as specified and as directed by Engineer-in-Charge. Note : Minimum 4 Bush cutter to be deployed by the Contractor on daily basis as per user requirement. if contracto unable to deploy 4 bush cutter with operator per day 3500 /- recovery will be carried out by contractor.
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TENDER56.pdf
Tender Documents • 0.83 MB
BOQ_830003.xls
BOQ • 1.17 MB
Download all tender documents and submit your bid