| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAdmitted-Finance 98 PANIYARE PURWA MAKRAND NAGAR SARAIMEERA KANNAUJ KANNAUJ UTTAR PRADESH 209726 | KANNAUJ | UTTAR PRADESH | 209726 | L1 | Admitted-Finance | |
| 2 | L2₹26.4 L+₹82,351 (3.22%)Admitted-Finance AASHIYANA SECTOR N 304 KILA CHAURAHA KANPUR ROAD AASHIYANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical GURU RAM DAS NAGAR SRI SAI VIHAR COLONY ALIGARH ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SMV POWER SOLUTION L2 | rbs engineering L1 |
|---|---|---|---|---|---|
| 1.00 | Safe carriage of oil storage tank of 20kL including loading, unloading & carriage upto the site of approx.. 75Km. from132 KV Sub-station, Shahabad to 132 KV Sub-station Baghauli | 1 | Job | 25,000 ₹25,000 | 24,300 ₹24,300 Lowest |
| 2.00 | Complete safe dismantling of the accessories of 132/33 kV 20 MVA Transformer including opening of jumpers, removal of earthing, removal of bushings, conservator tank, pipe lines, cooling fans, marshalling box, radiator with oil drain from radiator, opening of control cable sand fixing of blanking plates on the radiators, pipelines, conservator tanks, turret etc. with proper stacking. All men, material, T&P including Nuts & Bolts shall be provided by contractor. | 1 | Job | 30,000 ₹30,000 | 29,800 ₹29,800 Lowest |
| 3.00 | Dismantling of RTCC panel of 20 MVA T/F including disconnection of cables, cutting of earthing and shifting of panel to store. | 1 | Job | 5,000 ₹5,000 | 4,350 ₹4,350 Lowest |
| 4.00Dismantling of following equipment’s with due opening of jumpers, earthing, cable connections, nut bolts and proper shifting to store:- | |||||
| 4.01 | 145kV CT (400-200/1Amp) 0.2 accuracy class | 3 | Nos. | 1,000 ₹3,000 Lowest | 1,000 ₹3,000 Lowest |
| 4.02 | 120kV LA with structure | 3 | Nos. | 1,000 ₹3,000 Lowest | 1,000 ₹3,000 Lowest |
| 4.03 | 36kv CT, 400/1Amp, 3 core | 3 | Nos. | 1,000 ₹3,000 | 850 ₹2,550 Lowest |
| 5.00 | Old C&R panel of 20 MVA T/F & 40 MVA T/F including opening of all cable connection, cutting of earthng and shifting from control, room to store. | 2 | Nos. | 10,000 ₹20,000 | 9,999 ₹19,998 Lowest |
| 6.00 | Shifting of oil filled main tank of dismantled 132/33kV 20 MVA T/F from plinth upto 20 metre distance including turning of tank if required with all T&P, manpower to be provided by contractor to complete the job in all respect. | 1 | Job | 23,000 ₹23,000 | 22,800 ₹22,800 Lowest |
| 7.00 | Additional shifting of dismantled 132/33kV 20 MVA T/F main tank upto 100 meter distance (01 Job for every 5 meter). | 20 | Job | 5,200 ₹1,04,000 Lowest | 5,200 ₹1,04,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
3 Jul 2026, 6:00 pmClosed
SE ETC Shahjahanpur
Electy. Trans. Circle, Shahjahanpur
Work
2026_UPTCL_1156219_2
03 ETC(S)/2026-27
Open Tender
Electrical Works
Fixed-rate
60 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹31,000
26 Sept 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
3 Jul 2026
20 Jun 2026
20 Jun 2026 - 26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Safe carriage of oil storage tank of 20kL including loading, unloading & carriage upto the site of approx.. 75Km. from132 KV Sub-station, Shahabad to 132 KV Sub-station Baghauli | 1 | Job | - | - |
| 2 | Complete safe dismantling of the accessories of 132/33 kV 20 MVA Transformer including opening of jumpers, removal of earthing, removal of bushings, conservator tank, pipe lines, cooling fans, marshalling box, radiator with oil drain from radiator, opening of control cable sand fixing of blanking plates on the radiators, pipelines, conservator tanks, turret etc. with proper stacking. All men, material, T&P including Nuts & Bolts shall be provided by contractor. | 1 | Job | - | - |
| 3 | Dismantling of RTCC panel of 20 MVA T/F including disconnection of cables, cutting of earthing and shifting of panel to store. | 1 | Job | - | - |
| 4Dismantling of following equipment’s with due opening of jumpers, earthing, cable connections, nut bolts and proper shifting to store:- | |||||
| 4.01 | 145kV CT (400-200/1Amp) 0.2 accuracy class | 3 | Nos. | - | - |
| 4.02 | 120kV LA with structure | 3 | Nos. | - | - |
| 4.03 | 36kv CT, 400/1Amp, 3 core | 3 | Nos. | - | - |
| 5 | Old C&R panel of 20 MVA T/F & 40 MVA T/F including opening of all cable connection, cutting of earthng and shifting from control, room to store. | 2 | Nos. | - | - |
| 6 | Shifting of oil filled main tank of dismantled 132/33kV 20 MVA T/F from plinth upto 20 metre distance including turning of tank if required with all T&P, manpower to be provided by contractor to complete the job in all respect. | 1 | Job | - | - |
| 7 | Additional shifting of dismantled 132/33kV 20 MVA T/F main tank upto 100 meter distance (01 Job for every 5 meter). | 20 | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2178767.xls
BOQ • 0.31 MB
03.pdf
PDF • 0.27 MB
report.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .