| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance GRAM BHARIDINADARPUR POST NANAUTA DISTRICT SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-Finance Found 1st Lowest | |
| 2 | L2₹8.4 L+₹1.2 L (17.4%)Accepted-Finance | L2 | Accepted-Finance Found 2nd Higher | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s. V.K. CONTRACTOR L2 | SINGH ASSOCIATES L1 |
|---|---|---|---|---|---|
| 0.00The work of erection of 11 KV HT/LT Lines & 63/100 KVA Sub-Stations for electrification of various sites of Payjal Punargathan Yojana under FULL DEPOSIT SCHEME 2025-26 under EDD, Atarra, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | |||||
| 1.00 | Safe cartage of 11 Mtr. long ST poles from store centre to the respective site of work. | 64 | No | 1,770 ₹1,13,280 | 1,416 ₹90,624 Lowest |
| 2.00 | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. | 50 | Qtl | 2,950 ₹1,47,500 | 472 ₹23,600 Lowest |
| 3.00 | Erection & grouting of SP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 44 | No | 708 ₹31,152 Lowest | 2,124 ₹93,456 |
| 4.00 | Erection & grouting of DP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 10 | No | 1,180 ₹11,800 Lowest | 5,310 ₹53,100 |
| 5.00 | Erection and grouting of stay set with nozelling & binding as per norms. All grouting material arranged by contractor at his own cost. | 40 | No | 354 ₹14,160 Lowest | 590 ₹23,600 |
| 6.00 | Erection & fixing of earthing rod as per RESSPO manual. | 64 | No | 118 ₹7,552 Lowest | 118 ₹7,552 Lowest |
| 7.00 | Laying of 11 KV XLPE Cable 3x70 Sq.mm. in cable trench, where trench is to be prepared by contractor, if required. Making of trench with sand, concrete & bricks etc. (All trench material arranged by contractor at his own cost. Only XLPE Cable provided by department). | 400 | Mtr | 141.6 ₹56,640 Lowest | 271.4 ₹1,08,560 |
| 8.00 | Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasel/Dog Conductor on the newly erected pole with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. | 4.78 | Km | 8,260 ₹39,507.58 | 5,900 ₹28,219.7 Lowest |
| 9.00 | Laying, stringing, binding and termination etc. of LT PVC Armourd Cable 4x16 Sq.mm. for connection from T/F LT bushing to LT DB with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. | 140 | Mtr | 82.6 ₹11,564 | 64.9 ₹9,086 Lowest |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
16 Mar 2026, 1:00 pmClosed
SE, EDC, BANDA
Chilla Road, Indira Nagar, Banda
Electrification of new sites of payjal punargathan yojana under EDD, Atarra
2026_DVVNL_1122454_1
EDCBNDA-45/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Banda
As per annexured
2 documents required · 2 mandatory
₹1,180
DVVNL
₹9,500
SE, EDC, BANDA
21 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The work of erection of 11 KV HT/LT Lines & 63/100 KVA Sub-Stations for electrification of various sites of Payjal Punargathan Yojana under FULL DEPOSIT SCHEME 2025-26 under EDD, Atarra, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | - | - | - | - |
| 1 | Safe cartage of 11 Mtr. long ST poles from store centre to the respective site of work. | 64 | No | - | - |
| 2 | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. | 50 | Qtl | - | - |
| 3 | Erection & grouting of SP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 44 | No | - | - |
| 4 | Erection & grouting of DP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 10 | No | - | - |
| 5 | Erection and grouting of stay set with nozelling & binding as per norms. All grouting material arranged by contractor at his own cost. | 40 | No | - | - |
| 6 | Erection & fixing of earthing rod as per RESSPO manual. | 64 | No | - | - |
| 7 | Laying of 11 KV XLPE Cable 3x70 Sq.mm. in cable trench, where trench is to be prepared by contractor, if required. Making of trench with sand, concrete & bricks etc. (All trench material arranged by contractor at his own cost. Only XLPE Cable provided by department). | 400 | Mtr | - | - |
| 8 | Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasel/Dog Conductor on the newly erected pole with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. | - | Km | - | - |
| 9 | Laying, stringing, binding and termination etc. of LT PVC Armourd Cable 4x16 Sq.mm. for connection from T/F LT bushing to LT DB with complete fitting/fixing of all associated materials as per direction of supervising engineer/RESSPO manual. | 140 | Mtr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tender_Document_SED2526_045.rar
Tender Documents • 2.17 MB
BOQ_2090315.xls
BOQ • 0.42 MB
DateextensioncorrigendumNew45.pdf
PDF • 0.13 MB
CorrigendumOM-45.pdf
PDF • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .