Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | -38.40% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹6.3 L (2.06%)Admitted-Finance | -37.13% | ₹3.1 Cr+₹6.3 L (2.06%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 Cr+₹41.5 L (13.6%)Admitted-Finance | -30.00% | ₹3.5 Cr+₹41.5 L (13.6%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 Cr+₹72.6 L (23.9%)Admitted-Finance | -23.70% | ₹3.8 Cr+₹72.6 L (23.9%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical rejected |
Tender Value
₹4.9 Cr
EMD Value
₹11.6 L
Closing Date
2 Apr 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
office of the Executive Engineer InFC division Leh
Flood Protection and channelization of Alchi Nallah(Under SDP)
2026_PWD_18598_1
109 of I and FC Division Leh 2025-26
Open Tender
Civil Works - Canal
Percentage
720 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹5,817
Payable To Executive Engineer InFC division Leh
₹11.6 L
6 May 2026
11 Mar 2026
4 Apr 2026
12 Mar 2026
2 Apr 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge. a)All kinds of soil:-70% | 3,685.85 | Cum | 1 | ₹3,685.48 |
| 2 | b)Ordinary rock:-30% | 1,579.65 | Cum | 1 | ₹1,579.49 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 4,520 | Cum | 1 | ₹4,519.55 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form
work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 10,200 | Sqm | - | - |
| 5 | Dumping stone including cost of stones. in Horizontal on level | 414 | Cum | - | - |
| 6 | Channelization of Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Wet | 28,000 | Cum | 1 | ₹27,997.2 |
| 7 | Pumping out water caused by springs, tidal or river seepage, broken water mains
or drains and the like. | 5,000 | KL | 1 | ₹4,999.5 |
| 8 | Carriage of material from source to site of work by mechanical transport. a)Cement an avg lead 65 Km | 994.4 | MT | 1 | ₹994.3 |
| 9 | b)Sand an avg lead 10 Km | 2,124.4 | Cum | 1 | ₹2,124.19 |
| 10 | c)Stone agg an avg lead 40 Km | 4,022.8 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 2.25 MB
BOQ_44604.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .