Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1 Rank₹4.8 LAccepted-AOC | 1 Rank | Accepted-AOC L1 | |
| 2 | 2 Rank₹4.9 L+₹2,785 (0.57%)Rejected-AOC | 2 Rank | Rejected-AOC L2 | |
| 3 | 3 Rank₹4.9 L+₹4,700 (0.97%)Rejected-AOC | 3 Rank | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
17 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
Replacement of gasket including other associated work for 132 KV 40 MVA Transformer installed at 132 KV Substation Kaurihar under Electy. Trans. Division-I, Prayagraj
2021_UPTCL_563595_1
95-ETC-I(A)/ 2020-2021
Open Tender
Electrical Works
Item Rate
30 days
Kaudihar, Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE,ETC,PRAYAGRAJ
₹5,000
24 Jun 2021
5 Mar 2021
18 Mar 2021
5 Mar 2021
17 Mar 2021
5 Mar 2021
120 days
Amount
Following works to be carried out for replacement of gaskets including other associated work for 132/33 KV, 40 MVA T/F (Technical Associate Make) installed at 132 KV S/S Kaurihar under ETD-I, Prayagraj with all cost of man, materials, T&P as per technical specification for proper completion of the work with due safety and precautions as per direction of supervising engineer.
Opening of jumpers of HV/LV side bushing and remmoval of earthing strip from neutral bushing.
Dismantling of 40 MVA Transformer accessories including radiator, bushing, buchhoiz relay, oil pipe line from conservator tank to main tank, oil pipe line to OLTC and surge relay conservator tank.
Complete drain out of old transformer oil from the existing 40 MVA transformer into empty oil drums/oil tanker and storage of oil drums at stores/designated place for storage.
Loading of 20 KL oil storage tank from 220 KV S/S Phulpur Prayagraj then safe carriage oil tank from phulpur to 132 KV S/S Kaurihar and unloading the same to the places instructed by supervising engineer (distance approx 40 KM) vehicle/trailer and man power provided by contractor at his own cost.
Replacement of all the gaskets including the top cover gaskets of transformer by providing and fixing of new gaskets as per existing size made of Rubberized Cork sheet Kotika/Turboze/Nucork brand garde 07 after due fabrication.
Cleaning of core and winding by transformer oil and removal of sludge from bottom of main tank.
Applying vacuum to above transformer upto 760 mm of Hg for 24 Hrs. with adequate capacity vacuum pumps after necessary blanking/erection as per requirement.
Filling of dry Nitrogen gas having DEW point(-) 60o C to (-) 65oC under vacuum from top value of the transformer upto pressure of 3PSI and maintaining the same in the main tank for 12 Hrs. including cost of Nitrogen gas and nitrogen gas filling device.
Creating the vacuum inside the main tank for period for 12 Hrs and filling of centrifuged new transformer oil in main tank of required BDV after preparation in 20 KL oil tanker.
Complete erection of 40 MVA transformer including radiator, conservatior tank, bushing with its turrets alongwith connecting of all oil pipe line, Erection of cooling fans, making control cable connection, Bucholz relay etc., topping up of transformer oil and final oil filling in the tank, radiator, conservator tank and all other accessories.
Centrifuging of following transformer oil in transformer tank or oil tanker by coinnecting centrifuging pipes, circulating the transformer oil through centrifuging machine and taking BDV values of the oil periodically till the required value achieved as per direction of supervising engineer and also measurement of PPM. All labour, T&P, Centrifuging machine shall be provided by contractor at his own cost.
Overhauling of diverter switch after removing of oil and dirty transformer oil from its chamber, filling the fresh centrifuged transformer oil after necessary centrifusing for proper BDV value as per norms of the transformer.
Conducting BDV, PPM, DGA, TAN DELTA tests of T/F oil of 40 MVA T/F-I after passing of 15 days from date of charging. Job includes sample collection of T/F oil in suitable container and its transportation to NABL certified LAB and submitting its test reports.
Omurmila Constructions
Preeti Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .