Executive Engineer
400 KV Substation Motiram Adda complex Gorakhpur
Miscellaneous maintenance works on Tubular poles of 33 KV Line to maintain the Substation supply
2020_UPTCL_427625_1
T-17/400 KV/SSD/GKP/2019-20
Open Tender
Electrical Works
Item Rate
60 days
Motiram Adda Gorakhpur
As per given in NIT Documents
2 documents required · 2 mandatory
₹295
As per given in NIT Documents
₹1,000
23 May 2020
25 Jan 2020
28 Feb 2020
25 Jan 2020
28 Feb 2020
25 Jan 2020
Amount
Following maintenance works on Tubular poles of 33 KV Line to maintain the Substation supply, details of work given below.
Shifting of 13 Mtrs, 04 Nos Tubular poles (including loading & unloading) from 400 KV S/S Gorakhpur store to site near viilage Devipur & Banzari Tola and by tractor. Men, T&P, crane etc shall be provided by the contractor for completion of work.
Excavation of earth of size 2250x900x600 mm for foundation of pole in alignment of line and placing of stone pad in the bottom of pit including carriage of stone pad from store to the site of work.
Fixing of Tubular pole in line alignment and made foundation of size 450x450 mm with 1:4:8 mix concrete of cement,concrette and sand for foundation 9including cost of cement, concrette and sand) with the help of wooden / Steel formers. Plinth shall be 300 mm above the ground level including curing , removal of framers, back filling of pit and earthing of poles with eathing wire.
Fixing of V type cross arm MS channel of guarding wire, E Clamp 33 KV Pin type insulator with pin and packing pieces on grouted Tubular pole with MS clamps of suitable sizes at suitable distance so that proper clearance may be maintained as per direction of supervising engineer.
Stringing and re- sagging of conductor for all 3 phases on newly installed tublar pole with disc insulator and also for dismantled conductor spans as stated above with the help of binding wires etc as per direction of supervising engineer.
Dismantalling of existing damaged 9 mtrs rail/ cement ST pole along with top channel cross arm, stay arrangement etc by way of digging of earth and back filling of pit from site located near Village Devipur & Banzati Tola.
Shifting of 9 Mtrs, Rail / cement poles (including loading & unloading) from site near viilage Devipur & Banzari Tola to 400 KV S/S Gorakhpur store and by tractor. Men, T&P, crane etc shall be provided by the contractor for completion of work.
Pole to pole ground patrolling of 9 Kms 33 KV Satrudhanpur - Gorakhpur (400 KV) line alongwith ground work such as lopping/chopping of trees in 8 meter corridor, is to be carried out.
Sri Balaji Associates
Vasu Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .