| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC | ₹49.8 L Quoted ₹50.3 L | L1 | Accepted-AOC The Rates Quoted are acceptable |
| 2 | L2₹51.0 L+₹70,993 (1.41%)Rejected-Finance | ₹51.0 L+₹70,993 (1.41%) | L2 | Rejected-Finance The rates quoted are high |
| 3 | L3₹51.2 L+₹90,497 (1.80%)Rejected-Finance | ₹51.2 L+₹90,497 (1.80%) | L3 | Rejected-Finance The rates quoted are high |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
26 Dec 2024, 11:00 amClosed
Executive Engineer
TamilNadu Warehousing Corporation, Guindy, Chennai-32
Construction of Compound wall on the southern boundary and a eastern portion of the Godown campus in Thelur village at Ariyalur Warehouse
2024_TNWC_512070_1
Rc.No.4657-2/2024/C2
Open Tender
Construction Works
Item Rate
Ariyalur
As per Tender Document
7 documents required · 7 mandatory
₹0
₹48,000
22 Jan 2025
19 Dec 2024
27 Dec 2024
19 Dec 2024
26 Dec 2024
19 Dec 2024
19 Dec 2024 - 26 Dec 2024
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, and conveying for levelling the site with a lead of 0 to 100m deploying earth moving machinery and tippers including breaking clods, sectioning, levelling etc,. Complete as directed by the departmental officers.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation and basement with Red Gravel in layers of not more than 15cm thick well rammed watered and consolidated complete with standard specification.
Plain Cement Concrete 1:5:10 (One Cement, Five of M sand and Ten HBG Stone) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and consolidated with standard specification..
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half M sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including mixing of concrete with mixer machine, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers.
For Foundation and Basement
For Super Structure in Ground Floor
Providing undereamed piles of 0.23m dia @ 2.4m c/c forming bulbs at suitable intervals by using Mechanical equipments etc, complete complying with standard specification and as directed by the departmental officers during execution of work.
Brick work with Cement Mortar 1:5 (One of cement and five of M-sand) using best quality II class Ground molded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" including curing, etc., complete complying with standard specification. For Super structure in GF
For Super Structure in Ground Floor
Supplying, fabricating and placing in position ribbed tar Steel for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting centering for sides soffits and strutting For plain surface such as reinforced cement concrete slap "T" or "L" beam lintel bed block staircase waist slap , landing slap canopy etc . complete in all floors of any height.(The retrieved materials should be taken back by the contractor) the payment for centering shall be given after the concrete is laid (bottom only)For RCC Columns and sunshades etc.,
For Grade beam, Plinth beam and Column footing, etc,.
For RCC Columns.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Sub total
GST in 18%
VSPN CONSTRUCTIONS (BID ID -1218496)
M.C.Prabhu (BID ID -1219066)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_608882.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .