Loading…
Loading…
Tender Value
₹29.5 L
EMD Value
₹2.9 L
Closing Date
13 Oct 2026, 3:00 pm
G.M (Jal), Nagar Nigam Saharanpur
G.M (Jal), Nagar Nigam Saharanpur
Repairing work on the Pump houses of tubwells at Nagar Nigam Area (25 Nos.)
2026_NNSAH_1189318_1
WW/838/BF/2026-27
Open Tender
Civil Works - Water Works
Percentage
60 days
Nagar Nigam Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.9 L
23 Sept 2026
23 Sept 2026
13 Oct 2026
23 Sept 2026
13 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI NO. 692 | 2.66 | CUM | 400 | ₹1,064 |
| 2 | deducticn of brick bats (O.B), SOR NO-01F | 1.73 | CUM | 800 | ₹1,384 |
| 3 | Deduction of Old Brick | 427.7 | CUM | 5.8 | ₹2,480.66 |
| 4 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).SOR NO-697 | 15.48 | sqm | 38 | ₹588.24 |
| 5 | Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).SI NO. 706 | 3,225.75 | SQM | 30 | ₹96,772.5 |
| 6 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI NO. 273 | 54.68 | CUM | 2,985 | ₹1,63,219.8 |
| 7 | M-150 class Brick IN n 1:6 (One cement & six fine sand of 1.25 F.M.) mortar. SI NO. 303 | 41.37 | CUM | 4,520 | ₹1,86,992.4 |
| 8 | 12MM Thickb 1:4 cement finesand & mortar SI NO.584 | 3,446 | SQM | 160 | ₹5,51,360 |
| 9 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work SI NO. 279A | 89.21 | cum | 5,750 | ₹5,12,957.5 |
| 10 | PROVING OF WATER PROOFING IN ALL COMPLETE WORK 4.20mX3.60m DSR ITEM 615.00rs per Sqm | 477 | sqm | 447.8 | ₹2,13,600.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.97 MB
BOQ_2240755.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .