Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.2 LAccepted-AOC | L1 | Accepted-AOC Accepted as Techno Commercially evaluated L1 Bidder | |
| 2 | L2₹79.4 L+₹5.2 L (7.04%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | L2 | Rejected-Finance REJECTED AS L2 BIDDER | |
| 3 | L3₹99.4 L+₹25.2 L (34.0%)Rejected-Finance | L3 | Rejected-Finance REJECTED AS L3 BIDDER | |
| 4 | Rejected-Technical ANUPPUR M P | - | Rejected-Technical rejected in Shortfall of Confirmatory Documents | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected in Shortfall of My Documents(Non-Recycling documents) |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L2 | BINOD KUMAR SAHU L1 | M/s Anjali Construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | Carting of coal/shale/shaly coal in UG mine by manual labour including loading, unloading & stacking for lead upto 50 mt. | 78.18 | Cum | 737.02 ₹57,619.94 | 688.55 ₹53,830.84 Lowest | 922.48 ₹72,119.81 |
| 2.00 | Excavation in Coal/shale in U/G mine by chiseling in trenches and drains for making notches in gallery including of serviceable material with a lead upto 30mtr & lift upto 1.5mtr including neat dressing of the roof floor and sides as per the instrction of the E.I.C . | 170.33 | Cum | 7,370.05 ₹12,55,340 | 6,885.42 ₹11,72,793.59 Lowest | 9,224.7 ₹15,71,242.42 |
| 3.00 | (a)Brick work (1:6) foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the u/g mine Site.(i) in Foundation | 31.6 | Cum | 7,149.9 ₹2,25,936.84 | 6,679.74 ₹2,11,079.78 Lowest | 8,949.15 ₹2,82,793.14 |
| 3.10 | (b) In Superstructure. | 171.14 | Cum | 8,158.9 ₹13,96,314.42 | 7,622.4 ₹13,04,497.54 Lowest | 10,212.06 ₹17,47,692.62 |
| 3.20 | (ii) Transportation of materials for brick work to the working site. | 202.74 | Cum | 9,785.58 ₹19,83,928.29 | 9,142.11 ₹18,53,471.38 Lowest | 12,248.09 ₹24,83,177.71 |
| 4.00 | (a)Half Brick work 1:4 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.
(i) in foundation | 29.6 | Sqm | 869.03 ₹25,723.31 | 811.89 ₹24,031.94 Lowest | 1,087.72 ₹32,196.5 |
| 4.10 | (b) In Superstructure. | 219.04 | Sqm | 983.39 ₹2,15,401.08 | 918.72 ₹2,01,236.43 Lowest | 1,230.85 ₹2,69,606.1 |
| 4.20 | (ii) Transportation of materials for brick work to the working site. | 248.64 | Sqm | 1,115.94 ₹2,77,466.25 | 1,042.56 ₹2,59,222.12 Lowest | 1,396.76 ₹3,47,289.77 |
| 5.00 | (a)Reainforced cement concrete in walls (any thickness) including attached plasters buttereses, plinth and string courses fillets, column pillars , piers abutments posts and struts etc upto floor two level excluding cost of ecntering , shuttering reinforecement and carriage of material from incline mouth to U/G mine site 1:1.5:3,1-cement,1:5 coarse sand , aggregate:3 (a)Foundation & (b) In Superstructure | 37.3 | Cum | 8,393.58 ₹3,13,080.67 | 7,841.65 ₹2,92,493.54 Lowest | 10,505.8 ₹3,91,866.45 |
| 5.10 | (c) Transporation material of R.C.C Work to the working site. | 37.3 | Cum | 14,598.32 ₹5,44,517.27 | 13,638.39 ₹5,08,711.95 Lowest | 18,271.94 ₹6,81,543.36 |
Tender Value
₹95.1 L
EMD Value
₹1.2 L
Closing Date
15 May 2025, 5:00 pmClosed
Staff Officer(Mining), Orient Area, MCL
Office of the General Manager, Orient Area
Construction of Total 09 nos. of Full Sectionalization/isolation Stoppings and 05 nos. of peparatory isolation stopping
2025_MCL_334722_1
MCL/GM/OA/SO(M)/25/NIT255/897
Open Tender
Civil Works - Others
Item Rate
540 days
Orient Colliery 1and2 Mine, OSA, OA, MCL
Please refer tender Documents
5 documents required · 5 mandatory
₹1.2 L
8 Sept 2025
28 Apr 2025
16 May 2025
29 Apr 2025
15 May 2025
29 Apr 2025
29 Apr 2025 - 8 May 2025
Amount
Carting of coal/shale/shaly coal in UG mine by manual labour including loading, unloading & stacking for lead upto 50 mt.
Excavation in Coal/shale in U/G mine by chiseling in trenches and drains for making notches in gallery including of serviceable material with a lead upto 30mtr & lift upto 1.5mtr including neat dressing of the roof floor and sides as per the instrction of the E.I.C .
(a)Brick work (1:6) foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the u/g mine Site.(i) in Foundation
(b) In Superstructure.
(ii) Transportation of materials for brick work to the working site.
(a)Half Brick work 1:4 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site. (i) in foundation
(b) In Superstructure.
(ii) Transportation of materials for brick work to the working site.
(a)Reainforced cement concrete in walls (any thickness) including attached plasters buttereses, plinth and string courses fillets, column pillars , piers abutments posts and struts etc upto floor two level excluding cost of ecntering , shuttering reinforecement and carriage of material from incline mouth to U/G mine site 1:1.5:3,1-cement,1:5 coarse sand , aggregate:3 (a)Foundation & (b) In Superstructure
(c) Transporation material of R.C.C Work to the working site.
(a)Reainforcement for RCC work 12mm tor steel rod @ Kg/cum including binding etc. excluding carriage of material from incline mouth to U/G mine site
b) Transportation of materials for Reainforcement of RCC work by 12 mm steel Rod.
(a) 12mm thick cement plaster 1:6 (1 cement, 6 coarse & 3 Sand) excluding carriage of material from incline mouth to U/G mine site.
(b) Transportation of materials for plastering work to the working site.
(a)Neat cement punning work on isolation stopping for smooth finishing and stopping leakage excl. carriage of material from incline mouth to U/G mine site.
(b) Transportation of materials for punning work to the working site.
Total impact of GST for the purpose of CTC
SANTOSH KUMAR SINGH (BID ID -1153018)
M/s Anjali Construction (BID ID -1151505)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .