Loading…
Loading…
Tender Value
₹24.2 Cr
EMD Value
₹24.2 L
Closing Date
20 Aug 2026, 5:00 pm
Chief Engineer Buildings and Bridges
O/o of the EIC Rural Works Odisha Bhubaneswar
Construction of bridge over river Birupa at Banaghata connecting R and B Road Chayanpal and Gunupur village
2026_CERWI_137528_1
01/2026-27 (Bridges)
National Competitive Bid
Civil Works - Bridges
Percentage
720 days
Cuttack
2 documents required · 2 mandatory
₹10,000
₹24.2 L
Yes
30 Jul 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
30 Jul 2026 - 19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of in all kinds of soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer-in-charge. | 256.26 | cum | 259.6 | ₹66,524.06 |
| 2 | Labour of sinking single circular well caission/ cribwell of specified external diameter in all kinds of soil to lines levels & plumb by scooping out from inside the well & below the steining including cost of dredging & plants ,supply & work of pumps, dredgers & compressors, derrick, winches, cranes etc. balling out of water & dredging, removing all materials & obstacles from inside the wells inclusive of hire & running charges of all such machinery including materials & labour charges for providing kentledge loading if necessary & sinking to the required depth by loading with proper designed & preapproved weight & taking precautions adequately against tilting & shifting & dispiosal of the dredged materials away from the wells as per the direction of Engineer-in charge with all leads & lifts in all repects including all incidental charges like temporary sand filling, top pluging of well etc. for safety of the structure during execution as directed by the Enginer-in charge. (Payment will only be made for sinking of the well & other items required for the well sinking operation is only incidental & no payment will be made for such items) A) In all kinds of Soil (upto 10m depth) i) For 7.5m dia abutment wells | 40 | rm | 28,422.79 | ₹11,36,911.6 |
| 3 | ii) For 7.0m dia. pier wells | 20 | rm | 25,920.61 | ₹5,18,412.2 |
| 4 | 11th mtr successive depth i) For 7.5m dia abutment wells | 4 | rm | 28,803.79 | ₹1,15,215.16 |
| 5 | ii) For 7.0m dia. pier wells | 2 | rm | 26,260.76 | ₹52,521.52 |
| 6 | 12th mtr successive depth i) For 7.5m dia abutment wells | 4 | rm | 29,184.79 | ₹1,16,739.16 |
| 7 | ii) For 7.0m dia. pier wells | 2 | rm | 26,600.91 | ₹53,201.82 |
| 8 | 13th mtr successive depth i) For 7.5m dia abutment wells | 4 | rm | 29,565.8 | ₹1,18,263.2 |
| 9 | ii) For 7.0m dia. pier wells | 2 | rm | 26,941.05 | ₹53,882.1 |
| 10 | 14th mtr successive depth i) For 7.5m dia abutment wells | 4 | rm | 29,946.8 | ₹1,19,787.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_603960.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].