SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Construction work of Bijaiyapur to Pachpakadi Link Road
2026_CEDPW_1197919_1
4721/Com(B)/Gonda Circle/26-27 DT 13.10.26
Open Tender
Civil Works
Percentage
180 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹6.5 L
Yes
Gonda
16 Oct 2026
16 Oct 2026
29 Oct 2026
16 Oct 2026
29 Oct 2026
16 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with approved material obtained from borrow pits with all lifts upto 1.50 m tramsporting to site, spreading, grading to required stope and compacted to meet requirement of Table 300.1 and 300.2b with lead upto 1000bm as per Technical Specification Clause 301.50 | 3,000 | CUM | 86 | ₹2,58,000 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 232.9 | CUM | 4,450 | ₹10,36,405 |
| 3 | Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, Type B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 309.38 | CUM | 5,250 | ₹16,24,245 |
| 4 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete, thickness as per design, over a preapared subbase, with 43 grade cement or only other type as per clause 1501.2.2 M.30 (Grade), coarse and fine aggregate not exceeding 25 mm, mixed in a concrete mixture of not less than 0.2 cum capacity and appropriate weight bactcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing) spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtyres as approved, curing of concrete slabs for 14-days, | 618.75 | CUM | 9,600 | ₹59,40,000 |
| 5 | Construction of Embankment with approved material obtained from borrow pits with all lifts upto 1.50 m tramsporting to site, spreading, grading to required stope and compacted to meet requirement of Table 300.1 and 300.2b with lead upto 1000bm as per Technical Specification Clause 301.50 ( Excluding Royaltiy) | 357.5 | Cum | 86 | ₹30,745 |
| 6 | Constuction of Culvert :Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. As per SI No. 251 | 12.61 | CUM | 125 | ₹1,576.25 |
| 7 | Providing and laying Cement concrete 1:4:8 (1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. as per SI No. 281 | 1.26 | CUM | 4,300 | ₹5,418 |
| 8 | Providing and laying dry brick ballast (O.B.B.) under and half round of the pipe including cost of all materials T&P etc complete. | 1.82 | CUM | 1,370 | ₹2,493.4 |
| 9 | First Class brick work in 1 : 4 cement and course sand in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As per SI no 305(b) | 11.06 | CUM | 5,600 | ₹61,936 |
| 10 | Stuck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and T and P etc Requuired for proper completion of work as per S.I No. 574. | 15.61 | SQM | 150 | ₹2,341.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_2263423.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .