| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr Quoted ₹5.6 Cr | L1 | Accepted-AOC L1 |
| 2 | l2₹6.7 CrRejected-Finance | ₹6.7 Cr | l2 | Rejected-Finance l2 |
| 3 | Not Admitted-Finance NO 5 255 G E B COLONY A SALAIPUDUR KOVILPATTI TUTICORIN 628 502 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628502 | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Dillibabu L1 | H.Venkateswaran L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of ACSR Zebra Conductor | 12.5 | KM | 4,00,000 ₹50 L | 5,00,000 ₹62.5 L |
| 2.00 | 230 KV 120 KN Polimer Insulators | 102 | Nos | 3,000 ₹3.1 L | 5,000 ₹5.1 L |
| 3.00 | 230 KV 90 KN Polimer Insulators | 24 | Nos | 3,000 ₹72,000 | 5,000 ₹1.2 L |
| 4.00 | HTS Tower parts | 52 | MT | 1,30,000 ₹67.6 L | 1,50,000 ₹78 L |
| 5.00 | MS Tower parts | 20.5 | MT | 1,28,000 ₹26.2 L | 1,40,000 ₹28.7 L |
| 6.00 | GI Bolts and Nuts | 3 | MT | 1,28,000 ₹3.8 L | 1,50,000 ₹4.5 L |
| 7.00 | Supply of ST Fittings for Zebra | 102 | Set | 2,500 ₹2.5 L | 4,000 ₹4.1 L |
| 8.00 | Supply of SS fitting for Zebra | 24 | set | 2,000 ₹48,000 | 3,500 ₹84,000 |
| 9.00 | Supply of SB dampers for Zebra | 102 | Set | 700 ₹71,400 | 2,500 ₹2.5 L |
| 10.00 | Supply of Midspan joint for Zebra | 10 | Set | 100 ₹1,000 | 2,000 ₹20,000 |
Tender Value
₹5.0 Cr
EMD Value
₹4.5 L
Closing Date
8 Jul 2025, 2:00 pmClosed
CE/TP-I/CNI
Guindy 230kV GIS SS campus, Chennai - 32
Ottiyambakkam omega feeder to CMWSSB at Nemmeli village Reach II under DCW basis
2025_EB_574521_1
TP1-29/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works - Others
180 days
Nemmeli
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.5 L
5 Jan 2026
27 Jun 2025
9 Jul 2025
27 Jun 2025
8 Jul 2025
27 Jun 2025
Amount
Supply of ACSR Zebra Conductor
230 KV 120 KN Polimer Insulators
230 KV 90 KN Polimer Insulators
HTS Tower parts
MS Tower parts
GI Bolts and Nuts
Supply of ST Fittings for Zebra
Supply of SS fitting for Zebra
Supply of SB dampers for Zebra
Supply of Midspan joint for Zebra
Supply of Repair sleeve for Zebra
Supply of PA rod for Zebra
Pipe type earthing
Counter poise earthing
Danger plate
Number plate
Phase plate (Set of three)
Name plate (Set of two)
Circuit plate (Set of Two)
Anticlimbing device (Set of Four)
Conducting check survey in the already fixed route, Fixing of tower location and pit marking, jungle clearance, tree cutting etc., complete.
Soil investigation by auger up to the depth of 10m or upto refusal strate where N-value obtained is 50/100 whichever met earlier, conducting penetration test at the change of layer and at specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilisation, demobilisation, shifting from location to location, water charges for drilling, etc., complete.
Earth work excavation in all soils including cost of all materials, labour, lead, lift etc., complete as directed by the Engineer at site.
PCC 1 : 3 : 6 (M10) using 20 mm HBG metal without form work for foundation including cost of all materials, curing, labour, lead and lift. etc., complete.
Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., from location to location by pulling into water as necessary using crane including transport and hire charges etc., complete.
Setting of piling and boring equipment, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer in charge at site irrespective of the location and distance of the boring rig for 500 mm dia. pile including mobilisation and demobilisation after completion of piling works etc., complete.
Supplying, fabrication of 6 mm M.S. sheet for making into circular encasing pipe for 500mm dia. pile to the required depth and diameter including welding, placing in position and driving into bore hole including cost of all materilas, MS plate, all labour charges, lead, lift, T&P, primer etc., complete.
Boring and concreting of vertical reinforced concrete in RCC M30 using 20mm HBS metal (min. cement content of 400kg/cum) using 20mm HBG metal cast in situ pile of 500 mm dia. for required depth from bottom of pile cap in all classes of soil using pile augers for boring using Bentonite slurry and filling the bore excluding cost of steel reinforement but including cost of boring with temporary guide casing, bentonite solution and the length of pile to be embedded in the pile cap including cost of all mateials,labour, Hire charges for T&P, maximum water cement ratio not exceeding 0.45 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete
Chipping and dismantling of pile concrete from bed level to cut off level of pile to meet sound concrete and clearing the dismantled concrete from pile location including cost of all labour, lead, lift charges etc., complete.
RCC M30 (minimum cement content 320 kg/ cum) using 20 mm HBG metal for pile cap with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Transport of stub, cleat and template including assembling of template, stub and cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete.
Labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete.
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., complete.
Transportation & installation of Pipe type earthing earthing for towers including cost of all T&P, labour, lead, lift etc., complete, as directed.
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Danger Plate
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Number plate
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Phase plate (set of Three)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Name plate (set of Two)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Circuit plate (set of Two)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Anti-Climbing device (Set of four)
Labour charges for Paying out & Stringing of 6 Nos of ACSR Zebra conductor including all labour charges for availing shut down on LT /HT lines providing temporary stays fixing arching horn SB dampers aromouring with PA rod whereever required all materials labours lead lift etc..complete
Supplying and Transporting, erection, testing and commissioning of 1no. OPGW 48wire including fixing of hardware fittings and accessories etc., complete (Stringing of OPGW is to be done using tension stringing equipments)
Labour charges for Transporting and hoisting of 120 KN Polymer insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under
Labour charges for Transporting and hoisting of 90 KN Polymer insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under
Supplying, spreading, filling, consolidation of well gravel for formation of approach road and stacking platform for mobilisation of pile equipment to tower site and erection of towers including cost of well gravel, compaction, casurina props, stacking with sand bags, transport, labour, dismantling & removing the platform after completion of work, lead, lift, etc., complete.
Bailing out of water by pump set during the concrete including cost of diesel pump set5.00 HP cost of all materials, diesel, engine oil, hire charges, labours, lead and lift, etc., complete.
Cleaning the tower legs and painting with anti corrosive black paint, 2 coats to the tower legs 1.00m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. Complete
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
H.Venkateswaran (BID ID -1395416)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid