| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | ₹11.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹11.5 LSame as L1Rejected-Finance | ₹11.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹11.5 LSame as L1Rejected-Finance N A | NA | NA | 121004 | ₹11.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹11.5 LSame as L1Rejected-Finance | ₹11.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 5 | L2₹11.5 LSame as L1Rejected-Finance | ₹11.5 LSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹13.6 L
EMD Value
₹40,662
Closing Date
7 Jul 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
In ward-61, work of interlocking tiles on the damaged side track in front of house no. 2B/840, from S.-4A to M.No. 4A/1186 to M.No. 4A/1187 park in front of block-15 and 4A/1080 and in 2B, in Vrindavan society, till the park of house no. 809, in fron
2026_DOLBU_1163450_21
126/Nirman/2026-27 Date 20.06.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹40,662
21 Aug 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantelling of old rcc/rb ramp brick work including stacking of material as per direction by the engineering in charge with a distance of 60 mtr si no 17.04 item no 694 pwd sor 2022 | 1.23 | cum | 1,340 | ₹1,648.2 |
| - | Taking out existing of old interlocking tile floor including stacking of dismanteled material as direction by the ingineer charge DSR 2023 item N.16.83 | 101.5 | sqm | 100.45 | ₹10,195.68 |
| - | Disposal of malba upto 8km lead as per direction in engineer in charge as per ped sor 2022 page no 18 si no 6.05 item no 305(a) | 1.23 | cum | 195.1 | ₹239.97 |
| 4 | S/l of 22.4 to 53 mm gauge stone ballast stacking for measurement etc all complete as per the direction of engineer charge (As per pwd sor 2020 RMR) | 73.25 | cum | 2,151.2 | ₹1,57,575.4 |
| 5 | Consolidation of stone ballast in aggreated 40 to 63 mm to 22. 4 to 53 mm aguge stone ballast size to water bound macadam specification including spreating in uniform thickness hand packing rolling with three wheels 80-100km static roller in satges to p | 73.25 | cum | 690 | ₹50,542.5 |
| 6 | Supply and laying of 80 mm thick precast cement concrete I shape perporated interlocking tile paver block grey colour with top layer of minimum 8mm thick having plan dimension 200x (160+120mm)of o.p cement smoothing gloss finished M30 and weight 5kg per no confirming to is 15658-2006 including cost of material labour t&p etc required for proper completion of the work as per direction by engineer in charge M30 grade as per pwd sor 2022 | 1,007.5 | sqm | 930 | ₹9,36,975 |
| 7 | Concrete with 4cm gauge brick ballast fine sand of 1.25 F.M and cement in proportion of 1:2:4 with 2cm gauge stone grit instead of 4cm gauge stone ballast As per pwd sor 2022 279 (a) | 0.6 | cum | 7,050 | ₹4,243.39 |
| 8 | Deduct cost of old tile | 2,131.5 | nos | -6 | - |
| 9 | GST | 18 | Percentage | - | - |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_2182187.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .