Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
18 Dec 2025, 3:00 pmClosed
Godhra-Ratlam Section:- Improvement of drainage system at RUB in lieu of LC 80 Km: 650/22-24.
RTM-2025-26-146~WR
RTM-2025-26-146
Open
Works - General
18 Months
Ratlam, Madhya Pradesh
₹0
₹2.3 L
18 Dec 2025
25 Nov 2025
4 Dec 2025
Item Breakup - A-DSR Items
Item Breakup - B-NS Items
Providing and Fixing in position 2 mm thick Lexan or Sqm similar make ( as per IS 14443-1997 updated )embossed Polycarbonate clear sheet for strip lighting in roof to suit the same profile of color coated metal sheet used in roofing inclusive Polycarbonate bolts & nuts, neoprene washers / self taping screws with suitable washers etc. including all lead & lift , tools and plants with fixing accessories etc. complete job and as directed by the Engineer- in- charge. NOTE :- Contractor will submit manufacturer's test certificate regarding weight, impact test, light transmission etc. complete (Note: - Rates includes with Contractor' s own drawing/design as approved by railway, Payment will be made as per item of rate of schedule only.) Total 1204100.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
corrigendumforsafetyatworkssites1.pdf
ATTACHMENT
Recommendedmakermanufacturerofcivilmaterials.pdf
ATTACHMENT
PCECircular88forQualityofWorks1.pdf
ATTACHMENT
dainikkaaryanishpaadananumatipatra1.pdf
ATTACHMENT
Specialconditionofwork.pdf
ATTACHMENT
certificateforrailwayemployeereengagement_1.pdf
ATTACHMENT
TERMINATIONCONTRACT.pdf
ATTACHMENT
ACS5GCC2022.pdf
ATTACHMENT
07.08.23ACS4.pdf
ATTACHMENT
07.08.23LAUNCHEMB.pdf
ATTACHMENT
BidCapacity-AnnexureVI.pdf
ATTACHMENT
GCC2022CorrectionSlipNo8.pdf
ATTACHMENT
BidsecurityAnnexure-VIA.pdf
ATTACHMENT
FormatforAnnualcontractualturnoverAnnexure-VIB.pdf
ATTACHMENT
GCCAPRIL2022.pdf
ATTACHMENT
MOUFORJVGCCAPRIL22WITHALLACS.pdf
ATTACHMENT
AnnexureVasperACS4dt07.08.2023.pdf
ATTACHMENT
AnnexureVA.pdf
ATTACHMENT
ACS6GCC2022.pdf
ATTACHMENT
ACS2dt13Dec22.pdf
ATTACHMENT
ACS1GCCAPR2022.pdf
ATTACHMENT
ACS3dt26APR23.pdf
ATTACHMENT
LETTEROFCREDITASMODEOFPAYMENT062018.pdf
ATTACHMENT
Safetyrules.pdf
ATTACHMENT
ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
ATTACHMENT
PROCEDUREORDERFORENSURINGSAFETYATWORKSITE.pdf
ATTACHMENT
NOrelativecertificate.pdf
ATTACHMENT
OffloadingPartSofworkRBLetterNo2022-CE-I-CT-GCC-2020-Polociydt27Apr2022.pdf
ATTACHMENT
LetterNo.2017-CE-I-CT-9date31May2023.pdf
ATTACHMENT
GCC2022CorrectionSlipNo9.pdf
ATTACHMENT
GCC2022CorrectionSlipNo7.pdf
ATTACHMENT
PBGPerformaforTenderdocument30Aug2025.pdf
ATTACHMENT
GCC2022CorrectionSlipNo10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .