Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -25.99% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹19,869.11 (6.76%)Admitted-Fee/PreQual/Technical/Finance | -20.99% | ₹3.1 L+₹19,869.11 (6.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹3.1 L+₹19,869.11 (6.76%)Admitted-Fee/PreQual/Technical/Finance 08 MOHD YOUSUF SHAH TREHGAM TREHGAM KUPWARA JAMMU KASHMIR 193224 UDYAM JK 12 0025751 | KUPWARA | JAMMU AND KASHMIR | 193224 | -20.99% | ₹3.1 L+₹19,869.11 (6.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹3.5 L+₹59,607.33 (20.3%)Admitted-Fee/PreQual/Technical/Finance | -10.99% | ₹3.5 L+₹59,607.33 (20.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹3.5 L+₹59,607.33 (20.3%)Admitted-Fee/PreQual/Technical/Finance | -10.99% | ₹3.5 L+₹59,607.33 (20.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹12,000
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of culvert near Ab Rashid , Mohd sultan dardsun.
2026_RDPR_319681_39
NIT NO 87 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹12,000
18 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means includingstacking of steel bars and disposal of unserviceable material within 50meters lead as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations,
drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including
dressing of sides and ramming of bottoms lift upto 1.5 m, including getting
out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | - | Cum | - | - |
| 3 | P/l of stone soling / RBM including all carriages.by MT10km Avg Lead | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | 1 | - |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 7 | P/F formwork of ordinary timber planks so as get rough finish for bases , foundations etc . | - | sqm | - | - |
| 8 | P/F formwork of ordinary timber planks so as get rough finish Suspended floors, roofs, landings, balconies and access platforms | - | sqm | - | - |
| 9 | Reinforcement of RCC work including cutting strighting fixing in position all complete job | - | qtl | - | - |
| 10 | Carraige of Sandbajrie lead 20 KM . | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1059769.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .