| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹23.0 L+₹2.3 L (11.4%)Rejected-Finance MATHOSHREE PLOT NO 55 SR NO 787 A BEHIND ASHWANI HOSPITAL GOVIND NAGAR NASIK 422 009 | NASIK | NASHIK | MAHARASHTRA | 422009 | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹23.9 L+₹3.3 L (16.0%)Rejected-Finance | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹24.5 L+₹3.9 L (18.9%)Rejected-Finance | L4 | Rejected-Finance Not lowest | |
| 5 | L5₹24.9 L+₹4.2 L (20.5%)Rejected-Finance | L5 | Rejected-Finance Not lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
6 Jan 2020, 6:00 pmClosed
Garrison Engineer Nasik Road
Garrison Engineer Nasik Road AOP Complex Near AOP Gate PO Gandhinagar Nasik 422006
As per Tender Documents
2019_MES_305532_1
GE/NRC/8626/E8
Open Tender
Civil Works
Item Rate
270 days
Garrison Engineer Nasik Road
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer Nasik Road
₹40,000
Yes
4 Mar 2020
10 Dec 2019
11 Jan 2020
10 Dec 2019
6 Jan 2020
24 Dec 2019
Amount
M&L for taking up vertical turbine pump 175 HP multi stage oil lubricated type B-350-9-200 from jack well 200 mm dia bore after disconnection of electrical connection earthing lines and transportation to local workshop for repairs / overhaulling of pump including dismantling the assembly , cleaning all parts of pump assembly thoroughly and finding out the defects segregating the serviceable spare parts for reuse and including machine work, reassembling the pump set after successful repair and lowering to the existing position and refixing and testing complete all as specified and directed.Make jyoti Ltd. (Note:- Spares as required shall be measured & paid seperately against the relevant items).
Supply only Impeller Holding Split ring -CI -
Supply only Bowl bearing-Bronze
Supply only Top Bowl bearing-Bronze
Supply only Lantern ring
Supply only Impeller shaft packing ring-Bronze
Supply only Discharge case bearing-Bronze
Supply only Impeller shaft coupling-AISI410
Supply only Line shaft bearing Bronze
Supply only Glide spider-CI
Supply only Rubber guide ring-STD
Supply only Rubber guide ring Circlip-STD
Supply only Gland packing-STD
Supply only Gland packing ring-Aluminium
Supply only Impeller with seal ring Bronze
Supply only motor rachet
M&L for taking up submersible pump 20 HP multi stage Model No B 93/1 from well after disconnection of electrical connection and transportation to local workshop for repairs / overhaulling of pump including dismantling the assembly , cleaning all parts of pump assembly thoroughly and finding out the defects segregating the serviceable spare parts for reuse and including machine work, reassembling the pump set after successful repair and refixing to the existing position and testing complete all as specified and directed.Make Amrut. (Note:- Spares Make Amrut as required shall be measured & paid seperately against the relevant items).
Supply only Spacer Sleeve
Supply only Top Sleeve
Supply only Lock Washer
Supply only Thrust Washer
Supply only Bearing Sleeve for Bowl
Supply only Bearing Bush G.M. for Bowl
Supply only Neck Ring (Wear Ring)
Supply only Supply only Oil Seal
Supply only Bearing Bush GM for I.P.
Taking out of centrifugal pump set from pump foundation after disconnection from motor and transportation to workshop , dismantling the pump for repair/ overhauling incluiding cleaning of all parts of pump assembly throughly, including machine work of pump shaft inorder to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less then 1mm thick & to the entire satisfaction of engr-in -charge all as specified and directed. Make -Kirloskar,DSM 150X45 (Note:- Spares Make Kirloskar as required shall be measure & paid seperately against the relevant items).
Supply only Casing Wear Ring-
Supply only shaft sleeve-
Supply only Inter Stage Ring-
Supply only Ball bearing SKF
Supply only Ball bearing SKF
Supply only Bearing cartridge DE
Supply only Bearing cartridge NDE
Supply only shaft sleeve Nuts
Supply only Split Gland
Taking out of centrifugal pump set from pump foundation after disconnection from motor and transportation to workshop , dismantling the pump for repair/ overhauling incluiding cleaning of all parts of pump assembly throughly, including machine work of pump shaft inorder to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less then 1mm thick & to the entire satisfaction of engr-in -charge all as specified and directed. Make -Kirloskar, DSM 125X40 (Note:- Spares Make Kirloskar as required shall be measured & paid seperately against the relevant items).
Supply only Casing Wear Ring-
Supply only shaft sleeve-
Supply only Inter Stage Ring-
Supply only Ball bearing SKF
Supply only Ball bearing SKF
Supply only Bearing cartridge DE
Supply only Bearing cartridge NDE
Supply only shaft sleeve Nuts
Supply only Split Gland
Disconnecting non clogging pumps of 7.5 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares Make Kirloskar as required shall be measured & paid seperately against the relevant items).
Supply only Impeller key
Supply only Gland Bush Split type
Supply only Impeller Nut
Supply only Ball bearing SKF
Supply only shaft sleeve gun metal
Disconnecting non clogging pumps of 5 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares Make Kirloskar as required shall be measured & paid seperately against the relevant items).
Supply only Impeller key
Supply only Gland Bush Split type
Supply only Impeller Nut
Supply only Ball bearing SKF
Supply only shaft sleeve gun metal
Taking up Submersible Pump assembly including column pipe approx 50 to70 mtrs using chain pulley block manually and carrying out following phase of work all as directed for 5HP/3 HP Pump Set .(i) Transportation of submersible pump -motor assembly for necessary repair. (ii) Carrying out overhauling of motor assembly 3phase ,taking out burnt winding wire,rewinding using super enamelled copper winding wire of appropriate gauge and turn,providing insulation materials and replacement of bearing and assembling with repaired/serviceable pump and testing complete all as directed by Eng-in Charge. (iii) Carrying out dismantling and overhauling of multi stage pump, incl cleaning and derusting of casing, replacement of worm out spare like bearings, impellar bushing, coupling etc & refixing of existing serviceable components after proper cleaning, machining all as required & assembling testing at workshop complete for 5 HP submersible pump of any make including carrying out painting by two coat of synthetic enamelled paint over a coat of primer,assembling the pump and motor including testing complete.(note- Rewinding / re-insulation of winding will be measure & paid seperately under relavant item of sch.)
Supply only Impeller key
Supply only Lantern ring
Supply only Impeller shaft ring
Supply only thrust Ball bearing SKF -
Supply only Water Seal
Supply only Motor pump couple bush with key
Supply only Impeller
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 175 HP/180 HP for repair purpose including complete cleaning,varnishing ,reinsulation and replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (Note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles,and taking out to local workshop submersible induction motor 20 HP for repair purpose including complete cleaning,varnishing ,insulation, replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (Note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 150/125/110/100 HP for repair purpose including complete cleaning,varnishing ,insulation replacement of DE /NDE bearings and greasing and including shifting back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (Note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 15/10 HP/7.5 HP/5 HP/3HP/1 HP 1440 RPM for repair purpose including complete cleaning,varnishing ,insulation replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (Note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, 5 HP, 900 RPM capacity motors from respective non clogging centrifugal pumps/open well submersible pumps, other rotating mechanism etc, removing from foundations, dismantling rotor and stator, bearings, cleaning the dust/dirt, overhauling thoroughly including complete varnishing and reinsulation replacement of DE /NDE bearings ,greasing, reassembling the motor, mounting on the foundations, coupling with non clogging centrifugal pumps/respective mechanism, making the electrical connections, testing and commissioning all as directed. (Note- Rewinding will be measure & paid seperately under relavant item of sch.)
Material & labour for Rewinding the motor with super enamelled copper winding wire with appropriate same gauge of exsisting coil with similar class of exsisting insulation of wire as recommended by manufacturer as directed by engr -in - charge
Supply & fix DOL Motor starter 7.5 HP in sheet-steel enclosure type MK-1 (Motor Rating AC-3 Duty, 415V, 50Hz, 3-Ph) and Relay Range 9-14 and taking down. (Make : L&T cat no SS 96210 or Equivalent OF SIEMENS)
Disconnecting DV 40 vaccum pump 7.5 HP Capacity make: Kirloskar from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares make Kirloskar as required shall be measure & paid seperately against the relevant items).
Supply only Impeller
Supply only Gland Bush
Supply only Wearing Plate
Supply only Ball Bearing
Supply only Stuffing box cover
Supply only Shaft Sleeve DE & NDE
Supply only Shaft
Dismantling/Removing of Air compressor after disconnecting all electrical connetion and removing nuts & bolts etc,from foundation. Dismantling the compressor head. Removing all defective parts as appended below, taking of compressor head, reassembling the compressor head after replacement of head gasket and other defective parts, as required including cleaning, servicing and overhauling the compressor. Reinstallation, commissioning and testing complete and replacement of compressor oil, all as specfied and directed. Make ELGI Capacity 10 Kg/Cm2. (Note:- Spares Make ELGI as required shall be measured & paid seperately against the relevant items).
Supply only Piston Ring
Supply only Bush Bearing
Supply only Connecting rod bush
Supply only Piston Pin
Supply only Scrapper Oil Ring
Supply only Piston
Supply only Safety Valve
Supply only Piston Pin bush
Supply only Fan belt
Disconnecting non clogging pumps type SP4LA of 10 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares Make Kirloskar as required shall be measured & paid seperately against the relevant items).
Supply only Bearing Housing
Supply only DE bearing cover
Supply only Impeller
Supply only Impeller Nut
Supply only Shaft
Supply only Rubber Flap assy
Supply only Shaft Sleeve
Supply only Wearing plate DE
Supply only Wearing plate NDE
Supply and fix in repair MCCBs of following type and capacity as directed by Engg-In-Charge.
630 Amps 4 pole 50 KA,Frame size -SKB-3 adjustable thermal setting 70-100% Model NO -ISLCNF630 of Make Standard/Havells/Schenider.
800 Amps 4 pole 50 KA,Frame size -SKB-4 adjustable thermal setting 70-100% Model NO -ISLCHF0800 of Make Standard/Havells/Schenider.
Supply and fix in repair MCCBs of 400 Amps 3 pole 50 KA,Frame size -SKB-4 adjustable thermal setting 70-100% Model NO -ISLCHT0315 of Make Standard/Havells/Schenider.
NOTE :- AMOUNT OF SCHEDULE OF CREDIT RS. 43,495.00 WILL BE DEDUCTED FROM TOTAL AMOUNT OF BOQ.
DURGAI ELECTRICALS
M/s Anil Builders
M/S MK Nair
SHILPVED
Bidder Name
DURGAI ELECTRICALS
UNITED ENTERPRISES
M/S MK Nair
M/s Anil Builders
SHILPVED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .