Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹2.0 Cr+₹19,715.32 (0.10%)Rejected-Finance | ₹2.0 Cr+₹19,715.32 (0.10%) | L2 | Rejected-Finance Above to Lowest Rate |
| 3 | L3₹2.0 Cr+₹2.2 L (1.10%)Rejected-Finance | ₹2.0 Cr+₹2.2 L (1.10%) | L3 | Rejected-Finance Above to Lowest Rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 Cr
EMD Value
₹19.7 L
Closing Date
5 May 2026, 1:00 pmClosed
Executive Officer
NPP MAU
Ward No 11 Khwajajahanpur me Jiladhikari Aawas Mod se Tata Agency Puliya Tak RCC Naala Nirmad Karya
2026_DOLBU_1122695_1
64-07
Open Tender
Civil Works
Percentage
180 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,080
Executive Officer
₹19.7 L
21 May 2026
9 Mar 2026
5 May 2026
9 Mar 2026
5 May 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Execavation in foundation in ordinary soil (Loam clay sand) includding filling left up to 1.5m and lead up to 30m. With 3km. Cartage including all complete. Item no.-251 | 2,688 | Cum | 115 | ₹3,09,120 |
| 2 | Cement Concrete with 4cm. Gauge approved stone ballast approved coarse brick ballast and cement in the proprotion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion for | 360 | Cum | 3,495 | ₹12,58,200 |
| 3 | R.C.C. work in 1:1.5:3 cement and C. sand and 20mm. Stone grit in slab including all complete. Item no.-284 | 993.76 | Cum | 9,430 | ₹93,71,156.8 |
| 4 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work including all complete. Item no.-504 | 858.11 | Qtl | 5,650 | ₹48,48,330.99 |
| 5 | M-150 Brick work in 1:4 cement and sand mortar supply of all materials, labours etc including all complete work. | 1.53 | Cum | 4,980 | ₹7,619.4 |
| 6 | Cement plaster in 1:4 cement and fine sand mortar including all complete work. | 9.8 | Sqm | 160 | ₹1,568 |
| 7 | Disposal of malva distance 5.0 km distance including all completed work etc | 2,688 | Cum | 183.5 | ₹4,93,248 |
| 8 | Cartage of materials 3.0 chanage included all completed work. | 1,353.76 | Cum | 90 | ₹1,21,838.4 |
| 9 | Dewatering during constrition period by macanical /manual etc. all complete. | 1 | Job | 25,000 | ₹25,000 |
| 10 | Baricating the site traffic control in all completed work (quotation/Market rate) | 1,200 | RM | 178 | ₹2,13,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
tech64.pdf
Tender Documents • 1.27 MB
BOQ_2090925.xls
BOQ • 0.25 MB
corridate64.pdf
PDF • 0.25 MB
datecorri64.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .