| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | ₹4.5 L Quoted ₹3.8 L | L1 | Accepted-AOC Techno commercially accepted L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not evaluated as Bidder is non-L1 |
| 3 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | - | Rejected-Technical Not evaluated as Bidder is non-L1 |
| Sl No | Description | Qty | Unit | RAMANUJ KUMAR L1 | Ram Awadh Singh L3 | M/S CHANDRAMA SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Transportation, lying, charging of 120mm² Armoured cable from surface to underground. (Length of cable as well as distance of laying of cable). Rate for 1000m distance = 127.215/m cable. Rate for 1800m distance = 126.234 x 1.8 = 228.987/m cable | 1,800 | m | 98 ₹1,76,400 Lowest | 148 ₹2,66,400 | 120.4 ₹2,16,720 |
| 2.00 | Shifting of TSU & VCB, un-coupling, coupling with 250m armoured cables (50/70/90mm²) laying thereof within the district in UG. (From Surface to underfround) (a) From Surface to Proposed substation at 13D/24L (b) From Surface to Proposed Substation at 4D/38L | 2,618 | m | 64 ₹1,67,552 Lowest | 87 ₹2,27,766 | 71 ₹1,85,878 |
| 3.00 | Contracor Profit | 1 | Job | 36,552 ₹36,552 Lowest | 49,878 ₹49,878 | 40,359 ₹40,359 |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹9.9 L
EMD Value
₹12,400
Closing Date
4 Dec 2025, 6:00 pmClosed
SO EnM JK Area
GM Office, JK Area
A Transportation laying charging of 120mm2 Armoured cable from surface to underground for LHCM Marching further operation and B Shifting of TSU VCB uncoupling coupling with 250m armoured cables 50 70 90mm2 laying thereof from surface to 13D24L 4D3
2025_SECL_347935_1
SECL/JK/SO(EnM)/eNIT/25-26/55
Open Tender
Miscellaneous Works
Item Rate
60 days
Bartarai UG mine
as per NIT
3 documents required · 3 mandatory
₹12,400
18 Feb 2026
22 Nov 2025
5 Dec 2025
22 Nov 2025
4 Dec 2025
23 Nov 2025
22 Nov 2025 - 27 Nov 2025
Transportation, lying, charging of 120mm² Armoured cable from surface to underground. (Length of cable as well as distance of laying of cable). Rate for 1000m distance = 127.215/m cable. Rate for 1800m distance = 126.234 x 1.8 = 228.987/m cable
Shifting of TSU & VCB, un-coupling, coupling with 250m armoured cables (50/70/90mm²) laying thereof within the district in UG. (From Surface to underfround) (a) From Surface to Proposed substation at 13D/24L (b) From Surface to Proposed Substation at 4D/38L
Contracor Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.85 MB
Tendernotice_3.pdf
PDF • 1.10 MB
Tendernotice_4.pdf
PDF • 0.03 MB
BOQ_360658.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .