Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3 L
EMD Value
₹9,000
Closing Date
21 Oct 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
office of the executive engineer rew angoffice of
office of the executive engineer rew ang
CONSTRUCTION OF PALYFIELD AT MIDDLE SCHOOL HARPORA WAJOORA BLOCK PAHALGAM
2026_RDPR_328163_5
ENIT124of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹9,000
14 Oct 2026
14 Oct 2026
22 Oct 2026
14 Oct 2026
21 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of JCB for Site clearance by the way of removing of stone boulders levelling of surface surface excavation and removal of shrubs hurbs etc. as directed by engineer in charge subjected to actual | 11 | hrs | 1,200 | ₹13,200 |
| 2 | Earth work in excavation by manual means in trenches for foundations drains , pipes , cablesetc. (not exceeding 1.5 m in width ) and for shafts ,wells , cesspits and the like not exceeding 50 sqm on plan depth up to 1.5 m including disposal ofexcavated earth up to 1 m from cutting edge disposal earth is to be leveled and neatly dressed in all kinds of soil. | 9.08 | cum | 478 | ₹4,340.24 |
| 3 | Providing and laying stone soling hand packed in foundation complete with all costs and carriages. | 10 | Cum | 1,000 | ₹10,000 |
| 4 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 26.88 | Cum | 5,733.6 | ₹1,54,107.7 |
| 5 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job. | 158.92 | sqm | 286.35 | ₹45,506.74 |
| 6 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) including Spreading of good earth in required thickness as per directions of officer in-charge.
i/c carriage avg lead 10km | 74.77 | sqm | 637.33 | ₹47,650.61 |
| 7 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 40 kms | 49.71 | cum | 465.14 | ₹23,123.5 |
| 8 | Add provison for carriage of cement /structural steel etc .(To be paid as per actual) | 1 | trip | 1,000 | ₹1,000 |
| 9 | Add for Signboard and Photographic Charges | 1 | lumsum | 1,000 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1110865.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .