| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 CrAccepted-AOC | ₹3.1 Cr Quoted ₹2.6 Cr | L-1 | Accepted-AOC The work is awarded to L-1 bidder. |
| 2 | L-2₹3.1 Cr+₹43.4 L (16.5%)Rejected-Finance 154 I C C T P NAGAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹3.1 Cr+₹43.4 L (16.5%) | L-2 | Rejected-Finance DUE TO L-2 BIDDER |
| 3 | Rejected-Technical HOUSE NO 206 AMAN GARG BISHRAMPUR MAIN ROAD DISTT SURAJPUR C G | BISHRAMPUR | SURAJPUR | CHATTISGARH | 497226 | - | - | Rejected-Technical All confirmatory documents not submitted The bidder has not submitted the work completion certificate of similar nature as given in NIT |
Tender Value
₹3.8 Cr
EMD Value
₹4.8 L
Closing Date
31 Oct 2022, 5:00 pmClosed
General Manager (Civil), SECL, Gevra Area
Office of the General Manager (Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)
Providing cement concrete (CC) pavement to coal transportation roads i.e., 1. Construction of connecting CC coal transportation road from CISF exist barrier to Gevra Kusmunda coal transportation road (Length-500 M x 7 M wide) 2. Construction of CC co
2022_SECL_259323_1
SECL/GA/GM(C)/ETN/22-23/118 dtd 14/10/2022
Open Tender
Civil Works - Others
Item Rate
180 days
Gevra Area
As per NIT
5 documents required · 5 mandatory
₹4.8 L
10 Jan 2023
15 Oct 2022
2 Nov 2022
15 Oct 2022
31 Oct 2022
16 Oct 2022
15 Oct 2022 - 24 Oct 2022
Amount
(Part-A (Road Portion)
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Add extra in Item above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. I) Mild steel
Add extra in Item above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. I)Tor steel
(Part-B (Two Nos. Boax Culvert (2M x 2M)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per relevant clauses of section 300 & 2100 in By Mechanical Means Depth upto 3 m .
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . PCC Grade M15
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . PCC Grade M25
Provdiing and laying Plain/Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with . RCC Grade M25
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications and as per relevant clauses of section 1600.
Providing weep holes in Brick masonry /Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC/PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Total impact of GST for the purpose of CTC
M.K. Gupta and Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .