| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹2,640
Closing Date
28 Feb 2023, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Renovation Upgradation of Main Ravi Canal from RD 43870 to 43885M at spots
2023_IFC_205747_1
e-NIT No. 15 of 2022-23
Open Tender
Civil Works - Canal
Item Rate
20 days
Hiranagar
As per SBD
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹2,640
Executive Engineer RCC Lower Division Hiranagar
3 Mar 2023
22 Feb 2023
1 Mar 2023
22 Feb 2023
28 Feb 2023
22 Feb 2023
22 Feb 2023 - 25 Feb 2023
25 Feb 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Extra for every additional lift of first lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Extra for every additional lift of second lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Preparing and dressing side slopes of canals for lining. In ordinary soils
Preparing and dressing beds of canals for lining. In ordinary soil
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). in side slopes, - at a height over 3.5 m but upto 5.5m above bed
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In beds
Extra for Scaffolding
Curing canal lining for 28 days. In beds
Curing canal lining for 28 days. In side slopes
Carriage of Materials from Source to site of work a) Carriage of Sand and Stone agg. (20mm Nominal Size) av. 10 Kms by Mechincal Transport
Carriage of Materials from Source to site of work c) Carriage of Disposal of Silt/Dismantled Material av. 02 Kms by Mechincal Transport
Kushal Singh
MOHINDER PAUL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .