Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹8.7 L+₹2.7 L (45.3%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹8.7 L+₹2.7 L (45.3%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹8.9 L+₹2.9 L (48.6%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Jammu
Air Force Station Jammu
REPAIR AND MAINTENANCE OF PACKAGE TYPE AIR COOLED BLOWER SYSTEM AND OTHER CONNECTED ITEMS AT AF STN JAMMU UNDER GE (AF) JAMMU
2022_MES_560007_1
CA NO GE/AFJ-28/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Jammu
As per tender documents
8 documents required · 8 mandatory
₹500
GE (AF) Jammu
₹20,000
Yes
5 Apr 2023
28 Oct 2022
26 Nov 2022
28 Oct 2022
24 Nov 2022
10 Nov 2022
Amount
Dismantaling and taking down existing duct of any size and type with insulation of any types complete in all respect all as specified and directed.
Supply , assembly and erection of GI sheet with C & SS rectangular/square duct made out of 'L' shaped hollow profile, duly factory boxed, incl all accessories such as corner, cleat, carriage bolt, gasket and appropriate sealant on longitudinal joints etc of size 18 Gauge complete in all respect all as specified and directed. Note:-The duct shall be fabrication in factory as per IS655-2006 and to be assembeled at the site, No fabriction at site will be permitted . Contractor must visit the site before quoting of the rates .The whole ducting shall be tested for any leakage and vibration after completion of job all as specified and directed. Make:- Bajaj steel Industries/Cool Tech Engineers/Puri Air Conditioning/Pioneer Airtech
S & F framed brackets of angles or tees with web and flanges for duct supports cut to shape, drilled and countersunk for screw, including bending and welding angles, as necessary, gusset plates, riveting, etc.. n exc 10 kg each brackets, conforming to Fe.290.Gde-E-165 with taking down old u/s MS Channel support of AC duct complete in all respect all as specified and directed.
Supply and fixing for thermal insulation of supply/return air duct with cross linked closed cell performed sections of polyethylene (FR) insulation of 25 mm laminated with Aluminium Metalised polyester foil having a low stable k value of 1.6 with minimum density of 28 kg/cum duly pasted on duct with good quality adhesive and nitrile tape, isulation over duct shall be provided in such a way that it should cover the duct from all the sides including supports complete in all respect all as specified and directed
M&L for taking down and refixing existing grill of any size and any type all as specified and as directed.
S&F primary air filter for particulate size 5 micron and of size 600x600mm all as per existing type with taking down old u/s air filter complete in all respect all as specified and directed
M&L for fixed in repair V belt as per existing size for air blower complete in all respect all as specified and directed.
Material and Labour for disconnecting and removing the motor of any make/model / type,capacity 5 to 10 HP from Cooling tower (location UGBO,Auditorium) and foundations/ base frame located at different locations, by disconnecting electrical connections and pump couplers, taking it to workshop for repair, rotor assembly, removing burnt out winding wires complete, Rewinding of Motor same guage and type of insulation copper conductor winding wires and insulation sheets , applying insulating varnish over the complete winding, drying up by heating , assembling back and rotor including replacement of bearing, nuts, bolts, studs, Gasket, packing, locking pin, terminal blocks, and terminal bolts and nuts and misc accessories & hardware required for making motor functional, both end bearings (labour only) with same size/make complete for 3Ph, 415V, motors all as specified and as directed.Note : Bearing rate also included in the quoted rate by the comntractor.
S& F removing old u/s starter and fixing new starter capacity of 7.5 HP three phase complete all asspecified and directed by Engr In Charge
Material and Labour for disconnecting and removing the motor of any make/model / type,capacity 7 to 15 HP from condenser unit,chiller unit(location UGBO,Auditorium) and foundations/ base frame located at different locations, by disconnecting electrical connections and pump couplers, taking it to workshop for repair, rotor assembly, removing burnt out winding wires complete, Rewinding of Motor same guage and type of insulation copper conductor winding wires and insulation sheets , applying insulating varnish over the complete winding, drying up by heating , assembling back the and rotor including replacement of bearing, nuts, bolts, studs, Gasket, packing, locking pin, terminal blocks, and terminal bolts and nuts and misc accessories & hardware required for making motor functional, both end bearings (labour only) with same size/make complete for 3Ph, 415V, motors all as specified and as directed.Note : Bearing rate also included in the quoted rate by the comntractor.
Material and Labour for disconnecting and removing the MOTOR of any make/model / type,capacity 15 to 25 HP from AHU (location UGBO,Auditorium)and foundations/ base frame located at different locations, by disconnecting electrical connections and pump couplers, taking it to workshop for repair, rotor assembly, removing burnt out winding wires complete, Rewinding of Motor same guage and type of insulation copper conductor winding wires and insulation sheets , applying insulating varnish over the complete winding, drying up by heating , assembling back the and rotor including replacement of bearing, nuts, bolts, studs, Gasket, packing, locking pin, terminal blocks, and terminal bolts and nuts and misc accessories & hardware required for making motor functional, both end bearings (labour only) with same size/make complete for 3Ph, 415V, motors all as specified and as directed.Note : Bearing rate also included in the quoted rate by the comntractor.
S&F removing old u/s fins capacity as per sample and fixing of fins complete all as specified and directed by Engr In charge
M&L for servicing of cooling tower capacity of 110TR complete all as specified and directed by Engr In Charge
SCHEDULE 'A' PART-II (Schedule of credit) Credit amount of Rs (Refer schedule of credit) for retrieved material mentioned in Sch 'A' Part-II of Tender documents in PDF form will be deducted offline during acceptance of tender of lowest bidder.
Note: (1) The repair has to carried out as and when required basis and accordingly site will be available in piecemeal wise and as directed by Enginer-in-Charge in the Air Force station area or Kaluchak area .
M/S VIDYA ENTERPRISES
VIDHATA ELECTRICALS
M/S SALARIA ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .