Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.9 L+₹9,700 (5.39%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹2 L
Closing Date
11 Mar 2022, 4:30 pmClosed
xen rew kathua
xen rew kathua
Constt. of D Drain near SC moh.
2022_RDPR_163072_3
e-NIT No. 340/REW/K of 2021 Dated 04/03/2022
Open Tender
Civil Works
Item Rate
20 days
duggan
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rew kathua
Exempted
14 Mar 2022
4 Mar 2022
12 Mar 2022
5 Mar 2022
11 Mar 2022
5 Mar 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1m from cutting edge and disposal of surplus excavated earth as directed:All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)(Including all leads and lifts and all type of carriages by MT/HL)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(Including all leads and lifts and all type of carriages by MT/HL)
Stone filling in horizontal including supply of stone
Centering and shuttering including strutting, propping etc. and removal of form work for:
12mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4( 1 cement : 4 fine sand)(Including all leads and lifts and all type of carriages by MT/HL)
Providing and fixing CIB of approved size by way of making foundation in M10, Brickwork in 1:6 cement mortar including plastering with 1:4 cement mortar, painting and writings as per the direction of engineer incharge including all carriages , supply , complete job.
Mr Javeed Ahmed
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .