| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.0 L+₹19,900 (2.03%)Rejected-Finance | ₹10.0 L+₹19,900 (2.03%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.1 L+₹30,000 (3.06%)Rejected-Finance | ₹10.1 L+₹30,000 (3.06%) | L3 | Rejected-Finance L3 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Jun 2026, 6:00 pmClosed
DPLO
HABS Building Below Rajbhavan
Const of Protection wall at Raniban Busty under Sansad II
2026_DMD_5014833_1
niet1/plan/2026-27
Open Tender
CIVIL WORKS
Percentage
60 days
Raniban Busty, Sanad III, Darjeeling Pulbazar block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
30 Jul 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Protection wall at Raniban Busty under Sansad III,Darjeeling Pulbazar block,Darjeeling | |||||
| 1.01 | Earth work in excavation of foundation trenches or
drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,
spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. | - | cum | 119.27 | - |
| 1.02 | Earth work in filling of foundation trenches or
drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,
spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. | 1 | cum | 77.54 | ₹77.53 |
| 1.03 | Labour for laying 150 mm to 200 mm boulder soling including roughdressing hand packing and ramming down small pieces in the interstics
including rolling and preparing the bed to proper level and filling up alljoints with sandy clay or earth. | - | sqm | 50 | - |
| 1.04 | cost of Stone Boulder 150mm of N. Bengalvariety | 1 | cum | 1,272 | ₹1,271.87 |
| 1.05 | cement concrete with 30mm downgraded shingles excluding shuttering NB varitey in gF 1:3:6 | - | cum | 5,397.74 | - |
| 1.06 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | 171 | sqm | 334 | ₹57,114 |
| 1.07 | 11 Plum concrete work with 40 % cement concrete with 30 mm down graded
stone metal and 60 % stone boulder of size 150 mm and above, placed in
position as directed excluding shuttering if any. | 0.8 | cum | 3,964.8 | ₹3,167.88 |
| 1.08 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding | - | sqm | 242.13 | - |
| 1.09 | M.S. structural works in columns, beams etc. with simple rolledstructural members (e.g. joists, angle, channel sections conforming
to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with
bracket, gussets, cleats as per design, direction of Engineer-incharge
complete including cutting to requisite shape and length,
fabrication with necessary bolting, metal arc welding conforming to
IS: 816- 1969 & IS: 1995 using electrodes of approved make and
brand conforming to IS:814- 2004, haulage, hoisting and erection
all complete. The rate includes the cost of rolled steel section,
consumables such as electrodes, gas and hire charge of all tools and
plants and labour required for the work including all incidental
chages such as electricity charges, labour insurance charges etc. | - | mtr | 89,904 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
sbdnew111111.pdf
Tender Documents • 0.47 MB
BOQ_5083248.xls
BOQ • 0.34 MB
corrigendum.PDF
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .