| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S. ABL CONSTRUCTIONS L2 | M/S.J M Constructions L1 |
|---|---|---|---|---|---|
| 1.001.Strengthening of BT Road @ Thodukadu to Pallaramanjuapuram Road KM 0/0-2/0 | |||||
| 2.00 | Clearing the Scrub jungles with uprooting as per standard specifications | 2,416.5 | m2 | 8.9 ₹21,506.85 | 6.3 ₹15,223.95 |
| 3.00 | Earth work excavation in all soils and subsoils to full depth as may be directed except hard rock requiring blasting but inclusive of shoring ,strutting,sectioning etc as per ss20A. | 644.4 | m3 | 145.58 ₹93,811.75 | 140 ₹90,216 |
| 4.00 | Picking the existing worn out metalled surface as per standard specifications | 2,237.5 | m3 | 26.65 ₹59,629.38 | 23.3 ₹52,133.75 |
| 5.00Providing Gravel soling from approved quarry and stacking them at site to dept. gauge for pre-measurement including cost, conveyance and labourcharges etc. complete. For Berms | |||||
| 6.00 | CH 0/0-1/0 | 177.75 | m3 | 822 ₹1.5 L | 819 ₹1.5 L |
| 7.00 | CH 1/0-2/00 | 225 | m3 | 835.45 ₹1.9 L | 829 ₹1.9 L |
| 8.00 | Providing and laying 100mm compacted thick Wet Mix Macadam using 0.39cum of 45mm to 22.40mm IRC HBG metal and 0.396 cum of 2.36mm and below metal laying spreading and compacting grqaded stone aggegate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 of MORT & H specificaiton | 839.06 | m3 | 2,945.45 ₹24.7 L | 2,939 ₹24.7 L |
| 9.00 | Providing BITUMINOUS MACADAM 50 MM THICK to the required thickness of 50mm using 0.42m3 of 26.50mm to 0.13m3 of 11.20mm to 4.75mm metal 0.18m3 of 4.75mm metal with 38kgs Bitumen binder for 10m2 37.50mm consolidated thickness including cost and stacking standard dept gauge for pre measurement with power roller including hire and fuel charges for power roller bitument bioiler mini hot mix plant and all other tools and plants etc complted as per clause 504 of most specifications (Paver Finisher) | 335.63 | m3 | 9,350.5 ₹31.4 L | 9,343 ₹31.4 L |
| 10.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 6,712.5 | m3 | 88 ₹5.9 L | 85.8 ₹5.8 L |
Tender Value
₹1.2 Cr
EMD Value
₹1.1 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
Strengthening of BT road from Thodukadu to Pallaramanjuapuram Road at Thodukadu panchayat in Kadambathur Block pac.12
2026_RDTN_656615_1
618/2026/A7 Dt.11.02.2026
Open Tender
Civil Works
180 days
Kadambathur Block
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹1.1 L
Yes
10 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
14 Feb 2026
1.Strengthening of BT Road @ Thodukadu to Pallaramanjuapuram Road KM 0/0-2/0
Clearing the Scrub jungles with uprooting as per standard specifications
Earth work excavation in all soils and subsoils to full depth as may be directed except hard rock requiring blasting but inclusive of shoring ,strutting,sectioning etc as per ss20A.
Picking the existing worn out metalled surface as per standard specifications
Providing Gravel soling from approved quarry and stacking them at site to dept. gauge for pre-measurement including cost, conveyance and labourcharges etc. complete. For Berms
Providing and laying 100mm compacted thick Wet Mix Macadam using 0.39cum of 45mm to 22.40mm IRC HBG metal and 0.396 cum of 2.36mm and below metal laying spreading and compacting grqaded stone aggegate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 of MORT & H specificaiton
Providing BITUMINOUS MACADAM 50 MM THICK to the required thickness of 50mm using 0.42m3 of 26.50mm to 0.13m3 of 11.20mm to 4.75mm metal 0.18m3 of 4.75mm metal with 38kgs Bitumen binder for 10m2 37.50mm consolidated thickness including cost and stacking standard dept gauge for pre measurement with power roller including hire and fuel charges for power roller bitument bioiler mini hot mix plant and all other tools and plants etc complted as per clause 504 of most specifications (Paver Finisher)
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Sign Board
Road Marker /Road stud with lens Reflector
Provision for HM Stones of size 0.75m x 0.23m x 0.10m
Provision for KM Stones of size 1.65m x 0.45m x 0.15m
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.29 MB
KBT_12__TechnicalBid.pdf
Tender Documents • 0.66 MB
KBT_12_PRICEBID.pdf
Additional Documents • 0.35 MB
BOQ_787429.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid