| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 CrAdmitted-Finance KOLHAPUR | MAHARASHTRA | 415101 | L1 | Admitted-Finance | |
| 2 | L2₹16.4 Cr+₹16.2 L (1.00%)Admitted-Finance OFFICE NO 03 2ND FLOOR SUNIKET BUSINESS CENTER CYCLE CIRCLE KRUSHI NAGAR JOGGING TRACK NASHIK | NASHIK | NASHIK | MAHARASHTRA | 422005 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical 2 INDIRA HEIGHTS JUNA GANGAPUR NAKA GANGAPUR ROAD NASHIK 422 002 | NASHIK | NASHIK | MAHARASHTRA | 422002 | - | Rejected-Technical Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | VAIBHAV CONSTRUCTIONS L1 | M/S HARSHVARDHAN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 580 | Square Metre | 7 ₹4,060 Lowest | 7.07 ₹4,100.6 |
| 2.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 281.52 | Square Metre | 45 ₹12,668.4 Lowest | 45.45 ₹12,795.08 |
| 3.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 metre) | 1,840.47 | Cubic Metre | 207 ₹3,80,977.29 Lowest | 209.07 ₹3,84,787.06 |
| 4.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 metre) | 340.48 | Cubic Metre | 227 ₹77,288.96 Lowest | 229.27 ₹78,061.85 |
| 5.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5metre) | 33.01 | Cubic Metre | 252 ₹8,318.52 Lowest | 254.52 ₹8,401.71 |
| 6.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth / murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5metre) | 433.72 | Cubic Metre | 429 ₹1,86,065.88 Lowest | 433.29 ₹1,87,926.54 |
| 7.00 | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and back filling with available earth soil /murum watering, ramming etc. complete. (Lift upto 1.5 metres) | 1 | Cubic Metre | 1,322 ₹1,322 Lowest | 1,335.22 ₹1,335.22 |
| 8.00 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 metres). | 1,898.18 | Cubic Metre | 1,307 ₹24,80,921.26 Lowest | 1,320.07 ₹25,05,730.47 |
| 9.00 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5 metres To 3.0 metres) | 316.42 | Cubic Metre | 1,033 ₹3,26,861.86 Lowest | 1,043.33 ₹3,30,130.48 |
| 10.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5metre To 3.0 metre) | 262.5 | Cubic Metre | 524 ₹1,37,550 Lowest | 529.24 ₹1,38,925.5 |
Tender Value
₹16.2 Cr
EMD Value
₹8.1 L
Closing Date
26 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Public Works Division (North),
Executive Engineer, Public Works Division, (North) Nashik, Green Building First Floor, Untawadi Road, Nashik, Tal. Dist. Nashik ,Tel. No.- 0253-2576249
Development of Essential Works at Shri Ram Shaktipeeth Tirthkshetra, Swami Ashram, Chakratirth, Chakore Beje for the Sinhastha Kumbhamela 2027-28 , Tal.Trimbakeshwar , Dist. Nashik.
2026_PWR_1345842_1
E_tender_Notice_no. 21 for 2026-27
Open Tender
Civil Works
Item Rate
180 days
trimbakeshwar
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,540
₹8.1 L
Chief Engineer, P.W. Region, Nashik
4 Nov 2026
19 Oct 2026
27 Oct 2026
19 Oct 2026
26 Oct 2026
19 Oct 2026
21 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 580 | Square Metre | - | - |
| 2 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 281.52 | Square Metre | - | - |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 metre) | 1,840.47 | Cubic Metre | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 metre) | 340.48 | Cubic Metre | - | - |
| 5 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5metre) | 33.01 | Cubic Metre | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth / murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5metre) | 433.72 | Cubic Metre | - | - |
| 7 | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and back filling with available earth soil /murum watering, ramming etc. complete. (Lift upto 1.5 metres) | 1 | Cubic Metre | - | - |
| 8 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 metres). | 1,898.18 | Cubic Metre | - | - |
| 9 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5 metres To 3.0 metres) | 316.42 | Cubic Metre | - | - |
| 10 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5metre To 3.0 metre) | 262.5 | Cubic Metre | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_2299488.xls
BOQ • 0.51 MB
PDF2101.pdf
Tender Documents • 8.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .