Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC LOW RATE QUOTED |
| 2 | L2₹4.1 LRejected-Finance | ₹4.1 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | G.Vijaya Constractor L1 | N VENKATESAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 54.18 | m3 | 263 ₹14,249.34 | 270 ₹14,628.60 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete for 10cum | 9.03 | m3 | 5,350 ₹48,310.50 | 5,400 ₹48,762 |
| 3.00 | Plain Cement Consrete 1:2:4 using 20mm jelly for wearing coat including laying, compacting, finishing and curing etc... | 23.74 | m3 | 6,135 ₹1.5 L | 6,200 ₹1.5 L |
| 4.00 | Plastering with Cement mortor 1.5 (one cement and Five P.Sand) 20 mm thick in all floors including curing etc. Complete complying with standard specification and as directed by the departmental officers | 38.7 | m3 | 590 ₹22,833 | 600 ₹23,220 |
| 5.00 | Centering and Shutering for Sids including all cost and conveyance and all labour charges exc... Complete | 206.4 | m3 | 547 ₹1.1 L | 550 ₹1.1 L |
| 7.00 | GST 18% | 1 | No | 61,908.94 ₹61,908.94 | 62,517.35 ₹62,517.35 |
| 8.00 | LWF 1% | 1 | No | 3,439.39 ₹3,439.39 | 3,473.19 ₹3,473.19 |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹4,150
Closing Date
6 Jan 2026, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
Construction of side drainage at Throwpathi amman koil street in Kilpudhupakkam
2026_RDTN_638627_1
A6/565/25-Drainage Kilpudupakkam
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,150
7 Mar 2026
3 Jan 2026
6 Jan 2026
3 Jan 2026
6 Jan 2026
3 Jan 2026
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete for 10cum
Plain Cement Consrete 1:2:4 using 20mm jelly for wearing coat including laying, compacting, finishing and curing etc...
Plastering with Cement mortor 1.5 (one cement and Five P.Sand) 20 mm thick in all floors including curing etc. Complete complying with standard specification and as directed by the departmental officers
Centering and Shutering for Sids including all cost and conveyance and all labour charges exc... Complete
N VENKATESAN (BID ID -1555171)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_764428.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid