| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.0 Craccepted-finance | ₹1.0 Cr | accepted-finance |
Tender Value
₹83.6 L
EMD Value
₹1.7 L
Closing Date
30 Jun 2026, 4:00 pmClosed
Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Sankratti to the existing 33/11 KV MUSS Koligudda for a distance of 3 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on Total Turnkey basis
HESCOM/2026-27/EL/WORK_INDENT1219/CALL-2
HESCOM/2026-27/EL/WORK_INDENT1219/CALL-2
Open
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have Constructed 33kV/above class lines or Recondutoring of 33KV or above class lines for a minimum distance of 80% of tendered quantity on Total Turnkey or Partial turnkey or Labour Contract basis in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note: Please note that the date of issuance of the work completion or performance certificates must be at least one year after the actual date of work completion
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder
The Bidder should have achieved in at least Two financial year, an average annual financial turnover of not less than the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 25.07Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving 33KV and above class, substations /Construction of lines/Reconductoring of lines of value not less than 50% of the Amount put to Tender in any State/Central Govt./ Distribution Companies/PSUs in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25)As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.Note: Please note that, Award cost and Executed cost must be mentioned in the work completion/Performance certificates.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹2,090
₹1.7 L
25 Jun 2026
18 Jun 2026
29 Jun 2026
22 Jun 2026
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '9 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "9 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2026-27/EL/WORK_INDENT1219/CALL-2 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Executed cost Rs.in Lakhs
Note:Works completed during the period from (i.e., 2020-21,2021-22,2022-23 2023-24 and 2026-27) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Sankratti to the existing 33/11 KV MUSS Koligudda for a distance of 3 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on Total Turnkey basis.
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 5781119.29 5781119.29
2 Labour charges+ Decommissioning (Exclusive of GST) 1114430.52 1114430.52
3 Civil Engineering Charges (Exclusive of GST) 68651.39 68651.39 2.806226956
5 Area Specific Loading @ 5% on labour charges 0 0 0.00 0.00
Contractors Profit @ 10% on Sl No. Sl No. 4 & 5 578111.93 111443.05 6865.14 696420.12
% age of tender compenents included 236.00
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Sankratti to the existing 33/11 KV MUSS Koligudda for a distance of 3 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
Part-A 33KV Line Estimate
Sl. No Particulars Unit Qty Material Cost Erection Charges
Rate Amount Rate Amount
1 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Three pole structure of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Set 3 42323.00 126969.00 16448.00 49344.00 4114
Supply of 9.5 Mtr long, 350 kg WL RCC for 3 pole structure (As per KPTCL SR- 2025-26, Page No- 3 of 50, SL.No-08) (Rs.10015 X 3 = 30045) 14888 75 DP 7
Three pole structure for 33kV. (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-13) (Rs. 6139*2=12278) 4251 TP 4
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370x3 Nos= 13110.00) 12753 64
Erection of three pole structure using 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 35 of 50, Sl No: 34 , Rs:3682*2=7364 in this amount less the errection chargers of 1No's 9.5mtr RCC pole Rs:1590, Total amount: 7364-5523) 6678.00 5208
2 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Double Pole Structure of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Set 6 26169.00 157014.00 13544.00 81264.00 2806
Supply of 9.5 Mtr long, 350 kg WL RCC for two pole structure as per HESCOM CSR 25-26 11 KV system, Page No: 3, Sl No.: 08, Item.No.: 1.08 (Rs.10015 X 2 = 20030)
Double pole structure for 33kV (HESCOM CSR 25-26, 33 KV system, Page No: 69, Sl No.: 13, Item No.: 6.07 (Rs. 6139*1=6139) 2065
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370*2=8740) 8502
Erection of double pole structure using 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 35 of 50, Sl No: 34 Rs:4804) 3472
3 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Single pole of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Nos. 58 10015.00 580870.00 6403.00 371374.00
Supply of 9.5 Mtr long, 350 kg WL RCC for single pole (As per KPTCL SR- 2025-26, Page No- 2 of 50, SL.No-08) 3472
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370) 4875
Erection of 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 34 of 50, Sl No: 13, 35 of 50 Sl No.31, Rs:617+1416=2033)
4 PSCC Pole - 11 Mtr Long, 365 Kg WL for Intermediate Poles only as per REC Standards (HESCOM CSR25-26 11 KV System, Page No.: 3, SL No.: 9, Item No.: 1.09, Rs7913) Nos. 6 8526.00 51156.00 7187.00 43122.00
Concreting materials for 11 Mtr long, 365 kg WL PSC (HESCOM CSR 23-24, Page No: 8, Sl No.: 26 A(a),B(e) and C(a) (Rs.312+4058+312 =4682.00) 70.00 623.9669421
Digging of Pit 2.2 Mtr depth for errection of 11 Mtr long, 350 kg WL PSC pole (HESCOM CSR 2023-24, 11 KV Labour Page No.: 34 of 50 , Sl No.:13 Ordinary soil (Rs.673 ) 210.00 1510.743802
Erection of 11 Mtr long, 350 kg WL pole (HESCOM CSR 2023-2411 KV System, Page No.: 44, S.L No.:35 of 50, Item No.: 32 =1629) 12.00 1954.8
33KV M+3 type structure tower 14842.08 807.6
5 Design, Fabrication, galvanising and supply of Mild Steel tower materials including stubs and supply of 33KV M +3 Type Lattice Structure tower material ( MS) (As per KPTCL 2025-26 Page No.: 02,Sl No.16 2.092 MT/ Tower 4 nos. towers x 2.492 MT = 9.9680 MT) t 9.9680 106667 1063253.33 0.00 6.6280 9.96800 82456
6 Supplying of galvanized bolts & nuts (As per KPTCL SR- 2023-24 Page No.: 43, Sl No.18, Item No.: 18,3 ): 0.154 MT/Tower, for 4 Towers 0.154*4 = 0.616 MT Rs.142780,00/MT MT 0.6160 118983 73293.73 0.00 0.6160 0.6160
7 Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work size 2.4*2.4*3.2 Mtrs Each tower 18.432 CUM for 4 tower 4*18.432=73.7280 CUM (As per KPWD SR 2023-24, Volume-1 ,Page No -5, Item No-1.4.2) Rs-259,00 m3 73.728 0.00 215.83 15912.96 73.7280 6.6280 Earth work excavation for foundation of structures up to 3mtrs by mechanical means as per drawing and technical specification, including setting out, providing shoring, strultin and bracing removal of stumps and other deleterious matter 18.432
8 Providing and filling in foundation with granite/trap broken metal 100mm and down size and with approved sand including hand packing ramming, watering and compacting including cost material, labour and HOM etc.,completly ( 2.4*2.4*0.30=1.728 For 4 No.1.728*4=6.9120 CUM ) (As per KPWD SR 23-24, Volume-1 ,Page No -11, Item No-1,2,3 Rs-2682,00) CUM 6.9120 2235.00 15448.32 0.00 6.9120 4.60800 1.152
9 Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (KPWD SR 23-24, Volume-1 ,Page No -15, Item No-2,.1.2) Rs-5664,00 ( 2.4 M*2.4 M*0.20 M)1.152 CUM /Tower.For 4 towers Total =4*1.1520=4.6080 CUM m3 4.6080 0.00 4720.00 21749.76 4.6080 0.576
10 Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) KPWD SR 2023-24 Page No : 15 Item 2.2.1. Rs:6287) (2.4*2.4*0.45 M = 2.592)+(0.95*0.95*2.6 = 2.3465) Total = 4.9385 CUM 4.9385*4 = 19.7540 CUM ) Cum 19.7540 0.00 5239 103494.50 19.7540 19.75400 2.304
11 Providing Thermo-Mechanically Treated bars of grade Fe-550/550 D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (As per KPWD SR 2023-24 Page No.18 Item 2.11(h) Volume 1) Rs-79011, 4*0.0824=0.329.6) t 0.3296 65842.50 21701.69 0.00 0.3296 0.3296
12 Sorting of tower parts made of fabricated angle iron (As per KPTCL23-24 Part-II Labour , Page No.113, SL No. 1, Item No.: 1,1.(a) Rs.433,00) MT 9.9680 0.00 0.00 361 3596.79 2.4920
13 Setting of stubs templates and aligements (As per KPTCL SR 2023-24, Page No.: 113,Part-II Labour SL No. 1, Item No.: 1,1(b) Rs.705/-) Per loc 4 0.00 0.00 588 2350.00 1.0000
14 Assembling and errection of towers including tightening of bolts and nuts including loading,unloading at store and site (Including the Wt. of stubs).(As per KPTCL SR 2023-24, Page No.: 113,Part-II Labour SL No. 1, Item No.: 1,1(c) Rs.5723,00) MT 9.9680 0.00 0.00 4769 47539.05 2.4920 88798.56 29599.52
15 Rivetting of tower bolt ends by heating using dry- Acetylene gas and hammering to destroy threads so as to make the tower members theft - prrof (Bolts at nodal points only to be selected and rivetted up to hieght of bottom cross arm, as per the directions of the field engineer) KPTCL23-24, Page No.: 113,Part-II Labour SL No. 1, Item No.: 1,1(d) Rs.22,00 Per Bolt 0 0.00 0.00 18 0.00 0.0000 41259.51 13753.16889
16 Welding of bolts and nuts (As per KPTCL SR 2023-24, Page No.: 113,Part-II Labour SL No. 1, Item No.: 1,1(e) Rs.22,00( 4 Nos Tower 487 Bolts Per tower 4X487=1948 bolts) Per Bolt 1948 0.00 0.00 18 35713.33 487.0000 1948 79322.84 26440.94667
17 Grounding of towers including cost of 40 mm dia 2.5 mm thick, class 'C' G.I. Pipe of 3 metres length as per specification with 50 X 6 mm GI Flats 3 meter long, salt, charcoal, including excavation charges (As per KPTCL SR 2023-24, Page No.: 115,Part-II Labour SL No. 6, Item No.: a, Material Rs,5224,00 + Labour Rs,2111/-) Set 8 4353 34826.67 1759 14073.33 2.0000
20 Erection of 9.5 Mtr long, 350 kg WL RCC pole for stud HESCOM (HESCOM 2023-24 Page No 34 of 50, Sl No: 13, 35 of 50 Sl No.31, Rs:617+1416=2033) Nos. 15 10015.00 150225.00 1977 29650.00 3.7500 TP 3.00 12.00 18.00 9
21 LT 2 Pin Cross Arm - MS(Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) (As per KPTCL SR- 2025-26, Page No- 91 Nos. 30 290.00 8700.00 143.00 4290.00
23 Supply and fixing of Horizantal cross arms for 33 KV using pole clamps, bolts and nuts etc., for 9.5 Mtr long, 350 kg WL RCC (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-15 & 16 And 36 of 50 Sl No: 50) 2045+99= Set 64 2144.00 137216.00 228.00 14592.00 16.0000 0.14 #VALUE! 4.00 12.00 0.28
24 Supply and fixing of top supports for 33 KV line with clamps, bolts and nuts etc; for I beams (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-16) Set 64 376.00 24064.00 0.00 0.00 64.00 192.00
25 33 kV Polymer Pin Insulator (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-11) Nos. 228 756.00 172368.00 0.00 0.00 3.00 12.00 628
26 33 kV 70 KN Polymer Insulator (Ball & socket type) (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-12) Nos. 72 390.00 28080.00 0.00 0.00 36.00 628 231
27 33 KV Guy Set with (includes Anchor Rod, Turn buckle, Guy wire, 2 nos. of No.15 Strain Insulator, Guy clamp with Bolts, Nuts and Washers) Set 30 1024 30725.00 530.00 15900.00 85.0000 18.00 4.00 0
28 Guy concreting with Boulders, Mud & Sand (300x300x450 mm) (As per KPTCL SR- 2023-24, Page No- 3 of 50 SL.No-41, 3 of 50 SL N. 42,39, 4 of 50 Sl No. 54 , 60 ) 205+197+71+49+505.3 Labour charges 292+237=529 Page No 34 of 50 & 36 fo 50 Sl No. 25& 58 resply) Set 30 1208 36240.00 530.00 15900.00 18.00
29 Spiral Earth electrode (As per KPTCL SR- 2025-26, Page No- 3 of 50 SL.No-26) Labour 35 of 50 Sl No. 36 set 85 199.00 16915.00 83.00 7055.00 21.2500 12.00 12.00 6.00 3.00 18
30 Supplying and Providing of Pipe type Earthing consisting of Class "C" GI Pipe of 3mtr long, 40mm dia, 2.5mm thick, with Clamp, Bolt & Nuts, GI Wire / 50 x 6mm GI flat of 3mtrs long, Charcoal,salt, including earth excavation, re-filling as per KPTCL 23-24, page no: 115, Sl.No.: 6a, Rs. 5224+2111/- Set 18 4353.33 78360.00 1759.17 31665.00 4.5000 58.00 58.00 58.00 3.00 174 678
31 G I Bolt & Nuts of required various size HESCOM CSR 23-24, KPTCL, Page No.: 43, Sl.No.:18.3, Rs. 142780/MT MT 0.100 118983.33 11898.33 0.00 0.00 0.0250 6.00 6.00 6.00 3.00 18
32 Guarding for road crossing HESCOM SR 23-24,11KV System, Page No.: 4, Sl. No. 30, item No:4.03, Rs. 93/-X 40 Mtr = 3720/- and labour 1034/- Span 5 3120.00 15600.00 921.00 4605.00 1.2500 210 3920
33 Strain Clamp for Coyote to Coyote, (HESCOM 2023-24, 11KV System Page No.: 3 of 50, Sl. No.: 46, Nos. 72 589 42420.00 0.00 0.00 18.0000 8.75
34 Mid span compression joints for coyote, KPTCL SR 23-24, Page No.: 64, Sl. No.: 41.5.2, Item No.: 8538, Rs. 474 Nos. 6 395.00 2370.00 0.00 0.00 1.5000 85.00 8.75
35 Anticlimbing Device GI Barbed wire (12 Mtr/Kg) HESCOM SR 23-24,11KV System, Page No.: 4, Sl. No. 29, item No:4.02, Rs. 89/- and labour 42/- Nos. 85 152.00 12920.00 143.00 12155.00 21.2500 8.75
36 Caution/Danger Board HESCOM SR 23-24,11KV System, Page No.:32, Sl. No. 593, item No:68.17, Rs. 150/- and labour Page. No/: 45, Sl. No.: 63, Item No.: 5.15, Rs. 80/- Nos. 13 131.00 1703.00 71.00 923.00 3.2500 8.75
37 Number plates with pole clamps Bolt & nuts KPTCL SR 23-24, page No-43, Sl.No: 19.2, Rs.318/- and labour Page. No/: 113, Sl. No.: 3, Item No.: b, Rs. 80/- Nos. 77 265.00 20405.00 71.00 5467.00 19.2500 77.00 8.75
38 Phase plates (set of 6 per tower) KPTCL SR 23-24, page No-43, Sl.No: 19.1 Rs:528 labour Page. No/: 113, Sl. No.: 3, Item No.:d, Rs. 238/- Set (6 Nos) 13 440.00 5720.00 198.33 2578.33 3.2500 13.00 8.75
39 PG Clamp for Coyote to Coyote, HESCOM SR 23-24, 11KV System Page No.: 6, Sl. No.: 64, Item No.: 9.01, Rs. 357/- Nos. 72 333.00 23976.00 0.00 0.00 18.0000 8.75
40 Preliminary survey: Preliminary surveyfor identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, inall types of terrain. (KPTCL SR 23-24, Page No.: 153, Sl. No.: 1,) Km 3 0.00 0.00 3025 9075.00 0.7500
41 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipment like DGPS/Total Stations/Digital Theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work using PLS-CADD software in all types of terrains and includes the following: (KPTCL SR 23-24, Page No.: 153, Sl. No.: 2,) Km 3 0.00 0.00 12201 36602.50 0.7500
42 Check survey to be conducted during construction stage: Conducting detailed check survey along the approved route duly following the route alignment, GPS Co-ordinates, submission of detailed line schedule, tower schedule, land schedule and comparing the same with respect to detailed survey report, bringing out the differences if any. Submission of contour maps for undulated/hilly tower. The work also includes marking corridor width in the field and computing the quantum of benching and revetment, preparation of detailed land schedule along the corridor on the digitized Revenue village maps indicating the Sy. Nos. falling within the corridor for the purpose of estimation of the land compensation, submission of detailed consolidated hard copy of reports of check survey in 6 sets along with soft copy for approval in all types of terrain per km (KPTCL SR 23-24, Page No.: 155, Sl. No.: 3,) Kms 3 0.00 0.00 2218 6655.00 0.7500
Part-B 33KV Line breaker material estimate
66KV SF-6/ VCB Breakers
a) 66 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi-pneumatic/pneumatic type operating mechanism and mounting structure etc., as per technical specification. (As per KPTCL SR- 2023-24, Page No- 14, SL.No-278 Nos 1 645000 645000.00 0.00
a) 33KV SF-6/ VCB Breakers: Breaker Erection, assembly, alignment & wiring of breakers with its connected equipments including movement from the point of unloading to the point of erection. (KPTCL CSR 23-24, Labour, Page No: 117, Sl No.: 13 a) No 1 0.00 4945.00 4945.00
b) Assisting in Testing & Commissioning: (KPTCL CSR 23-24, Labour, Page No: 117, Sl No.: 13 b) No 1 0.00 1615.00 1615.00
c) Wiring : Identification, Ferruling crimping and termination of wires in Breaker & Wiring up to control panel/Relay panels.(KPTCL CSR 23-24, Labour, Page No: 117, Sl No.: 13 c) No 1 0.00 7072.50 7072.50
33 KV Current Transformers 0.00 0.00 0.00
a) Erection of CTs and wiring including movement from the point of unloading to the point of erection. (KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 a) set 1 0.00 1832.50 1832.50
b) Assisting in Testing & Commissioning: (KPTCL CSR 23-24, Labour, Page No: 118, Sl No.: 14 b) set 1 0.00 640.00 640.00
33 KV Isolators : 0.00 0.00
33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators 0.00 0.00
a Upright mounting type without earth switch (KPTCL SR-2023-24, Page No:37, Item No:9.14.2) Nos 1 58483.3 58483.33 0.00
b) 33 kV, 800 A, 25 kA Upright with Earth Switch complete metallic portion with insulator (KPTCL SR-2023-24, Page No:37, Item No:9.14.1) RS:84700 Nos 1 70583.3 70583.33 0.00
Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection (33 KV) (KPTCL CSR 23-24, Labour, Page No: 119, Sl No.: 18) Set 1 0.0 0.00 278 277.50
Erection of Isolators (33 KV) Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection.(Upright type) ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 a(i)) Nos 1 0.0 0.00 1099 1099.17
Assisting in Testing and Commissioning ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 E(i) , ) Nos 1 0.0 0.00 159 159.17
Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00 0.00
a) 30 kV Metal Oxide with surge counter Arrestor class : Discharge Class 2 (Station Low Duty (SL)- for Overhead Line (KPTCL SR-2025-26, Page No:34, Item No:8.8, Rs:4840) . Nos 3 11583.00 34749.00 0.00
Conductors 0.00 0.00
a) "Coyote" ACSR Conductor (KPTCL 23-24, Page No.:44, SL No.:20.6. Rs:139) Meter 100 135.35 13535.30 0.00
Control Cable with Accessories: (With glands/lugs/ferruels) 0.00 0.00
a) 19 Core 2.5 Sq.mm (KPTCL SR-2023-24, Page No:40, Item No:13.16, Rs:525/-) Meter 80 590.83 47266.40 13.00 1040.00
b) 4 Core 6 Sq.mm (KPTCL SR-2023-24, Page No:40, Item No:13.8, Rs:247/-) Meter 250 205.83 51458.25 13.00 3250.00
c) 2 core 2.5 Sq.mm (KPTCL SR-2023-24, Page No:40, Item No:13.1, Rs:94/-) Meter 130 92.50 12025.00 13.00 1690.00
Mounting Structures: 0.00 0.00
Mounting Structures for equipments made out of fabricated galvanised angle of High tensile steel for GOS / CT's / PT's / LA's / NCT / HI PI etc as per approved drawing 0.00 0.00
a) 33KV Isolators - 0.248 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.248MT=36909.84) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 2 27280.00 54560.00 0.00
b) 33KV Current Trasformers - 0.152 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.152MT=22622.16) Nos 3 16720.00 50160.00 0.00
c) 33KV Lightning Arrestors - 0.075 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.075MT=11162.25) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 3 8250.00 24750.00 0.00
Control and relay panels Simplex type as per technical specifications (Control Voltage 110V DC) 0.00 0.00
a 110 V DC Simplex type 33 kV Panel for Overhead Line (KPTCL SR-2023-24, Page No:41, Item No:16.2.8. Rs:214170 ). panel 1 178475.00 178475.00 0.00
a) Control Panels : Erection of control panel, auxilary panel, carrier cabinet etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection.( KPTCL CSR 23-24, Labour, Pg No: 120, Sl No.: 23 a , ) Nos. 1 0.00 3492.50 3492.50
b) Wiring & Assisting in Testing & Commissioning .( KPTCL CSR 23-24, Labour, Pg No: 120, Sl No.: 23 b , ) Nos. 1 0.00 6343.33 6343.33
33KV ODS Structures 0.00 0.00 0.00
a) RCC Pole - 9 Mtr Long, 145 Kg WL (As per KPTCL SR- 2023-24, Page No- 2 of 50, SL.No-08) Nos 1 6276.00 6276.00 1551.67 1551.67
b) 11KV ODS mounting structure using 50 x 100 x 50 x 6 mm C channel MS, each 4.0 mtr long , As per PWD Electrical Page 19 Sl.No-5.41.4 Rs-Per Mtr-756.00 3NosX4Mtr=12 Mtr Mtr 27 630.00 17010.00 0.00 0.00
c) Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for G.O.S. LAs etc. ( KPTCL CSR 23-24, Labour, Page No: 116, Sl No.: 8 b) MT 1.12 0.00 4769.17 5341.47
d Formation of cross bus in each individual bay using Lynx/Coyote - Single/Double conductor with fixing of insulators, spacers, levelling the string conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus. ( KPTCL CSR 23-24, Labour, Page No: 122, Sl No.: 25) Per bay 1 0.00 6136.67 6136.67
Insulators & Hardware materials: 0.00 0.00
a) Pad clamp for Coyote ACSR (KPTCL SR-2023-24, Sl.No:77, Item No:10.09, Rs:725) Nos 18 734.00 13212.00 0.00
b) T clamp for Coyotte ACSR (KPTCL SR-2023-24, Page No:69, Item No:47.7.11, Rs:509.00) Nos 6 426.00 2556.00 0.00
c) 33 KV CT bimetalic clamps for Coyote ACSR (Aprox market rate) Nos 6 700.00 4200.00 0.00
d 33KV CT marshalling box (Aprox market rate) Nos 1 20000.00 20000.00 0.00
Ground Mat & Earthing : 0.00 0.00
a) Grounding of equipment by providing cast iron pipe of 100mm ID 13mm thick, 2.75Mtr long wih 2part clamps out of GI flat 50/6 mm continously welded alround the pipe using cast iron welding electrodes as per drawing (al materials to be supplied by contractors) ( KPTCL CSR 23-24, Labour, Page No: 115, Sl No.: 6c, Rs:12792) , Set 7 10635.00 74445.00 2909 20364.17
b) Supplying & providing 450mm dia 450mm hieght 1.5" - 2" thick hume pipe coller ( non PR type) fop earth quits including all lead & lift. ( KPTCL CSR 23-24, Labour, Page No: 124, Sl No.: 26i, Rs:1499) , each 7 1249.17 8744.17 0.00
c) Grounding of equipment with 50/6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of earthinh with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor ( KPTCL CSR 23-24, Labour, Page No: 123, Sl No.: 26f, Rs:335) , Rmt 100 279.17 27916.67 0.00
a) Bolt & Nut as per IS-1367 GI (HESCOM SR-2023-24, Sl.No:494 to 504, item no:61.12 to 61.22, RS:132571 for MT) MT 0.100 110475.83 11047.58 0.00
Total cost 1597873.03 66850.63
Grand Total Cost 5781119.29 1114430.52
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED.
HTVR & Annual energy loss calculation of existing S/C 33 KV Koligudd feeder eminating from 110\33\11 KV MUSS Hidakal.
Node No KVA at node CUM KVA Distance KM KVA-KM Conductor constant ohm/kms KVA-KM Conductor constant
1. Total connected load P= 15000
2. Total length in Km. L= 15
3. Sum of moments= KVA*KM= 225000
4. LDF= P*L/ KVA*KM 1.00 Total
5. Annual energy sent out of the feeder 27734800 1 Aug-22 180 1308400
7. Diversity factor= Total connected load in KVA/1.73*33*Peak load 1.17 3 Oct-22 80 850400
8. Load factor = Annual energy sent out on the feeder/ Energy computed on the basis of the peak load= Annual energy sent out/ 1.73*33*0.8*8760*peak load 0.31 4 Nov-22 105 1974800
9. Loss load factor(LLF) =0.30*LF+.70*LF*LF) 0.16 7 Feb-23 180 2727200
10.Load density factor= 1 8 Mar-23 192 3199600
11. Annual energy losses= 0.105*P*P*L*R*LLF/2*LDF*DF*DF 5106482.48 9 Apr-23 200 3199600 Aprox
Resistance of the conductor in Ohms per KM= 0.248 10 May-23 3199600 Aprox 48228800
12. Add 10% spur line loss= Annual energy loss*0.1= 0.00 12 Jul-23 224 2588800
13. Total loss = 5106482.48 Total 27734800
14. HTVR calculation
Asst. Executive Engineer(El), Junior Engineer(El)
33 KV S & L Sub-Division, HESCOM, Athani 33KV line maintenance Raibag
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED.
HTVR & Annual energy loss calculation of proposed 33 KV S/C Koligudd link line from 110/33/11 KV MUSS Sankratti after providing 33 KV S/C link line from 110/33/11 KV MUSS Sankratti.
Node No KVA at node CUM KVA Distance KM KVA-KM Conductor constant ohm/kms KVA-KM Conductor constant
1. Total connected load P= 15000
2. Total length in Km. L= 3
3. Sum of moments= KVA*KM= 45000
4. LDF= P*L/ KVA*KM 1.00
5. Annual energy sent out of the feeder 27734800
6. Peak load = 224
7. Diversity factor= Total connected load in KVA/1.73*33*Peak load 1.17
8. Load factor = Annual energy sent out on the feeder/ Energy computed on the basis of the peak load= Annual energy sent out/ 1.73*33*0.8*8760*peak load 0.31
9. Loss load factor(LLF) =0.30*LF+.70*LF*LF) 0.16
10.Load density factor= 1
11. Annual energy losses= 0.105*P*P*L*R*LLF/2*LDF*DF*DF 1021296.50
Resistance of the conductor in Ohms per KM= 0.248
12. Add 10% spur line loss= Annual energy loss*0.1= 0.00
13. Total loss = 1021296.50
14. HTVR calculation
Calculation of Energy Savings
1 HTVR & Annual energy loss calculation of existing S/C 33 KV Koligudd feeder eminating from 110\33\11 KV MUSS Hidakal. 5106482.48
2 HTVR & Annual energy loss calculation of proposed 33 KV S/C Koligudd link line from 110/33/11 KV MUSS Sankratti after providing 33 KV S/C link line from 110/33/11 KV MUSS Sankratti. 1021296.50
Therefore Annual Energy Savings in Units = 1-2 4085185.98 4.085185982
Cost Banefit ratio=Energy Saving x 8.35
Cost of Estimate
Asst. Executive Engineer(Ele) Junior Engineer(Ele)
33 KV S & L Sub-Division, HESCOM, Athani 33KV line maintenance Raibag
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Sankratti to the existing 33/11 KV MUSS Koligudda for a distance of 3 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
Prop 9.5Mtr RCC Pole for line=58 No's 58
Prop 9.5Mtr RCC DP sets =6No's 64
Prop M+3 Towers =4No's
Prop 9.5Mtr RCC TP sets =3No's
Prop 11Mtr PSC pole =6No's
Asst, Executive Engineer(Ele) Junior Engineer (Ele)
33KV S&L Sub-Division, HESCOM,Athani 33KV line maintenance Raibag
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Sankratti to the existing 33/11 KV MUSS Koligudda for a distance of 3 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
PART-D-(CIVIL WORKS)
Sl No. Item Description Unit Qty Unit Price (Rs) Total Price (Rs)
SCHEDULE OF ITEMS FOR ASSOCIATED CIVIL WORKS AND STRUCTURES:
1 Foundations: Engineering, supply of all labour,material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grouting underpinning etc ,for the following works
a) 9 mtrs long RCC poles for ODS (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.3434,Coping Rs.312) Nos 1 2818 2818
b) 33KV CT support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 3955 11865
c) 33KV Surge arrestor support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 3955 11865
d) 33KV Isolators support structure(0.95 mtr X 0.45 mtr X 1mtrDepth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Set 2 3955 7910
2 a) SF-6 Breaker foundation, 33KV SF-6 Breaker foundation as per approved design and drawing including supply of material and labour L/S 1 18611 18611
3 Providing, laying and jointing PVC pipes conforming to IS 4085-1960 and approved makes with necessary specials such as collars, bends, elbows, Tee, Nipples, plugs etc., complete, whereever necessary as per the directions of the Field Engineer. 0 0
a) PVC pipes 63mm dia., 6 kg/sqcm & class 3 Mtrs 10 112 1118
b) PVC pipes 75mm dia., 6 kg/sqcm & class 3 Mtrs 10 153 1528
4 Earth mat formation : 0 0
a) Excavation, formation, refilling. CMT 50 140 7014
5 Cable Trenches including road crossing : 0 0
a) Providing and Laying RCC Hume pipe sub ducts using NP 2 class 300mm dia Hume pipe including cost of Excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmtrs 10 592 5924
Total cost 68651.39
ÌÐÔ½ñÏü Á·ÐÔô³ý ÊФн¤Ñ¡Ô ‘Ðo»Ðº ºo¦ÐÔÁԳРHubli Electricity Supply Company Ltd
ÊÐÌÑo¦ÐÔ‘Ð ‘Ño¦ÐÔþºÀÑþÌБРƒ¿°o¦ÐÔo³Ð¤Ð¤ÐÔ(Á) Office of the
ŠÊý ÀÐÔ³ÐÔê ŠÄý ‡»Ð Á¾°Ñ–Ð, Asst.Executive Engineer (Ele)
ÌÐÔ.Á.ÊÐ.‘Ð.º. ƒµÐ±Ò. 33KV S&L Sub-Divn. Athani
No.ATN/AEE/33KV/S&L/24-25/ Date:
The Executive Engineer Ele,
33KV S&L Division,
HESCOM,Belagavi.
Sub: Submission of Estimates for Sanction.
With reference to the above subject, I am herewith submitting the following estimates for your kind sanction.
Sl.No Name of the work Cost of the estimate
1 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Koligudd for a distance of 3 Kms using coyote ACSR for providing second source along with incomming 33KV line breaker at existing 33/11 KV MUSS Koligudd in O&M Division, HESOM, Raibag, Taluk: Raibag, Dist: Belagavi, on Total Turn Key basis. 8077518.00
Total 8077518.00
Yours faithfully
Asstistant Executive Engineer Ele,
33KV S&L Sub-Division HESCOM
ÌÐÔ½ñÏü Á·ÐÔô³ý ÊФн¤Ñ¡Ô ‘Ðo»Ðº ºo¦ÐÔÁԳРHubli Electricity Supply Company Ltd
ÊÐÌÑo¦ÐÔ‘Ð ‘Ño¦ÐÔþºÀÑþÌБРƒ¿°o¦ÐÔo³Ð¤Ð¤ÐÔ(Á) Office of the
ŠÊý ÀÐÔ³ÐÔê ŠÄý ‡»Ð Á¾°Ñ–Ð, Asst.Executive Engineer (Ele)
ÌÐÔ.Á.ÊÐ.‘Ð.º. ƒµÐ±Ò. 33KV S&L Sub-Divn. Athani
No.ATN/AEE/33KV/S&L/24-25/ Date:
The Executive Engineer Ele,
33KV S&L Division,
HESCOM,Belagavi.
Sub: Submission of Estimates for Sanction.
With reference to the above subject, I am herewith submitting the following estimates for your kind sanction.
Sl.No Name of the work Cost of the estimate
1 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Koligudd for a distance of 3 Kms using coyote ACSR for providing second source along with incomming 33KV line breaker at existing 33/11 KV MUSS Koligudd in O&M Division, HESOM, Raibag, Taluk: Raibag, Dist: Belagavi, on Total Turn Key basis. 8077518.00
Total 8077518.00
Yours faithfully
Asstistant Executive Engineer Ele,
33KV S&L Sub-Division HESCOM
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
8 technical specification.doc
Others - 8 technical specification • 0.58 MB
3 section ii ITB INDENT 1219 call 2.doc
Others - 3 section ii ITB INDENT 1219 call 2 • 0.11 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
9 tender capacity.xlsx
Others - 9 tender capacity • 0.01 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
1 NIT INDENT 1219 call 2.doc
Others - 1 NIT INDENT 1219 call 2 • 0.14 MB
6 section v SCC INDENT 1219 call 2.doc
Others - 6 section v SCC INDENT 1219 call 2 • 0.12 MB
10-format-i- work done.xls
Others - 10-format-i- work done • 0.03 MB
2 section i IFB INDENT 1219 call 2.doc
Others - 2 section i IFB INDENT 1219 call 2 • 1.41 MB
11 33KV line Koligudd.xlsx
Others - 11 33KV line Koligudd • 1.18 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
4 section iii GCC INDENT 1219 call 2.doc
Others - 4 section iii GCC INDENT 1219 call 2 • 0.14 MB
5 section iv ECC INDENT 1219 call 2.doc
Others - 5 section iv ECC INDENT 1219 call 2 • 0.09 MB
7 Annexures.doc
Others - 7 Annexures • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .