| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAccepted-AOC C 101 ADG P CHENNAI | L1 | Accepted-AOC BEING L1 BIDDER | |
| 2 | L2₹36.5 L+₹2.9 L (8.74%)Rejected-Finance H NO 111 553 64 CATTLE POUND TOWARDS AVA HILL CAMP ROAD ARUVANKADU NILGIRIS DIST TAMIL NADU 643 202 | THE NILGIRIS | TAMIL NADU | 643202 | L2 | Rejected-Finance BEING NOT L1 BIDDER | |
| 3 | L2₹39.0 L+₹5.4 L (16.2%)Rejected-Finance 109 D ALLAI SALT COMPOUND OLD LAKSHMI THEATRE KRISHNAPURAM COONOOR 643102 THE NILGIRIS | COONOOR | THE NILGIRIS | TAMIL NADU | 643102 | L2 | Rejected-Finance BEING NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | sree devi construction L2 | K.AYYAPPAN L3 | ACE PROMOTERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling boarding,etc any description, fixed in any position with nails etc inluding iron/SS mongeries if any complete all as specified and directed. | 180 | Sqm | 60 ₹10,800 | 65 ₹11,700 | 55 ₹9,900 Lowest |
| 2.00 | Demolition of Concrete of any description and in any position not otherwise specifically provided for floor(other than above ground level),sunken floor etc all as diercted. | 5 | Cum | 1,500 ₹7,500 | 1,200 ₹6,000 Lowest | 1,450 ₹7,250 |
| 3.00 | Demolition of cement concrete (reinforced ) (below or above ground level) and removing debris off the site complete all as specified and as directed. | 1.5 | Cum | 800 ₹1,200 Lowest | 2,500 ₹3,750 | 1,810 ₹2,715 |
| 4.00 | Demolition for brickwork or stone masonry laid with cement mortar or cement lime mortar | 2 | Cum | 800 ₹1,600 | 650 ₹1,300 | 590 ₹1,180 Lowest |
| 5.00 | Taking down cement or cement lime plaster of any description on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and as directed. | 50 | Sqm | 65 ₹3,250 Lowest | 65 ₹3,250 Lowest | 83 ₹4,150 |
| 6.00 | Taking down chowkats or frames including shutters (without taking off shutters from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 10 | Each | 150 ₹1,500 | 550 ₹5,500 | 100 ₹1,000 Lowest |
| 7.00 | Taking down chowkats or frames including shutters (without taking off shutters from the frames) exceeding 1.50 Sqm and not exceeding 4 Sqm each, complete all as specified and directed. | 5 | Each | 150 ₹750 Lowest | 650 ₹3,250 | 200 ₹1,000 |
| 8.00 | Taking down steel tubing and connections of 15 mm bore including cleaning for refixing or removal to store complete all as specified and as directed. | 50 | RM | 55 ₹2,750 | 35 ₹1,750 Lowest | 100 ₹5,000 |
| 9.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 80 | Sqm | 55 ₹4,400 Lowest | 90 ₹7,200 | 83 ₹6,640 |
| 10.00 | Dismantling Stone slabs and tiles of any description or thickness in floors,sill,and platform etc complete all as directed. | 0.1 | 10Sqm | 550 ₹55 Lowest | 650 ₹65 | 730 ₹73 |
Tender Value
₹31.7 L
EMD Value
₹63,400
Closing Date
16 Apr 2026, 6:00 pmClosed
Shri Pawan Kumar Goswami, EE, GE DSSC
BARRACKS-POST, WELLINGTON, THE NILGIRIS, TAMIL NADU, PIN-643231
IMPROVEMENT OF KITCHEN CABINETS OF CERTAIN OFFRS MD ACCN AND SPECIAL REPAIRS TO FLOORING AND AWNING OF CERTAIN BUS SHELTERS AT DSSC WELLINGTON
2026_MES_757914_1
8559/E8
Open Tender
Civil Works
Item Rate
270 days
WELLINGTON
PLEASE REFER TENDER DOCUMENTS AND NIT
8 documents required · 8 mandatory
₹500
GE DSSC WELLINGTON
₹63,400
Yes
17 Jun 2026
26 Mar 2026
23 Apr 2026
26 Mar 2026
16 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling boarding,etc any description, fixed in any position with nails etc inluding iron/SS mongeries if any complete all as specified and directed. | - | Sqm | - | - |
| - | Demolition of Concrete of any description and in any position not otherwise specifically provided for floor(other than above ground level),sunken floor etc all as diercted. | - | Cum | - | - |
| - | Demolition of cement concrete (reinforced ) (below or above ground level) and removing debris off the site complete all as specified and as directed. | - | Cum | - | - |
| - | Demolition for brickwork or stone masonry laid with cement mortar or cement lime mortar | - | Cum | - | - |
| - | Taking down cement or cement lime plaster of any description on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and as directed. | - | Sqm | - | - |
| - | Taking down chowkats or frames including shutters (without taking off shutters from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | - | Each | - | - |
| - | Taking down chowkats or frames including shutters (without taking off shutters from the frames) exceeding 1.50 Sqm and not exceeding 4 Sqm each, complete all as specified and directed. | - | Each | - | - |
| - | Taking down steel tubing and connections of 15 mm bore including cleaning for refixing or removal to store complete all as specified and as directed. | - | RM | - | - |
| - | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | - | Sqm | - | - |
| - | Dismantling Stone slabs and tiles of any description or thickness in floors,sill,and platform etc complete all as directed. | - | 10Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_848949.xls
BOQ • 0.44 MB
8559Tender.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .