| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance R O HARI OM BHAWAN NEW TOTU SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | +3.90% | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.0 Cr+₹5.3 L (1.06%)Admitted-Finance | +5.00% | ₹5.0 Cr+₹5.3 L (1.06%) | L2 | Admitted-Finance |
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
9 Aug 2026, 6:55 pmClosed
Executive Engineer
Karchham Division HP.PWD Bhabanagar
C.O Police station building at Tapri SH. C.O building portion WS.SI septic tank Rain Water Harvesting Tank and protection wall etc.
2026_PWD_140304_1
3604 dated 31.07.2026
Open Tender
Civil Works - Buildings
Percentage
540 days
Tapri
Please refer Tender documents.
11 documents required · 11 mandatory
₹7,000
₹9.6 L
19 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
9 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches in earth work in all height and depths in all kinds of soil, including saturated soils comparising of pick work, jumper work, blasting work both in soft and hard rock with chiselling and wedging out of rock ( where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site., according to the HP.PWD specification of 1990 (One thousand nine hundred ninety) volume-I (One) and sorting out useful and unuseful material and transportation of the unuseful material for disposing off to dumping site (to be arranged by the contractor) as per satisfaction of Engineer-in-charge through all modes of transporation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineris, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be absolute responsibility of the contractor which shall have to be duly compensated by him in all respects including all incidental charges. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 604.82 | Per cubic meter | 331.22 | ₹2,00,328.48 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 51.45 | Per cubic meter | 2,135.5 | ₹1,09,871.48 |
| 3 | Stone filling under floor dry hand packed with hard stone of approved quality consolidated properly with hand or mechanical rammer or by hand durmoot to required level as per HPPWD specification 1990 (One thousand Nine hundred Ninety) volume-I including carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 52.45 | Per cubic meter | 824.25 | ₹43,231.91 |
| 4 | Providing and laying in position cement concrete of 1:2:4 (One cement : Two coarse sand) : four graded stone aggregate 20 mm (Twenty millimetre) nominal size for all work up to plinth level excluding the cost of centering and shuttering, finishing and reinforcement including curing complete and carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2.25 | Per cubic meter | 8,148 | ₹18,333 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:3:6 (one cement : three coarse sand : six graded stone aggregate) 20mm ( twenty millimetre) nominal size graded stone aggregate upto plinth level including curring complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 17.25 | Per cubic meter | 7,201 | ₹1,24,217.25 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level including curring complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 59.78 | Per cubic meter | 6,581.8 | ₹3,93,460 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:5:10(one cement : five coarse sand : ten graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level including curring complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 29.89 | Per cubic meter | 6,165.85 | ₹1,84,297.26 |
| 8 | Providing and laying damp-proof course 50mm ( fifty millimetre) thick with cement concrete 1:2:4 ( one cement : two coarse sand : four graded stone aggregate 20mm ( twenty millimeter) nominal size including curing complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 95.31 | Per square meter | 494.8 | ₹47,159.39 |
| 9 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 (Ten) of approved quality using 1.7 kg ( one point seven kilogram ) per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 95.31 | Per square meter | 151.8 | ₹14,468.06 |
| 10 | Random rubble masonry / polygonal uncoursed/ brought to courses with hard stones of approved quality in superstructure above plinth level upto all floor level including leveling up with cement concrete 1:6:12 ( one cement: six coarse sand : twelve graded crushed stone aggregate ) 20mm ( twenty milimetre ) nominal size at window sills, ceiling level and the like at plinth level in cement mortar 1:6 ( one cement: six coarse sand ) including curring complete in the carriage of material, labour, tool and plants through all modes of transporation within all leads and lifts as per PWD specification and as per direction of the Engineer-in-charge. including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 16.9 | Per cubic meter | 6,970.4 | ₹1,17,799.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_208110.xls
BOQ • 0.52 MB
SBD.pdf
Tender Documents • 4.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .