| 1 | L1₹61.8 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹64.2 L+₹2.5 L (3.97%)Rejected-Finance 95 PAVALI ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | L2 | Rejected-Finance Committee Decision |
Tender Value
₹63.7 L
EMD Value
₹64,000
Closing Date
18 Feb 2020, 3:00 pmClosed
Projexct Director,DRDA,Virudhunagar
DRDA, Collectorate, Virudhunagar
Renovation of Ponds/Ooranies-26 nos.-Kudimaramathu-under District Panchayat and Panchayat Union SFC during 2019-20 in Package no.X at Virudhunagar Block of Virudhunagar District
2020_RDTN_156437_10
C6/308/2020 Dated 31.01.2020
Open Tender
Civil Works - Others
Works
120 days
Virudhunagar Block
Two Cover System.
Refer Tender Document.
5 documents required · 5 mandatory
₹0
₹64,000
DRDA, Collectorate, Virudhunagar
19 Nov 2020
3 Feb 2020
18 Feb 2020
3 Feb 2020
18 Feb 2020
13 Feb 2020
13 Feb 2020
Amount
Part-1:- Renovation of Saminaickkar Ooruni at Chinnavadi Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete.
Part-2:- Renovation of Ondipulinaickanoor West Ooruni at Ondipulinaickanoor Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-3:- Renovation of Ondipulinaickanoor Main Ooruni at Ondipulinaickanoor Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-4:- Renovation of Ondipulinaickanoor Vadakku Ooruni at Ondipulinaickanoor Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete having width of 3m -10m
Part-5:- Renovation of Karuppanasari patti Oorani at Thulukkapatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Part-6:- Renovation of Alwar reddi Oorani at Appaianaickenpatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-7:- Renovation of Kali Koil Oorani at Veerarpatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-8:- Renovation of Pottal Oorani at Pattampudhur Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete having width of 3m -10m
Part-9:- Renovation of New Odai Oorani at Pattampudhur Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete having width of 3m -10m
Part-10:- Renovation of Kattapuli Oorani at Kottaiyur Village
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-11:- Renovation of Vengala Naickenpatti Oorani at Chinnavadi Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete.
Part-12:- Renovation of Ramalingapuram Oorani at Chinnavadi Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-13:- Renovation of Thammanaickenpatti Oorani at Thammanaickenpatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Part-14:- Renovation of Nattarmangalam Vasuki Ooruni at Amathur Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-15:- Renovation of Kuttai Ooruni & Construciton of Bathing Ghat at Gurumoorthinaickenpatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-16:- Renovation of Mayana Ooruni at Maruthanatham Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-17:- Renovation of Dhadhan Ooruni at Sengottai Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-18:- Renovation of New Ooruni & Construciton of Bathing Ghatat Sengottai Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-19:- Renovation of Sudukattu Ooruni & Construciton of Bathing Ghat at Kooraikundu Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-20:- Renovation of Ondipulinaickanoor Ooruni & Construciton of Bathing Ghat at Ondipulinaickanoor Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-21:- Renovation of Nandhireddiapatti Oorani at Sivagnanapuram Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-22:- Renovation of Thulukkapatti Oorani at Thulukkapatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-23:- Renovation of Periya Oorani & Construciton of Bathing Ghat at Nallamanaickenpatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Gravel packing for rivetment including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Rough stone dry packing for apron ad revetments including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-24:- Renovation of Kalaperumalpatti Oorani & Construciton of Bathing Ghat at Sandhaiyur Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
having width upto 3m
having width of 3m -10m
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-25:- Renovation of Piravipatti Oorani at Nallanchettipatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Part-26:- Renovation of West Oorani at Nallanchettipatti Village
Clearing the Light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Construction of Bathing Ghat
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
GST Amount for providing Service to the above Government Contract Works in Part:- 1 to 13 (@ 5% of the work value)
GST Amount for providing Service to the above Government Contract Works in Part:- 14 to 26 (@ 12% of the work value)
GMARIAPPANANDCO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .