| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC NAMAKKAL | ₹27.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹27.7 LRejected-AOC | ₹27.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ARJ CONSTRUCTION L2 | SRM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Construction of Cement Concrete Check dam at Kolakkamedu H/O Unanthanagalat Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026 | |||||
| 2.00 | Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation as per S.S 20 B. | 155.66 | cum | 264 ₹41,094.24 | 264 ₹41,094.24 |
| 3.00 | Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of all materials to site and labour charges etc complete. | 43.52 | cum | 5,898 ₹2.6 L | 5,896 ₹2.6 L |
| 4.00 | Supply and Erecting Centering for all R.C.C Works including cost and conveyance of materials and labour charges etc complete | 433.6 | sqm | 547 ₹2.4 L | 547 ₹2.4 L |
| 5.00 | cement concrete 1:3:6 mix using 40 mm ISS H G Metal including Cost and Conveyanceof all materials to site and all Labour Charges etc., Complete. | 214.6 | cum | 6,181 ₹13.3 L | 6,180 ₹13.3 L |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 1.75 | sqm | 92,099 ₹1.6 L | 92,081 ₹1.6 L |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 15.6 | cum | 9,686 ₹1.5 L | 9,684 ₹1.5 L |
| 8.00 | Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 19.5 | cum | 9,010 ₹1.8 L | 9,008 ₹1.8 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 4,22,886 ₹4.2 L | 4,22,813 ₹4.2 L |
Tender Value
Refer Docs
EMD Value
₹28,050
Closing Date
11 Feb 2026, 3:00 pmClosed
Block Development Officer (VP) Namagiripet Block
Block Development Officer (VP) Namagiripet Block
Construction of Cement Concrete Check dam at Kolakkamedu H/O Unanthanagalat Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026
2026_RDTN_650827_1
378/2026/T3
Open Tender
Civil Works
Block Development Officer (VP) Namagiripet Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,050
Yes
2 Mar 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Construction of Cement Concrete Check dam at Kolakkamedu H/O Unanthanagalat Namagiripet Block of Namakkal District under Tribal Welfare Scheme 2025-2026
Earth work excavation and Depositing on Bank with in initial Lead and Lift in H.G Soil for foundation as per S.S 20 B.
Cement concrete 1:4:8 Using 40mm ISS H.G Metal including cost and conveyance of all materials to site and labour charges etc complete.
Supply and Erecting Centering for all R.C.C Works including cost and conveyance of materials and labour charges etc complete
cement concrete 1:3:6 mix using 40 mm ISS H G Metal including Cost and Conveyanceof all materials to site and all Labour Charges etc., Complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
checkdam.pdf
Tender Documents • 0.76 MB
BOQ_780386.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid