| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 LAccepted-AOC | ₹1.7 L | L-1 | Accepted-AOC Offered rate is reasonable and acceptable |
| Sl No | Description | Qty | Unit | SANGAM ELECTRICAL WORKS L1 |
|---|---|---|---|---|
| 1.00 | Copper Winding strip for HT and LT Side | 170 | Kg | 1,135 ₹1,92,950 Lowest |
| 2.00 | Cost of insulating materials 15% of Item No.1 | 1 | Job | 28,942.5 ₹28,942.5 Lowest |
| 3.00 | Labour Cost @15% of item no.1 | 1 | Job | 28,942.5 ₹28,942.5 Lowest |
| 4.00 | Assembling and dismantling of top corner, unit conservator, oil indicator, breather, fins, buchholz relay etc. work by new gas kit changing | 1 | Job | 7,000 ₹7,000 Lowest |
| 5.00 | Replacement of Cork Gasket Set 1-8mm thickness | 1 | Nos | 1,400 ₹1,400 Lowest |
| 6.00 | Replacement of Breather pot with silica gel | 1 | Nos | 4,000 ₹4,000 Lowest |
| 7.00 | Replacement of LT Bushing and Studs with Nuts & Bolts etc. | 1 | Nos | 7,200 ₹7,200 Lowest |
| 8.00 | Heating of Transformer unit to improve its insulation value | 1 | Job | 6,000 ₹6,000 Lowest |
| 9.00 | Spraying of varnish of transformer unit inner side transformer body | 1 | Job | 5,500 ₹5,500 Lowest |
| 10.00 | Less Scrap value @60% of item no.1 | 1 | Job | 1,15,770 ₹1,15,770 Lowest |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
9 Dec 2025, 5:00 pmClosed
SO(EnM), Piparwar Arrea
Office of the GM, Piparwar Area, Post Bachra, Dist Chatra (Jharkhand)
Repairing / rewinding of 500 KVA / 3.3KV/550 volt, Oil Cooled Transformer, Sl. No.A 1665 make The Hindustan Electric Co. Ltd. Installed at Ray substation under Township of Bachra , GM unit, Piparwar Area.
2025_CCL_348234_1
SO(EnM)/PPR/eNIT/25-26/34
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Bachra Township
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
23 Jun 2026
28 Nov 2025
10 Dec 2025
29 Nov 2025
9 Dec 2025
29 Nov 2025
29 Nov 2025 - 5 Dec 2025
Copper Winding strip for HT and LT Side
Cost of insulating materials 15% of Item No.1
Labour Cost @15% of item no.1
Assembling and dismantling of top corner, unit conservator, oil indicator, breather, fins, buchholz relay etc. work by new gas kit changing
Replacement of Cork Gasket Set 1-8mm thickness
Replacement of Breather pot with silica gel
Replacement of LT Bushing and Studs with Nuts & Bolts etc.
Heating of Transformer unit to improve its insulation value
Spraying of varnish of transformer unit inner side transformer body
Less Scrap value @60% of item no.1
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_360949.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .