Loading…
Loading…
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
28 Jul 2026, 6:00 pm3d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of R Wall Mohalla Puran Singh w.no.1 Pyt Thub Block Jij Bagli District Reasi under Capex Budget (PRI) for the year 2026-27.
2026_RDPR_316792_18
e-NIT No. 54 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹1,940
21 Jul 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :25 meter beyond 1 m from cutting edge | 5.01 | Cum | 586.65 | ₹2,939.12 |
| 2 | Providing and laying dry stone Aggregate of 40mm nomminal size in foundation and Plinth including all leads, lift and carriage complete | 0.83 | Cum | 1,500 | ₹1,245 |
| 3 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand)Nallah including all leads, lift and carriage complete | 8.9 | Cum | 5,402.9 | ₹48,085.81 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 9.88 | Cum | 2,793.8 | ₹27,602.74 |
| 5 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 2,000 | ₹2,000 |
| 6 | Carriage of cement from an avg. distance of 25 K.M by MT & 150 Meter by AT | 0.76 | MT | 602.89 | ₹458.2 |
| 7 | Carriage of sand from an avg. distance of 20 K.M by MT & 150 Meter by AT | 4.13 | MT | 697.99 | ₹2,882.7 |
| 8 | Carriage of stone from an avg. distance of 0 K.M by MT & 500 Meter by AT | 16.74 | Cum | 698.68 | ₹11,695.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1035814.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].