Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
29 Jul 2026, 6:00 pm4d left
XEW REW UDHAMPUR
UDHAMPUR
BOQ
2026_RDPR_315804_11
e-NIT No. 41 REW UDHAMPUR of 2026-27 Dated 13-07-2026
Open Tender
Civil Works
Percentage
60 days
XEW REW UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,880
15 Jul 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge All kinds of soil | 41 | sqm | 91.75 | ₹3,761.75 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 10 | cum | 4,826.5 | ₹48,265 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.4 | cum | 5,733.6 | ₹8,027.04 |
| 4 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge | 35.43 | SQM | 816.15 | ₹28,916.19 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 | 3.01 | CUM | 6,540.45 | ₹19,686.75 |
| 6 | 6 mm cement plaster to ceiling of mix 1 : 3 | 79.69 | SQM | 241.25 | ₹19,225.21 |
| 7 | 15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 71.58 | SQM | 306.85 | ₹21,964.32 |
| 8 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer | 151.28 | SQM | 164.6 | ₹24,900.69 |
| 9 | A) Foundations, footings, bases of columns etc. for mass concrete. | 6 | SQM | 286.35 | ₹1,718.1 |
| 10 | b) Sand | 11 | CUM | 1,072.34 | ₹11,795.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1026248.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].