| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹6.3 L (2.15%)Admitted-Finance HARIBHANPUR KALIKABARA VARANASI | BASTI | UTTAR PRADESH | 271305 | ₹3.0 Cr+₹6.3 L (2.15%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 Cr+₹73.0 L (25.0%)Admitted-Finance | ₹3.7 Cr+₹73.0 L (25.0%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 Cr+₹87.0 L (29.8%)Admitted-Finance 93 BASHIRATGANJ LUCKNOW UTTAR PRADESH 226004 | LUCKNOW | UTTAR PRADESH | 226004 | ₹3.8 Cr+₹87.0 L (29.8%) | L4 | Admitted-Finance |
| 5 | L5₹3.9 Cr+₹1.0 Cr (34.7%)Admitted-Finance | ₹3.9 Cr+₹1.0 Cr (34.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DEV CONSTRUCTION L2 | M/S GUPTA ASSOCIATES L4 | Sunil Garg and Co L3 | M/S D.A.P.L ASSOCIATES L5 | MAA PURNAGIRI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and stacking of 45-90 mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations | 961.83 | cum | 600 ₹5,77,098 Lowest | 3,422 ₹32,91,382.26 | 3,186 ₹30,64,390.38 | 3,190 ₹30,68,237.7 | 3,000 ₹28,85,490 |
| 2.00 | Supply and stacking of 45-63mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations | 1,424.94 | cum | 600 ₹8,54,964 Lowest | 3,422 ₹48,76,144.68 | 3,304 ₹47,08,001.76 | 3,405 ₹48,51,920.7 | 3,100 ₹44,17,314 |
| 3.00 | Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations | 712.47 | cum | 5,000 ₹35,62,350 | 3,540 ₹25,22,143.8 | 3,304 ₹23,54,000.88 | 3,405 ₹24,25,960.35 | 3,200 ₹22,79,904 Lowest |
| 4.00 | Same as Item No. 1 above but Crushed stone dust of approved quality and quarry. | 427.48 | cum | 1,000 ₹4,27,480 Lowest | 3,540 ₹15,13,279.2 | 3,304 ₹14,12,393.92 | 3,405 ₹14,55,569.4 | 3,000 ₹12,82,440 |
| 5.00 | Consolidation of 45-90mm gauge stobe ballast | 961.83 | cum | 100 ₹96,183 Lowest | 236 ₹2,26,991.88 | 236 ₹2,26,991.88 | 240 ₹2,30,839.2 | 150 ₹1,44,274.5 |
| 6.00 | Consolidation of 45-63mm gauge stobe ballast | 1,424.94 | cum | 100 ₹1,42,494 Lowest | 236 ₹3,36,285.84 | 236 ₹3,36,285.84 | 240 ₹3,41,985.6 | 150 ₹2,13,741 |
| 7.00 | Consolidation of 22.4-53mm gauge stobe ballast | 712.47 | cum | 600 ₹4,27,482 | 236 ₹1,68,142.92 | 236 ₹1,68,142.92 | 240 ₹1,70,992.8 | 150 ₹1,06,870.5 Lowest |
| 8.00 | Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May | 2,137.41 | cum | 10 ₹21,374.1 Lowest | 23.6 ₹50,442.88 | 25.96 ₹55,487.16 | 28 ₹59,847.48 | 35 ₹74,809.35 |
| 9.00 | Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm) | 7,124.7 | sqm | 100 ₹7,12,470 Lowest | 224.2 ₹15,97,357.74 | 230 ₹16,38,681 | 250 ₹17,81,175 | 120 ₹8,54,964 |
| 10.00 | Providing and laying of 50mm thick compacted (Avg.) bituminous macadam with 120 TPH on hot mix plant prepared/existing surface with specified graded crushed stone aggregate for base/binding course over a tack coat including of aggregates with F.E. Loader and Hot mix plant, transporting the mixed material in tipper, to site upto paver finished to the required level & grade, rolling by power roller to achieve the desirt density, Bitumin will be used for BM @ 3.40% by woight including supply of all materials, labour, T&P etc required for proper completion of the work as per direction of the Engineer in charge. | 356.24 | cum | 13,500 ₹48,09,240 | 12,980 ₹46,23,995.2 | 12,500 ₹44,53,000 | 13,500 ₹48,09,240 | 9,800 ₹34,91,152 Lowest |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
1 Mar 2023, 5:00 pmClosed
PGM (E)
A-1/4 Upsida Complex, Lakhanpur, Kanpur
Construction of 24.00 Mt. wide Road, RCC Drain and RCC Culvert at I.A Babrala, Distt. Sambhal
2023_SIDC_773232_1
cd_4_285_dt_25012023
Open Tender
Civil Works
Item Rate
90 days
Babrala
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,333
UPSIDA
₹7.4 L
13 Apr 2023
9 Feb 2023
2 Mar 2023
9 Feb 2023
1 Mar 2023
9 Feb 2023
Amount
Supply and stacking of 45-90 mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations
Supply and stacking of 45-63mm guage hard stone ballast for pot holes, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pot holes & undulations
Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations
Same as Item No. 1 above but Crushed stone dust of approved quality and quarry.
Consolidation of 45-90mm gauge stobe ballast
Consolidation of 45-63mm gauge stobe ballast
Consolidation of 22.4-53mm gauge stobe ballast
Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May
Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm)
Providing and laying of 50mm thick compacted (Avg.) bituminous macadam with 120 TPH on hot mix plant prepared/existing surface with specified graded crushed stone aggregate for base/binding course over a tack coat including of aggregates with F.E. Loader and Hot mix plant, transporting the mixed material in tipper, to site upto paver finished to the required level & grade, rolling by power roller to achieve the desirt density, Bitumin will be used for BM @ 3.40% by woight including supply of all materials, labour, T&P etc required for proper completion of the work as per direction of the Engineer in charge.
Providing and laying semi-dense buituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler , transporting the hot mix to work site by tipper , laying with paver finisher equiped with electronic sensor to the required grade , level and alignment and rolling with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction and density as per specification , complete and as per directions of engineer-in-charge.25mm completed thickness with bitumen og grade VG-30@ 5%( percentage by weight of total mix ) and lime filler @ 2% ( percentage by weight of aggegate ) prepared in batch type hot mix plant of 100-120 TPH capacity.
Brick edging on both sides of the road with Ist class bricks 8cm wide & 12cm deep laid with mud mortar including labour, & supply of bricks finished to required level & in proper alignment & also including dressing & ramming the excavated earth as directed by Engineer in charge including supply of all material labour & T&P etc required for proper completion of the work.
Earth filling in embankment in patri dressing including cost of earth & cartage beyond 5.0km including ramming and dressing the surface in required levels and slopes and also including royalty, supply of all labour T&P etc for proper completion of work.
Providing and laying of 2.5mm thick road marking strips (retroreflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shose heater driven by experienced operator on road surface including cost of material labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, complete as per direction of Engineer-in-charge and accordance with applicable specifications.
Dismantling of flexible of pavements (bituminous courses) by mechanical means and disposal of dismantled materials up to a lead of 1 kilometres,as per direction of engineer-in-charge. AOR ATTECHED
Cast-in-situ Cement Concrete M20 Kerb Providing and laying / construction of cement concrete Kerb with top and bottom width 115 and 165 mm respectively & 250mm high in M 20 grade PCC on M-10 grade foundation CC 150mm thick, foumdation havinf 50mm projection beyond kerb stone, Kerb stone laid with kerb laying machine, foundation concrete laid mannually at or near ground level factory made kerb stone of M- 25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitableshade with ordinary paint of approved brand and manufacture
Cleaning Jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared.
Preparation and consolidating OF SUB GRADE with road roller 0f 8 to 1012 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade disposal of surplus earthwith lead up to 50 metres. with road roller.
.Extra for compaction of earth work in embankment under opti- mum moisture conditions to give at least 95% of the maximum dry density ( proctor density).
Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.30kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) (iii) on WBM
Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.35kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) (iii) on Bituminous surface
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In- charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only.
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.In Foundation and floors.SOR 01-05-2022(281).Same as above 1:4:8 but in Coarse Sand
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(i) upto plinth level SOR 01-05-2022 (283 A)
Steel reinforcement for R.C.C. Work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
M/S DEV CONSTRUCTION
Sunil Garg and Co
M/S GUPTA ASSOCIATES
M/S D.A.P.L ASSOCIATES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
etenderdocument.pdf
Tender Documents • 1.18 MB
capabilitystatement.pdf
Tender Documents • 0.43 MB
feeformatn.xls
Tender Documents • 0.02 MB
BOQ_1277118.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .