Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.0 CrAdmitted-Finance 36 CHAUL PATTY ROAD BELIAGHATA KOLKATA WEST BENGAL 700010 | KOLKATA | WEST BENGAL | 700010 | ₹2.0 Cr | Admitted-Finance |
| 2 | ₹2.2 CrAdmitted-Finance | ₹2.2 Cr | Admitted-Finance |
| 3 | ₹2.2 CrAdmitted-Finance | ₹2.2 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | POWER MICA INSULATORS | VALLABH INDUSTRIES | M/S. MICA MOLD |
|---|---|---|---|---|---|---|
| 1.00HS15250 ROCKER ASSEMBLY KIT (Set of 3 Items). Each set consists of following 3 items: ITEM#1-MODI. ROCKER COMPLETE ASSY, ITEM#2-SET OF LEAD WIRE (CLAUSE NO.2.1, ITEM SL.NO.1 TO 8) AND ITEM#3- TERMINAL SUPPORT INSULATOR ASSY | ||||||
| 1.01 | MODI. ROCKER COMPLETE ASSY AS PER BHEL DRG. NO. 04392060051 REV. 04 (ALL ITEMS EXCEPT ITEM 2,3,4,5,6 & 9) AND AS PER SPEC TM10896. | 150 | Set | 1,08,00,000 ₹1.3 Cr | 1,20,00,000 ₹1.4 Cr | 1,21,50,000 ₹1.4 Cr |
| 1.02 | SET OF LEAD WIRE (CLAUSE NO.2.1, ITEM SL.NO.1 TO 8) AS PER CLW SPEC.NO.4TMS.095,028 LATEST REVISION, EACH SET CONSISTS OF FOLLOWING 8 ITEMS:-(1) 01 NO. LEAD WIRE (A)-150 MM SQ. TO CLW DRG.NO.3TWD.095.067 (2) 01 NO. LEAD WIRE(AA) -150 MM SQ. TO CLW DRG.NO.3TWD.095.068. (3) 01 NO. LEAD WIRE-150 MM SQ. TO CLW DRG.NO. 3TWD.095.069. (4) 02 NO. LEAD WIRE-150 MM SQ. TO CLW DRG.NO.3TWD.095.070 (5) 02 NO. LEAD WIRE -150 MM SQ. TO CLW DRG.NO.3TWD.095.071 (6) 01 NO. LEAD WIRE -150 MM SQ. TO CLW DRG.NO. 3TWD.095.072 (7) 01 NO. LEAD WIRE (F) -150 MM SQ. TO CLW DRG.NO.3TWD.095.073 (8) 01 NO. LEAD WIRE(FF) -150 MM SQ. TO CLW DRG.NO.3TWD.095.074 ALL ITEMS TO BE SUPPLIED WITH LATEST CLW DRG.ONLY. | 180 | Set | 57,60,000 ₹68.0 L | 57,60,000 ₹68.0 L | 58,32,000 ₹68.8 L |
| 1.03 | TERMINAL SUPPORT INSULATOR ASSY AS PER CLW DRG.NO.3TWD.092.188, ALT-5 OR LATEST, C & D NO.5560/300. | 600 | No. | 4,50,000 ₹5.3 L | 5,10,000 ₹6.0 L | 4,98,000 ₹5.9 L |
Tender Value
Refer Docs
Closing Date
22 Dec 2025, 2:00 pmClosed
SHALENDRA KUMAR YADAV /MANAGER (MNX)
Block-9/Annexe/EW/GF, BHEL, Piplani, Bhopal-462022
ITEM01-MODI. ROCKER COMPLETE ASSY. ITEM02-SET OF LEAD WIRE ITEM03-TERMINAL SUPPORT INSULATOR ASSY
2025_BHEL_55821_1
E5153244 RATE CONTRACT FOR SUPPLY OF HS15250 ROCKER ASSEMBLY KIT (Set of 3 Items)
Open Tender
Electrical Work/ Equipment
365 days
CRX, BHEL
Please find attached drg, specification QAP and NIT Terms and Conditions in Tender Documents
10 documents required · 10 mandatory
₹0
Exempted
8 Jan 2026
11 Dec 2025
22 Dec 2025
11 Dec 2025
22 Dec 2025
11 Dec 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid