Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.0 L+₹29,783 (17.7%)Admitted-Finance 1 7 VIP ROAD OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L2 | Admitted-Finance | |
| 3 | L3₹2.0 L+₹32,273 (19.2%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ARVIND ERECTORS L1 | Deen Dayal L3 | M/S National Electronics & Electricals L2 |
|---|---|---|---|---|---|---|
| 1.00 | Overhauling and maintenance of ESP CONTROL CUBICLE. | 24 | JOB | 984 ₹23,616 Lowest | 1,180 ₹28,320 | 1,200 ₹28,800 |
| 2.00 | Overhauling and maintenance of rapping control panel. | 2 | JOB | 559 ₹1,118 Lowest | 660 ₹1,320 | 650 ₹1,300 |
| 3.00 | Overhauling and maintenance of Ash level Indicator Probe and ALI Units | 48 | JOB | 862 ₹41,376 Lowest | 1,030 ₹49,440 | 950 ₹45,600 |
| 4.00 | Overhauling of rapping motor rating 0.37KW. | 52 | JOB | 618 ₹32,136 Lowest | 740 ₹38,480 | 750 ₹39,000 |
| 5.00 | Overhauling of 0.4KV Bus-Bar system | 2 | JOB | 1,265 ₹2,530 Lowest | 1,500 ₹3,000 | 1,500 ₹3,000 |
| 6.00 | Overhauling of junction box &LPB hopper heater of ESP hopper area. | 24 | JOB | 996 ₹23,904 Lowest | 1,190 ₹28,560 | 1,200 ₹28,800 |
| 7.00 | Overhauling of 0.4KV ACB’s of ESP switchgear. | 3 | EA | 1,249 ₹3,747 Lowest | 1,500 ₹4,500 | 1,500 ₹4,500 |
| 8.00 | Overhauling of 0.4KV DOL modules of ESP heater ALI and rapping ,motor. | 96 | EA | 340 ₹32,640 Lowest | 400 ₹38,400 | 400 ₹38,400 |
| 9.00 | Overhauling of ESP switchgear SFU module. | 24 | EA | 250 ₹6,000 Lowest | 295 ₹7,080 | 300 ₹7,200 |
| 10.00 | Overhauling & Testing of ESP switchgear relays. | 2 | EA | 625 ₹1,250 Lowest | 745 ₹1,490 | 750 ₹1,500 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
31 Jul 2025, 6:00 pmClosed
SE, O and MC-IV, BTPS OBRA
Office of SE, O and MC-IV, BTPS OBRA
Overhauling of ESP controllers, switchgear, Rapping motor, Rapping mechanism and heater system control of unit no.13 BTPS Obra.
2025_RVUNL_1054661_1
N-OBR/B/OMC4/EMD-2/6000008913
Open Tender
Electrical Works
Fixed-rate
30 days
obra
as per PQC
3 documents required · 3 mandatory
₹590
Dy CAO CFA and BO BTPS
₹4,000
26 Aug 2025
5 Jul 2025
2 Aug 2025
5 Jul 2025
31 Jul 2025
5 Jul 2025
5 Jul 2025 - 26 Jul 2025
Amount
Overhauling and maintenance of ESP CONTROL CUBICLE.
Overhauling and maintenance of rapping control panel.
Overhauling and maintenance of Ash level Indicator Probe and ALI Units
Overhauling of rapping motor rating 0.37KW.
Overhauling of 0.4KV Bus-Bar system
Overhauling of junction box &LPB hopper heater of ESP hopper area.
Overhauling of 0.4KV ACB’s of ESP switchgear.
Overhauling of 0.4KV DOL modules of ESP heater ALI and rapping ,motor.
Overhauling of ESP switchgear SFU module.
Overhauling & Testing of ESP switchgear relays.
M/S National Electronics & Electricals (BID ID -5390230)
Deen Dayal (BID ID -5387524)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .