| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC lowest rate quoted by the tenderer hence the tender is accepted |
| 2 | L2₹5.9 LRejected-AOC | ₹5.9 L | L2 | Rejected-AOC higher rate quoted compared to lowest tenderer quoted rate |
| Sl No | Description | Qty | Unit | SG ENGINEERING L1 | S.K.B Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the main manhole chamber to a depth of 3m including removing the silt and slush and conveying the same to outside the compound after the dry condition of sit and slush etc., complying with standard specification and as directed by the departmental officers at site of work. | 26 | No | 3,000 ₹78,000 | 3,050 ₹79,300 |
| 2.00 | Clearing the Manhole chamber including removal of silt and slush and comveying the same to out side the campound after the dry condition of silt and slush etc., complete complying withstandard specification and as directed by the departmental officers. | 108 | No | 642 ₹69,336 | 650 ₹70,200 |
| 3.00 | Clearing the sewage well of 4.50m dia to a depth of 6m and removal the silt and slush and conveying the same outside the campus after the dry condition of silt and slush by lorry to a lead of 3km inclduing labour charges for cleaning the well with cleaning materials such as bucket, rope and other connected materilals and hire charges for diesel motar including cost of diesel petrol etc., complete complying with standard specification and as directed by the departmental officers at site of work. | 2 | No | 23,000 ₹46,000 | 23,100 ₹46,200 |
| 4.00 | Renwing and refixing the drainage well pump and service and removing the silt from well, rewinding and bearing changing and refixing the same inside the drainage well including all labour charges Transportation charges, loading and unloading charges etc., complete complying with standard specification and as directed by the departmental officers at site of work. | 1 | No | 28,000 ₹28,000 | 28,100 ₹28,100 |
| 5.00 | Labour engaged for operating the sewage motor daily morning 8.30am to evening 5.45pm for the full month and watching the sewage water level in the well etc., complete complying with standard specification and as directed by the departmental officers at site of work. | 12 | month | 22,650 ₹2.7 L | 23,000 ₹2.8 L |
| 6.00 | GST at 18% | 1 | Nos | 88,764.48 ₹88,764.48 | 89,964 ₹89,964 |
Tender Value
Refer Docs
EMD Value
₹5,850
Closing Date
24 Feb 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Buildings C and M South Presidency Division Chepauk Chennai 5
Annual Maintenance of sanitary arrangements by cleaning the manhole chambers sewage well and submersible motor in the PWD Compound at Chepauk Chennai 5 For the period from April 2026 to March 2027
2026_PWD_662421_1
TNPWD/51-04/24M/2025-2026
Open Tender
Civil Works
365 days
Chepauk Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,850
15 Jun 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
Clearing the main manhole chamber to a depth of 3m including removing the silt and slush and conveying the same to outside the compound after the dry condition of sit and slush etc., complying with standard specification and as directed by the departmental officers at site of work.
Clearing the Manhole chamber including removal of silt and slush and comveying the same to out side the campound after the dry condition of silt and slush etc., complete complying withstandard specification and as directed by the departmental officers.
Clearing the sewage well of 4.50m dia to a depth of 6m and removal the silt and slush and conveying the same outside the campus after the dry condition of silt and slush by lorry to a lead of 3km inclduing labour charges for cleaning the well with cleaning materials such as bucket, rope and other connected materilals and hire charges for diesel motar including cost of diesel petrol etc., complete complying with standard specification and as directed by the departmental officers at site of work.
Renwing and refixing the drainage well pump and service and removing the silt from well, rewinding and bearing changing and refixing the same inside the drainage well including all labour charges Transportation charges, loading and unloading charges etc., complete complying with standard specification and as directed by the departmental officers at site of work.
Labour engaged for operating the sewage motor daily morning 8.30am to evening 5.45pm for the full month and watching the sewage water level in the well etc., complete complying with standard specification and as directed by the departmental officers at site of work.
GST at 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_795221.xls
BOQ • 0.29 MB
CONDITION4.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid