Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance 201 INHIBEO HOUSE PLOT NO 27 SLICE 4 SCHEME NO 78 INDORE MADHYA PRADESH 452010 | INDORE | MADHYA PRADESH | 452010 | ₹3.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INHIBEO WATER SOLUTION AND TECHNOLOGIES PVT LTD L1 |
|---|---|---|---|---|
| 1.00 | 1. Design and build sewage treatment plant of installed capacity 1.0MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of 2 Major streams with interception structures including 650 m cumulative length 150 mm DI K9 (pumping main)&320 m 500 mm DWC HDPE pipe (gravity main) and survey, design, construction of 1 No. of Intermediate Pumping station and all appurtenant structures and allied works; and
3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project | 1 | Lumpsum basis | 3,66,86,540 ₹3,66,86,540 Lowest |
Tender Value
₹3.6 Cr
EMD Value
₹1.8 L
Closing Date
7 Oct 2024, 5:30 pmClosed
CHIEF MUNICIPAL OFFICER
OFFICE OF THE NAGAR PARISHAD, GAUTAMPURA, DIST-INDORE
INTERCEPTION AND DIVERSION OF NALLAHS WITH STP WORKS PROJECT OF GAUTAMPURA TOWN UNDER SBM 2.0
2024_UAD_371153_1
313 Dated 20-09-2024
Open Tender
Civil Works - Others
Lump-sum
360 days
GAUTAMPURA 453220
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹1.8 L
5 Nov 2024
23 Sept 2024
9 Oct 2024
23 Sept 2024
7 Oct 2024
25 Sept 2024
Amount
1. Design and build sewage treatment plant of installed capacity 1.0MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of 2 Major streams with interception structures including 650 m cumulative length 150 mm DI K9 (pumping main)&320 m 500 mm DWC HDPE pipe (gravity main) and survey, design, construction of 1 No. of Intermediate Pumping station and all appurtenant structures and allied works; and 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .