Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | Admitted-Finance |
| 3 | Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Finance |
| 4 | Admitted-Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹21,700
Closing Date
6 Jul 2021, 2:00 pmClosed
SE GCC CBE
182,DR.SUBBARAYAN STREET, TATABAD, COIMBATORE DT - 641 012.
Providing stub setting, concreting, earthing and erection of various types of towers for making LILO of the existing Madhampatty Devarayapuram 110 KV feeder at the proposed Karunyanagar 110/22 KV Sub-Station at Mathuvarayapuram. (Loc 51 to 55).
2021_EB_203505_1
02/2021-22 of SE GCC CBE
Open Tender
Civil Works
Works
90 days
Coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,700
Yes
28 Jul 2021
24 Jun 2021
6 Jul 2021
24 Jun 2021
6 Jul 2021
24 Jun 2021
Amount
Clearing Light jungle and disposing off to a place away from the site as directed by the Engineer in charge including all Labour charges,T&Ps etc., complete.
Surveying and pitmarking of various tower location inlcuding hire charges for theodolite instrument, cost of all materials labour, lead, lift, etc., complete.
Earth work excavation for foundation in hard gavelly soil, stiff black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete.
Earth work excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts, etc., complete for foundation.
Earth work excavation for foundation in hard rock by wedging, chisseling and trimming to proper shape where blasting is prohibited including all leads, lifts, etc., complete.
PCC 1 : 3 : 6 using 20mm metal without form work including cost of all materials, lead, lift, curing, etc., complete.
Transporting of template and stubs, cleats for KCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete.(stub & cleat will be supplied by TANTRANSCO at department stores)
PCC 1:2:4 using 20mm metal (machine crushed) with form work for Frustum concrete including cost of all materials, lead, lift, curing, etc., complete including cost of frustum box etc. (for Frustum)
PCC 1:2:4 using 20mm metal metal (machine crushed) with Chimney form work for tower chimney concrete including cost of all materials, lead, lift, curing, etc., complete including cost of chimney box etc. (For Chimney)
Providing pipe type earthing including necessary excavation for fixing 3m long 40mm dia GI "B" class pipe and refilling with excavated earth mixed with salt charcoal and connecting the earthstrip with the leg of the stub including all cost of all materials, lead, lift, etc., complete.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Transporting of excess earth excavated and disposing them with in a lorry lead of 5 KM including all lead, lift, labour chrges, etc., complete.
Plastering the concrete surface in CM 1:3, 12mm thick including cost of all materils, lead, lift, curing, labour charges, etc., complete.
Transporting & Erection of Tower Parts including Sorting out at stores and site rectification of defects in tower parts if any at the time of erection of Tower Parts at Site, tightening, Punching of Bolt and nuts including transporting charges, Cost of T&P'S, all materials, labour, lead, lift, etc., complete. (Including Bolt & Nuts )
Tack welding ( Three Tacks )of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour, transport charges, etc., complete.
Dewatering charges including rent of Pump rent of Generator, labour lead lift etc complete as per Standard Specification.
Painting with anti corrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including cost of all materials, lead, lift, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
R K and Co
sai pranesh infrastructures
M s Kumaresan and co
PERUMAL.S.K
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .