Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAdmitted-Finance PUNAI DARU HAZARIBAG | EAST SINGHBUM | JHARKHAND | 831001 | ₹6.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.3 Cr+₹24.1 L (3.98%)Admitted-Finance | ₹6.3 Cr+₹24.1 L (3.98%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.K. CONSTRUCTION L2 | M/S Neha Construction L1 |
|---|---|---|---|---|---|
| 2.00Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump | |||||
| 2.01Designing, Supplying, Installation, Testing & Commissioning with all tools & Parts of following Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump Suitable for minimum 125mm x 115mm bore well as per MNRE Guideline with following specifications & accessories. | |||||
| 2.02SPV arrays contains specified No of same capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PV modules should be minimum 200 watt peak. | |||||
| 2.03i) The SPV modules should be as per IEC-61215 and IEC 61730 part 1.0) | |||||
| 2.04ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required. | |||||
| 2.05iii) The PV modules should be mounted on metallic structure of adequate strength and appropriate design which can withstand load of modules & High wind pressure up to 200Km/h. | |||||
| 2.06iv) The module mounting structure should be hot dip galvanized according to IS 4759. | |||||
| 2.07v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle Adjustment should be provided | |||||
| 2.08vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. (As per MNRE Specification) | |||||
| 2.09vii) Necessary protection such as lightening arrestor etc. should be provided to protect the controller & SPV | |||||
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
10 Jan 2023, 5:00 pmClosed
Executive Engineer D.W. and S. Div. Jhumritelaiya
At Pani Tanki Campus Lakhibagi Koderma
Construction of SVS Cluster based on Solar Energy Based Mini RWSS in different blocks of Koderma District House Connection and 5 year OM on Turn key basis under D W and S Division Jhumritelaiya for the year 2022-23 (SVS Cluster 01A)
2022_DWSD_64495_1
JMT SVS CLUSTER 20/JMT/2022-23
Open Tender
Civil Works
Item Rate
270 days
D. W. and S. Division Jhumritelaiya
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Executive Engineer D.W. and S. Div. Jhumritelaiya
₹5.8 L
EIC DWSD JHARKHAND RANCHI
28 Jan 2023
29 Dec 2022
12 Jan 2023
29 Dec 2022
10 Jan 2023
30 Dec 2022
3 Jan 2023
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .