Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC 122 HARI ENCLAVE BULANDSHAHR DISTT BULANDSHAHR U P 203001 | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | 203001 | ₹1.1 Cr | 1 | Accepted-AOC ACCEPT |
| 2 | 2₹1.1 Cr+₹60,550 (0.56%)Rejected-Finance | ₹1.1 Cr+₹60,550 (0.56%) | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
12 Feb 2021, 12:00 pmClosed
Superintending Engineer
I.W.C. Mathura
CONSTRUCTION OF V.R.B.
2021_UPIDC_546319_23
05/SE/2020-21
Open Tender
Civil Works - Canal
Item Rate
180 days
I.W.C. Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹2.2 L
2 Jul 2021
6 Feb 2021
12 Feb 2021
6 Feb 2021
12 Feb 2021
6 Feb 2021
Amount
Earthwork in excavation of foundation in all type of soil with back filling i/c all lead and lift with all cost of material, labour and T&P.
Providing and laying C.C 1:2:4 (M-15) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P.
Providing and laying C.C 1:1.5:3 (M-20) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P.
Providing and laying R.C.C 1:1:2 (M-25) with coarse sand & stone aggregate of size 10 to 20 mm including all cost of material,labour and T&P. But excluding cost of steel reinforcement.
Providing and laying C.C 1:1:2 with coarse sand & Stone Aggregate of size 10 to 20 mm i/c all cost of material,labour and T&P etc.
Centering and shuttering for RCC and CC work including all cost of material, labour and T&P.
Surface Dewatering by 5.00 HP diesel pump set with all arrengement for construction of foundation. Assume shall be used for 20 hrs average per day for 20 days for work upto bed level.
Supplying Laying of one layer of Tar felt I.S.I marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c cost of all material ,labour and T&P
Steel reinforcement with cutting bending, binding, and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P.
Supplying and filling E.C bags with earth filled and placing with in 60 mtr distance for making Bundh including all cost of material, labour and T&P.
Earth work in filling for making bund Lead up to 700M & lift up to 1.5 M with ramming and dressing etc complete
Earth work in cutting for remoal of Bundha i/c lift upto 1.50m & lead upto 30m. with ramming and Dressing.
S/F 75 mm dia P V C Pipe for weep holes.
Dismenteling of R.B or R.C.C with disposal of dismenteled material with in 60 m distance.
Dismantling of Bricks or stone masonry in lime or cement i/c stacking of material with in 60 mtrs. Distance.
P/fixing of sign board all cost of material, labour and T&P.
M/S GEE PEE ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .