Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.2 LAdmitted-Finance | -24.00% | ₹20.2 L | L1 | Admitted-Finance |
| 2 | L2₹24.4 L+₹4.3 L (21.1%)Admitted-Finance | -7.95% | ₹24.4 L+₹4.3 L (21.1%) | L2 | Admitted-Finance |
| 3 | L3₹24.6 L+₹4.4 L (21.7%)Admitted-Finance | -7.50% | ₹24.6 L+₹4.4 L (21.7%) | L3 | Admitted-Finance |
| 4 | L4₹25.9 L+₹5.7 L (28.4%)Admitted-Finance | -2.40% | ₹25.9 L+₹5.7 L (28.4%) | L4 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹53,104
Closing Date
15 Jun 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, CD, APWD, Diglipur
Replacement of filter media of Water Treatment Plant at Nabagram under SD-III, CD, APWD., Diglipur
2026_APWD_23231_1
NIT No. 12/EE/CD/APWD/DP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Filter media Nabagram, Diglipur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹53,104
15 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
15 Jun 2026
6 Jun 2026
5 Jun 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Removing and stacking of existing filter media from filter unit including lift up to 6.00 metre and lead upto 50 metre as per direction of Engineer-in-charge. | |||||
| 1.01 | River Sand | - | cum | 1,232.8 | - |
| 1.02 | Stone aggregate of different size | 1 | cum | 1,232.8 | ₹1,231.57 |
| 2Providing and filling of filter media in filter bed unit (rate inclusive of all materials, labours & scaffolding etc. including lead & lift). | |||||
| 2.01 | River sand (coarse) of effective size 0.15 mm to 0.30 mm as per IS 11401 (Part 2) : 1990 including levelling dressing etc. all complete. | 1 | cum | 14,181.8 | ₹14,167.62 |
| 2.02 | Stone aggregate of effective size 40-63 mm including levelling etc. complete. | - | cum | 4,080.4 | - |
| 2.03 | Stone aggregate of effective size 20-40 mm including levelling etc. complete. | - | cum | 3,981.85 | - |
| 2.04 | Stone aggregate of effective size 6-20 mm including levelling etc. complete. | - | cum | 4,535.55 | - |
| 3 | Shifting of existing RCC precast perforated slab/CC cubes inside the filter bed, cleaning/washing/removal of silt/algae and rearranging the perforated slabs/cubes in position as per the direction of Engineer-in-charge. | - | sqm | 400.9 | - |
| 4 | Cleaning the walls of filter units including scrubbing to remove algae and biofilm , high pressure washing, chemical treatment with alkaline treatment with Sodium Hydroxide (NaOH) to remove organic matter and biofilm and disinfection with bleaching powder ( CaOcl2) i/c ( the cost of scaffolding and all the materials and labours). | - | sqm | 39.4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
TenderDocumentNIT12.pdf
Tender Documents • 5.06 MB
BOQ_24629.xls
BOQ • 0.30 MB
Corrigendum2297.pdf
PDF • 0.57 MB
Corrigendum2297.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .