| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.4 LAccepted-AOC | ₹51.4 L | 1 | Accepted-AOC 1 |
| 2 | 2₹51.9 LRejected-Finance GAM DEDAUNA PO SANAYA TIWARI JANPAD GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹51.9 L | 2 | Rejected-Finance 2 |
| 3 | 3₹52.8 LRejected-Finance 3698 SHAHI GALI MODDIPUR GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹52.8 L | 3 | Rejected-Finance 3 |
| 4 | Rejected-Technical 10 15 | AYODHYA | UTTAR PRADESH | 224001 | - | - | Rejected-Technical Rejected as per Prahari |
Tender Value
₹67.7 L
EMD Value
₹5.4 L
Closing Date
30 Apr 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of Sipahi Tola link road from PWD road in Suras via Madhai Tola via Lohar Tola via Kalan Tola In the financial year 2025-26 including 05 years maintenance repair Lot No 1 of 1
2026_CEGKP_1138772_1
2744/135C-Gkp Circle/2026 Dated 08-04-2026
Open Tender
Civil Works
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.4 L
29 May 2026
18 Apr 2026
30 Apr 2026
18 Apr 2026
30 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. (MoRD Sl. No.-3.4 and Specification No.-301.5), (Excluding Royalty), (Including Labour Cess), (GST will be paid extra as applicable). | - | Cum | - | - |
| 2 | Granular Sub-Base with Well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting to 12.5cm/11cm (compacted thickness) with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification Clause 401. (MoRD Sl. No.-4.1 and Specification No.-401), (Including Labour Cess and Royalty), (GST will be paid extra as applicable). | - | Cum | - | - |
| 3 | Cement Treated base
Providing, Laying and Spreading Material on a prepared sub base, cement @4% by weight of spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base as per MoRTH technical specification clause 405. (including Labour cess and royalty) (GST will be paid extra as applicable). | - | Cum | - | - |
| 4 | Tack Coat
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503. (MoRD Sl. No.-5.2 and Specification No.-503), (Including Labour Cess and cost of Bitumen VG-10), (GST will be paid extra as applicable). | - | Sqm | - | - |
| 5 | 20 mm Thick Open Graded Premix Carpet
Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat. (MoRD Sl. no. 5.9 and Specification no. 508), (including Labour cess, royalty and cost of Bitumen VG-10) (GST will be paid extra as applicable). | - | Sqm | - | - |
| 6 | Seal coat type "C"
Providing and applying seal coat type "C" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades. (MoRD Sl. no. 5.12 and Specification no. 510), (including Labour cess, royalty and cost of Bitumen VG-10) (GST will be paid extra as applicable). | - | Sqm | - | - |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. (Excluding Royalty) (MoRD Sl. No.-3.14 and Specification No.-303.1), (Including Labour Cess), (GST will be paid extra as applicable). | - | Cum | - | - |
Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024/lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0vkj0,e0lh0@ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 7 Rs. 6729812.00 @ Zero percent & for 2nd year @ 0.75% | - | Job | - | - | |
For 3rd year @ 1.50% | - | Job | - | - | |
For 4th year @ 2.25% | - | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_2126180.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid