Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹23.1 LAccepted-AOC | ₹23.1 L | l1 | Accepted-AOC l1 |
| 2 | l2₹23.1 L+₹694 (0.03%)Rejected-Finance GARHWA | LATEHAR | JHARKHAND | 822112 | ₹23.1 L+₹694 (0.03%) | l2 | Rejected-Finance not l1 bidder |
| 3 | l5₹26.5 L+₹3.4 L (14.7%)Rejected-Finance FLAT NO 3 3RD FLOOR EDEN MOORE 15 A 1 MANIK BANDYOPADHYAY SARANI MANIK BANDYOPADHYAY SARANI KOLKATA WEST BENGAL 700040 | KOLKATA | WEST BENGAL | 700040 | ₹26.5 L+₹3.4 L (14.7%) | l5 | Rejected-Finance not l1 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical eVEN IN RESPONSE TO tq, BIDDER DID NOT SUBMIT EMD |
| 5 | Rejected-Technical | - | - | Rejected-Technical eVEN IN RESPONSE TO tq, BIDDER DID NOT SUBMIT EMD |
Tender Value
₹32.0 L
EMD Value
₹8,000
Closing Date
27 Sept 2024, 6:55 pmClosed
SPM INDANE BOTTLING PLANT BARAUNI
INDANE BOTTLING PLANT BARAUNI
50 KWP solar plant plus allied works and transfer of data to central sever
2024_BSO_180655_1
BRNBP/2024-25/CAPITAL/LT-04
Limited
Lump Sum TurnKey
Lump-sum
45 days
INDANE BOTTLING PLANT BARAUNI
5 documents required · 5 mandatory
₹8,000
Yes
14 Oct 2024
20 Sept 2024
28 Sept 2024
20 Sept 2024
27 Sept 2024
24 Sept 2024
20 Sept 2024 - 23 Sept 2024
Amount
Part A1SUPPLY OF PLANT & EQUIPMENT INCLUDING SPARES AND ALLIED SERVICES OF INSTALLATION & OTHER WORKS
Supply of Plant & Equipment including Spares and Allied Services of Installation & Other Works including Allied Civil, Mechanical, and Electrical Works including Integrated Sprinkler Cleaning System for the proposed 50 kWp Solar Plant and existing 50 kWp Solar Plant As per existing regulation, 12% GST Ratewill be applicable on 70% of the gross value and 18% GST rate will be applicable on 30% of the gross value. However, GST shall be paid on actual basis based on supporting documents submitted. Quoted Amount exclusive of GST shall only be considered in evaluation of the L1 bidder.
Data Management Transfer for proposed and existing 50 kWp Solar Plant to MIS PC in Control Room, with customized MIS Report generation and transfer of data to IOCL Central Server 18% GST rate will be applicable
Part A2 Operation & Maintenance of Solar Power Generating System for 1 Year after commissioning of the system
Operation & Maintenance of Solar Power Generating System for 1 Year
Patrt B Operation and Maintenance (O&M) for 1st year after completion of Part A
Operation and Maintenance (O&M) for 1st year after completion of Part A
Rudra Energy & Services
SUNSHELL POWER
NATURETECH INFRASTRUCTURE PVT. LTD
Gosolar Power Systems
Bharat Saur Urja
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .