Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹16.8 L Annual Comprehensive maintenance of fountain and street light installed at Gate No. 11 at South Block, New Delhi. (SH: SITC of openwell submersible pump, Underwater LED light, ring, Controller etc. as reqd.) | Annual Comprehensive maintenance of fountain and street light installed at Gate No. 11 at South Block, New Delhi. (SH: SITC of openwell submersible pump, Underwater LED light, ring, Controller etc. as reqd.) | L1 |
| Sl No | Description | Qty | Unit | Friends Group of Consultants L1 |
|---|---|---|---|---|
| 1 | Item as per NIT schedule of work. | - | - | -17 ₹16,79,495.04 Lowest |
Tender Value
₹20.2 L
EMD Value
₹40,470
Closing Date
23 Jan 2026, 3:50 pmClosed
EE(E)-I
Ravinder Pal
EE(E), DED-101, CPWD, North Block, New Delhi.
Annual Comprehensive maintenance of fountain and street light installed at Gate No. 11 at South Block, New Delhi. (SH: SITC of openwell submersible pump, Underwater LED light, ring, Controller etc. as reqd.)
139835
264/EE(E)/DED-101/2025-26
OPEN
Electrical and Maintenance Works
NCB
15 days
New Delhi, Delhi
1 document required · 1 mandatory
₹40,470
In the office of Executive Engineer (E), DED101, CPWD, North Block, New Delhi.
23 Jan 2026
14 Jan 2026
23 Jan 2026
23 Jan 2026
17 Jan 2026
17 Jan 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT264DED101202526.pdf
document • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .